Home > Yamaha > Motorcycle > Yamaha Fz6 N Service Manual

Yamaha Fz6 N Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Yamaha Fz6 N Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 538
    							
    CABLE ROUTING
    2-56
    FZ6-SA/FZ6-SAHG1. Rear brake light switch lead
    2. Rear wheel sensor lead
    3. Neutral switch lead
    4. ABS motor coupler
    5. Fuel tank breather hose
    6. Crankshaft position sensor lead
    7. Right handlebar switch lead
    8. O
    2 sensor lead
    9. Bracket
    10.Fuel tank drain hose
    11.Hydraulic unit drain hose
    12.Rear brake reservoir hose
    13.Clamp
    14.Brake hose holder
    A. Pass the fuel tank breather hose, fuel tank  drain hose, hydraulic unit drain hose and 
    brake light switch lead through the guide of 
    the stay assembly 2.
    B. Clamp the tail/brake light switch lead  together with the rear wheel sensor lead, 
    O
    2 sensor lead and the neutral switch lead.
    C. To the starter motor
    D. Install the right handlebar switch lead cou- pler through the hole of the bracket 2 from 
    the downside.
    E. Route the starter motor lead by the inner  side of the air cut-off valve hose.
    F. Pass the ignition coil leads #1 and #4  through inner side of the air cut-off valve 
    hose, and then between the frame and 
    bracket 2.
    G. Pass the right handlebar switch lead  through the hole located on the right side 
    of the frame.
    H. Route the right handlebar switch lead  under the bracket 2.
    I. Route the coolant reservoir tank hose  under the cover 2. Route the radiator hose 
    (outside) outside.
    J. Route the radiator hoses (2 pieces) under  the cover 2.
    K. Route the crankshaft position sensor lead  inner side of the radiator hose.
    L. Pass the hydraulic unit drain hose through  the clamp of muffler stay. 
    Align the protrusion allowance from the 
    clamp with the fuel tank drain hose.
    M. Pull down the mark-painted sections of the  fuel tank breather hose and fuel tank drain 
    hose to be lower than the clamp position of 
    the muffler stay. Any order to take out the 
    fuel tank breather hose and fuel tank drain 
    hose can be accepted.
    N. 0–20 mm (0–0.79 in)
    O. Route the O
    2 sensor lead by the outer side 
    of the vehicle as viewed from the rear tail/
    brake light switch lead. P. Clamping position should be at the center 
    of bend-R as shown in the illustration for 
    the rear brake reservoir tank hose.
    Q. Insert the front wheel sensor lead between  the bosses.
    R. Route the front wheel sensor lead by the  inner side of the front brake hose.
    S. Pass the hose and lead through the clamp  and insert the clamp into the bracket.
    T. Clamp the O
    2 sensor lead to the front side 
    of the vehicle.
    U. Outside of the vehicle
    V. Attach the clamp so that the opening may  be turned to the Outside of the vehicle.
    W. Clamp the brake hose and the wire part in  the rear side of the brake hose holder. 
    						
    							
    CABLE ROUTING
    2-57
    FZ6-N/FZ6-NHG(W) 
    						
