Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 191
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-43 Standard Reliability 5 Back Up Disk 1. Type backup disk and p ress En t e r to backup all changed files. 2. Type test stored-data long and press En t e r. This instructs the system to verify the c onsistenc y of the MSS files (on the d isk and removab le med ia). Return Replaced Equipment Return unused G2 eq uip ment to Luc ent Tec...
Page 192
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-44 High Reliability 5 High Reliability Required Hardware The eq uip ment in Table 5-10 must be on-site before the upgrade begins. To plac e a claim for missing equipment, as part of the Streamlined Implementation p roc ess, c all 1-800-772-5409, or the numb er p rovid ed b y your Luc ent Tec hnolog ies rep resentative. Table 5-10....
Page 193
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-45 High Reliability 5 Required Tools The following tools and items may b e req uired d uring the up g rad e: nHig h-intensity flashlig ht or AC d rop lig ht n3/8-inc h flat-b lad e sc rewd river with a 10-inc h shank (minimum) n5/16-inc h and 1/4-inc h soc kets with a ratc het and 10-inc h extension nLong -nose p liers to d isc onnec t...
Page 194
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-46 High Reliability 5 Check Link Status 1. Type display communication-interface links and p ress En te r. Write d own all enab led links. 2. Type status link number and p ress En t e r. Rep eat this step for all links. 3. Write d own whic h links are in servic e. Disable TTI !CAUTION: If you d o not d isab le the TTI, the translations...
Page 195
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-47 High Reliability 5 Disconnect Cables 1. With the c ab le retainer in front of you and the p art numb er visib le (4B or 4C), loc ate the slot that is almost vertic al. This slot is ad jac ent to the p art numb er. Insert a #2 flat b lad e sc rewd river into the slot and twist. The retainer will snap op en easily. Remove the c able....
Page 196
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-48 High Reliability 5 2. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or TDM terminator to Slot 02. On p ort c arriers J58890BB-2 and J58890BB-3, c onnec t the TDM c ab les to Slot 01. Figure 5-10. TDM/LAN Connections for High Reliability System Figure Notes 1.Port Carrier (“ C” Position) 2. ZAHF4 TDM/LAN Terminator 3. TDM/LAN...
Page 197
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-49 High Reliability 5 3.Disc onnec t the 16 g round strap s from the top and b ottom of the “ A” c arrier. See Figure 5-11 . These strap s rec onnec t to the new “ A” c arrier. Figure 5-11. Locations of Ground Jumpers Figure Notes 1. Rear of Cab inet 2. Port Carrier (“ C” Position) 3. Ground Jump ers4. Mod ule Control Carrier (“ A”...
Page 198
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-50 High Reliability 5 4.Disc onnec t the “ P1” and “ P2” c ab les from the “ A” c arrier. See Figure 5-12. 5. Slid e the latc h up , and d isc onnec t the “ P1” c ab le from the “ B” c arrier. Figure 5-12. Location of P1 and P2 Connectors 6. Remove the fan trim p late by p ulling it straig ht off. 7. Clean or rep lac e the air...
Page 199
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-51 High Reliability 5 Unpack and Inspect Expansion Control Carrier 1. Insp ec t the new J58890AF Exp ansion Control Carrier for any d amag e. Also verify that the b ac kp lane p ins are not b ent. 2. Plac e the exp ansion c ontrol c arrier on the floor so that the rear of the carrier faces up. 3.Install the CFY1 c urrent limiter (CURL) on...
Page 200
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-52 High Reliability 5 9.Connec t the remaining end of the TDM/LAN c able (b etween the “ A” and “ D” c arriers) to the pin-field bloc k marked “ TDM” on the rig ht sid e of the “A” carrier. See Figure 5-13 and Table 5-11. The other end remained c onnec ted to the “ D” c arrier when the old c arrier was removed . 10. Connec t...