Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 51

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-33 Connect System Cables 
1
Recommended Cable Routing
1. Route the fib er optic  c ab le up  toward the top  of the c ab inet. The exc ess 
c ab le should  b e loop ed  and  d rap ed  from the B25A c able c lamp  on the 
top  g round  p late in the stac k. See Figure 1-18
.
2. Dress the c ab le b y tie wrap p ing  it to the outsid e of...

Page 52

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-34 Connect System Cables 
1
Standard Reliability Fiber Connections
Connec t and  route the fib er op tic  c able as shown in the c ab le running  list. See 
Fi g u re  1 - 1 9
 for a samp le c ab le routing.
Figure 1-19. Connections to Standard Reliability SystemsFigure Notes
1. Control Cab inet
2. Port Cab inet
3. Exp ansion Control...

Page 53

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-35 Connect System Cables 
1
High Reliability Fiber Connections
Connec t and  route the fib er op tic  c able as shown in the c ab le running  list. See 
Fi g u re  1 - 2 0
 for a samp le c ab le routing.
Figure 1-20. Connections to High Reliability SystemsFigure Notes
1. Control Cab inet
2. Duplic ate Control Cab inet
3. Port Cab inet...

Page 54

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-36 Connect System Cables 
1
Critical Reliability Fiber Connections
Connec t and  route the fib er op tic  c able as shown in the c ab le running  list. See 
Fi g u re  1 - 2 1
 for a samp le c ab le routing.
Figure 1-21. Connections to Critical Reliability SystemsFigure Notes
1. Control Cab inet
2. Duplic ate Control Cab inet
3. Port...

Page 55

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-37 Install Earthquake Protection 
1
Install Earthquake Protection
Earthq uake p rotec tion only installs on Sing le-Carrier Cab inets. 
Figure 1-22. Front Mounting Angle Location
1. Position the Control Cab inet (J58890L) in the p osition it is to oc c up y when 
the installation is c omp lete. Be sure the c ab inet is level.
2. Using...

Page 56

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-38 Install Earthquake Protection 
1
5. Sec ure the Front Mounting  Ang le to the floor using  the short hex head  
bolts provided.
6. Move the c ab inet b ac k into p lac e.
7. At the rear of the c ab inet, remove the two hole plug s from the b ottom of 
the c ab inet. See Fig ure 1-2 3
.
8. Insert a p enc il or marker throug h the...

Page 57

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-39 Install Earthquake Protection 
1
Figure 1-23. Cabinet Earthquake Mounting — Rear View
13. Lay the sup p lied  Stiffener on the bottom rear of the c ab inet and  alig n with 
the holes in the b ottom of the c ab inet. See Fig ure 1-2 3
.
14. Slid e a nylon washer onto eac h of the two sup p lied  long  hex head  b olts.
15. Insert...

Page 58

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install and Connect the Cabinets 
1-40 Install Earthquake Protection 
1 

Page 59

Install Telecommunications Cabling 
2-1 Equipment Room Hardware 
2
DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
2
Install Telecommunications Cabling
Equipment Room Hardware
SYSTIMAX 110-typ e hardware is used  for the Main Distrib ution Frame (MDF). 
110-typ e hard ware is availab le in two b asic  types: the 110A and  110P. The 110A 
req uires less wall sp ac e than the 110P. The 110P inc lud es horizontal and...

Page 60

DEFINITY Enterprise Communication Server Release 8.2
Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
April 2000
Install Telecommunications Cabling 
2-2 Equipment Room Hardware 
2
Figure 2-1. Example MDF ConnectionsFigure Notes
1. Rear of Port Cab inet
2. Main Distrib ution Frame (MDF)
3. Port Distribution Field  (Purp le Field )
4. Station Distribution Field  (White Field)
5. Trunk/Auxiliary Field
6. Purp le Field
7. Yellow Field
8. Green Field9. Satellite Closet
10. Auxiliary Cab...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual

All Lucent Technologies manuals