    							
    CABLE ROUTING
    2-58
    FZ6-N/FZ6-NHG(W)1. Rear brake light switch lead
    2. Neutral switch lead
    3. Fuel tank breather hose
    4. Crankshaft position sensor lead
    5. Throttle cables
    6. Meter and left handlebar switch lead
    7. Right handlebar switch lead
    8. Wire harness
    9. O
    2 sensor lead
    10.Bracket
    11.Fuel tank drain hose
    12.Rear brake reservoir hose
    13.Left handlebar switch lead
    A. Pass the fuel tank breather hose, fuel tank  drain hose and brake light switch lead 
    through the guide of the stay assembly 2.
    B. Clamp the tail/brake light switch lead  together with the O
    2 sensor lead and the 
    neutral switch lead.
    C. To the starter motor
    D. Install the right handlebar switch lead cou- pler through the hole of the bracket 2 from 
    the downside.
    E. Route the starter motor lead by the inner  side of the air cut-off valve hose.
    F. Pass the ignition coil leads #1 and #4  through inner side of the air cut-off valve 
    hose, and then between the frame and 
    bracket 2.
    G. Pass the throttle cable through the hole  located on the right side of the frame. 
    Route the throttle cable above the wire har-
    ness.
    H. To the sub-wire harness
    I. Pass the right handlebar switch lead  through the hole on the right side of the 
    frame. Route it under the inside of the 
    throttle cable and wire harness.
    J. Route the right handlebar switch lead  under the bracket 2.
    K. Route the coolant reservoir tank hose  under the cover 2. Route the radiator hose 
    (outside) outside.
    L. Route the radiator hoses (2 pieces) under  the cover 2.
    M. Route the crankshaft position sensor lead  inner side of the radiator hose.
    N. Pull down the mark-painted sections of the  fuel tank breather hose and fuel tank drain 
    hose to be lower than the clamp position of 
    the muffler stay. Any order to take out the 
    fuel tank breather hose and fuel tank drain 
    hose can be accepted.
    O. 0-20 mm (0-0.79 in)
    P. Route the O
    2 sensor lead by the outer side 
    of the vehicle as viewed from the rear tail/
    brake light switch lead. Q. Clamping position should be at the center 
    of bend-R as shown in the illustration for 
    the rear brake reservoir tank hose.
    R. Pass the fuel tank breather hose, fuel tank  drain hose and O
    2 sensor lead through the 
    clamp and insert them to the bracket.
    S. Clamp the O
    2 sensor lead to the front side 
    of the vehicle.
    T. Outside of the vehicle.
    U. Attach the clamp so that the opening may  be turned to the outside of the vehicle.
    V. To the sub-wire harness.
    W. Pass the right handlebar switch lead  through the hole on the right side of the 
    frame. Route it under the inside of the 
    throttle cable and wire haress. 
    						
    							
    CABLE ROUTING
    2-59
    FZ6-NA/FZ6-NAHG 
    						
    							
    CABLE ROUTING
    2-60
    FZ6-NA/FZ6-NAHG1. Rear brake light switch lead
    2. Rear wheel sensor lead
    3. Neutral switch lead
    4. Hydraulic unit motor coupler
    5. Fuel tank breather hose
    6. Crankshaft position sensor lead
    7. Throttle cables
    8. Meter and left handlebar switch lead
    9. Right handlebar switch lead
    10.Wire harness
    11.O
    2 sensor lead
    12.Bracket
    13.Fuel tank drain hose
    14.Hydraulic unit drain hose
    15.Rear brake reservoir hose
    16.Left handlebar switch lead
    17.Clamp
    18.Brake hose holder
    A. Pass the fuel tank breather hose, fuel tank  drain hose, hydraulic unit drain hose and 
    brake light switch lead through the guide of 
    the stay assembly 2.
    B. Clamp the tail/brake light switch lead  together with the rear wheel sensor lead, 
    O
    2 sensor lead and the neutral switch lead.
    C. To the starter motor
    D. Install the right handlebar switch lead cou- pler through the hole of the bracket 2 from 
    the downside.
    E. Route the starter motor lead by the inner  side of the air cut-off valve hose.
    F. Pass the ignition coil leads #1 and #4  through inner side of the air cut-off valve 
    hose, and then between the frame and 
    bracket 2.
    G. Pass the throttle cable through the hole  located on the right side of the frame. 
    Route the throttle cable above the wire har-
    ness.
    H. To the sub-wire harness
    I. Pass the right handlebar switch lead  through the hole located on the right side 
    of the frame.
    J. Route the right handlebar switch lead  under the bracket 2.
    K. Route the coolant reservoir tank hose  under the cover 2. Route the radiator hose 
    (outside) outside.
    L. Route the radiator hoses (2 pieces) under  the cover 2.
    M. Route the crankshaft position sensor lead  inner side of the radiator hose.
    N. Pass the hydraulic unit drain hose through  the clamp of muffler stay. Align the protru-
    sion allowance from the clamp with the fuel 
    tank drain hose. O. Pull down the mark-painted sections of the 
    fuel tank breather hose and fuel tank drain 
    hose to be lower than the clamp position of 
    the muffler stay. Any order to take out the 
    fuel tank breather hose and fuel tank drain 
    hose can be accepted.
    P. 0-20 mm (0-0.79 in)
    Q. Route the O
    2 sensor lead by the outer side 
    of the vehicle as viewed from the rear tail/
    brake light switch lead.
    R. Clamping position should be at the center  of bend-R as shown in the illustration for 
    the rear brake reservoir tank hose.
    S. Insert the front wheel sensor lead between  the bosses.
    T. Route the front wheel sensor lead by the  inner side of the front brake hose.
    U. Pass the hose and lead through the clamp  and insert the clamp into the bracket.
    V. Clamp the O
    2 sensor lead to the front side 
    of the vehicle.
    W. Outside of the vehicle
    X. Attach the clamp so that the opening may  be turned to the outside of the vehicle.
    Y. To the sub-wire harness.
    Z. Pass the right handlebar switch lead  through the hole on the right side of the 
    frame. Route it under the inside of the 
    throttle cable and wire harness.
    AA.Clamp the brake hose and the wire part in  the rear side of the brake hose holder. 
    						
    							
    CABLE ROUTING
    2-61
    FZ6-S/FZ6-SHG(W) 
    						
    							
    CABLE ROUTING
    2-62
    FZ6-S/FZ6-SHG(W)1. Main switch a nd immobilizer lead
    2. Stay assembly
    3. Left handlebar switch lead
    4. Clutch cable
    5. Throttle cables
    6. Battery negative lead coupler
    7. Starter relay lead
    8. Battery negative lead
    9. Fuel tank drain hose
    10.Rectifier/regulator
    11.Turn signal relay
    12.Radiator fan motor relay
    13.Starting circuit cut-off relay
    14.Clamp
    15.License plate light lead
    16.Rear right turn signal light lead
    17.Rear left turn signal light lead
    18.Dimmer relay
    19.Speed sensor lead
    20.Sidestand switch lead
    21.Oil level switch lead
    22.AC magneto lead
    23.Front brake hose
    24.Throttle cable (return side)
    25.Throttle cable (pull side)
    26.Radiator fan motor lead
    A. Route the throttle cables above the stay  assembly 1.
    B. Route the main swit ch and immobilizer 
    lead above the clutch cable.
    C. Line up the left handlebar switch lead cou- pler and radiator fan motor lead coupler 
    behind the head pipe.
    D. Route the clutch cable over the wire har- ness.
    E. To the immobilizer
    F. To the main switch
    G. Place three couplers on the flange of the  cover.
    H. To the fuel pump
    I. Clamp four wire leads. There should be no  excessive slack on the wire leads.
    J. To the fuel tank
    K. Either installation position can be  accepted, but make sure that the leads are 
    not crossed.
    L. Clamp the rear turn signal lead and license  plate light lead to the frame. Hook the 
    clamp to the bracket. Pull out the lead suffi-
    ciently to the frame side and route it along 
    with the side of the back stay. Cut the tip of 
    the clamp to be between 1 and 5 mm (0.04 
    and 0.20 in) upward. M. Clamp the rear turn signal light lead and 
    license plate light lead to the frame. Cut the 
    tip of the clamp to be between 1 and 5 mm 
    (0.04 and 0.20 in).
    N. Gap between the lead and muffler should  be 10 mm (0.39 in) or more.
    O. Coupler should not run on the relay assem- bly.
    P. To the tail/brake light
    Q. To the license plate light
    R. To the rear right turn signal light
    S. To the rear left turn signal light
    T. To the engine
    U. Route the speed sensor lead behind the  starter motor lead
    V. Point the bend-R section of the throttle  cable (pull side) to the inner side horizon-
    tally. It is also possible to visually check the 
    bend-R section.
    W. To the headlight lead
    X. Clamp the seat lock cable to the frame as  shown in the illustration. Secure the clamp 
    to the weld of the cross member with the 
    frame. Position the binding section in front 
    of the vehicle body and cut the tip to be 
    between 1 and 5 mm (0.04 and 0.20 in).
    Y. Point the tip of the clamp to the inner side  of the vehicle body. 
    						
    							
    CABLE ROUTING
    2-63
    FZ6-SA/FZ6-SAHG 
    						
    							
    CABLE ROUTING
    2-64
    FZ6-SA/FZ6-SAHG1. Main switch a nd immobilizer lead
    2. Stay assembly
    3. Left handlebar switch lead
    4. Clutch cable
    5. Throttle cables
    6. Battery negative lead coupler
    7. Starter relay lead
    8. Battery negative lead
    9. Fuel tank drain hose
    10.Hydraulic unit lead
    11.Rectifier/regulator
    12.Turn signal relay
    13.Radiator fan motor relay
    14.Starting circuit cut-off relay
    15.Clamp
    16.License plate light lead
    17.Rear turn signal light lead (right)
    18.Rear turn signal light lead (left)
    19.Dimmer relay
    20.Speed sensor lead
    21.Sidestand switch lead
    22.Oil level switch lead
    23.AC magneto lead
    24.Front brake hose
    25.Throttle cable (return side)
    26.Throttle cable (pull side)
    27.Radiator fan motor lead
    28.ABS check coupler
    29.Connector
    A. Route the throttle cables above the stay  assembly1.
    B. Route the main swit ch and immobilizer 
    lead above the clutch cable.
    C. Line up the left handlebar switch lead cou- pler and radiator fan motor lead coupler 
    behind the head pipe.
    D. Route the clutch cable over the wire har- ness.
    E. To the immobilizer
    F. To the main switch
    G. Place three couplers on the flange of the  cover.
    H. To the front wheel sensor. Place the  between frame and clutch cable on the 
    clutch cable fixing bracket.
    I. To the fuel pump
    J. Clamp four wire leads. There should be no  excessive slack on the wire leads.
    K. To the fuel tank
    L. Either installation position can be  accepted, but make sure that the leads are 
    not crossed. M. Clamp the rear turn signal lead and license 
    plate light lead to the frame. Hook the 
    clamp to the bracket. Pull out the lead suffi-
    ciently to the frame side and route it along 
    with the side of the back stay. Cut the tip of 
    the clamp to be between 1 and 5 mm (0.04 
    and 0.20 in) upward.
    N. Clamp the rear turn signal light lead and  license plate light lead to the frame. Cut the 
    tip of the clamp to be between 1 and 5 mm 
    (0.04 and 0.20 in).
    O. Gap between the lead and muffler should  be 10 mm (0.39 in) or more.
    P. Coupler should not run on the relay assem- bly.
    Q. To the tail/brake light
    R. To the license plate light
    S. To the rear turn signal light (right)
    T. To the rear turn signal light (left)
    U. To the engine
    V. Route the speed sensor lead behind the  starter motor lead
    W. Point the bend-R section of the throttle  cable (pull side) to the inner side horizon-
    tally. It is also possible to visually check the 
    bend-R section.
    X. Attach the ABS check coupler to the  bracket after inserting the connector.
    Y. To the headlight lead
    Z. Clamp the seat lock cable to the frame as  shown in the illustration. Secure the clamp 
    to the weld of the cross member with the 
    frame. Position the binding section in front 
    of the vehicle body and cut the tip to be 
    between 1 and 5 mm (0.04 and 0.20 in).
    AA.Point the tip of the clamp to the inner side  of the vehicle body. 
    						
    							
    CABLE ROUTING
    2-65
    FZ6-N/FZ6-NHG(W) 
    						
    All Yamaha manuals Comments (0)

    Related Manuals for Yamaha Fz6 N Service Manual