Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 41
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-23 Connect Time Division Multiplexing Bus Cables 1 Figure 1-11. Connections for Standard Reliability Systems Figure Notes 1. AHF110 TDM Bus Terminator (Slot 17) 2. TDM/Loc al Area Network (TDM/LAN) Pinfield (Slot 00) 3. TDM Bus Cab le WP-91716 L34. Port Cabinet (Stand ard Reliab ility) 5. Control Cab inet A Position 6. AHF110 TDM...
Page 42
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-24 Connect Time Division Multiplexing Bus Cables 1 Figure 1-12. Connections for High or Critical Reliability Systems Figure Notes 1. AHF110 TDM Bus Terminator (Slot 17) 2. TDM/Loc al Area Network (TDM/LAN) Pinfield (Slot 00) 3. TDM b us Cable (WP-91716 L3) 4. Port Cab inet 5. Control Cab inet A Position 6. AHF110 TDM Bus Terminator...
Page 43
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-25 Connect Time Division Multiplexing Bus Cables 1 Figure 1-13. Connections for High or Critical Reliability Systems Figure Notes 1. AHF110 TDM Bus Terminator (Slot 17) 2. TDM/Loc al Area Network (TDM/LAN) Pinfield (Slot 00) 3. TDM b us Cable (WP-91716 L3) 4. Port Cab inet 5. Control Cab inet A Position6. AHF110 TDM Bus Terminator...
Page 44
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-26 Verify Port Cabinet Address Plugs 1 Verify Port Cabinet Address Plugs The address plug is a jumper field on port cabinets only. The address plug is loc ated on the far rig ht hand side of the bac kp lane, to the rig ht of slot 00. A g roup of six p ins is lab eled for the c ab inet (c arrier) jump er c onnec tions. Verify the...
Page 45
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-27 Install Rear Panels 1 Install Rear Panels Figure 1-15. Rear Panel Screw Locations 1. Install the rear p anels and loosely thread eac h sc rew. See Fig ure 1-15 . 2. For unstacked c ab inets, tig hten the sc rews sec urely. Fo r a stack of cab inets, allow the screws lab eled Callout 4 to remain loose. These sc rews are tig...
Page 46
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-28 Install Ground Plates 1 Install Ground Plates Ground p lates are installed b etween stac ked c ab inets, p rovid e the ground c onnec tion between c ab inets, p rovid e rad io freq uenc y (RF) rad iation protec tion, and help stab ilize the c ab inets. Install Rear Ground Plates (Systems with Earthquake Protection) 1. Loosen...
Page 47
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-29 Install Ground Plates 1 Figure 1-16. Rear Ground Plate and Front Plate or Cabinet Clip — Side View Figure Notes 1. Front Ground Plate or Cabinet Clip 2. Battery3. Rear Ground Plate 3 2 1 grdpltec LJK 031096
Page 48
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-30 Install Ground Plates 1 Install Cabinet Clips (Systems without Earthquake Protection) A c ab inet c lip is required b etween eac h p air of stac ked c ab inets. At the front of the c ab inets, install a c ab inet c lip b etween eac h p air of c ab inets b y hooking the c lip into the slot of the up p er c ab inet and snap p...
Page 49
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-31 Connect System Cables 1 Connect System Cables Inter-Cabinet Cables (High or Critical Reliability) 1. Connec t the c ab les for c ritic al reliab ility Exp ansion Port Networks (EPNs) as shown in Figure 1-12 and in Tab le 1-1 below. 2. Connec t the c ab les for hig h or c ritic al reliab ility Proc essor Port Networks (PPNs) as...
Page 50
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-32 Connect System Cables 1 Fiber Optic Cable Connections The Customer Servic e Doc ument (CSD) p rovides an “ Inter-Cabinet Cab le Running List.” Eac h row on the list rep resents a c ab le c onnec tion. Use the running list to d etermine where to c onnec t eac h fib er op tic c ab le. Multi-Mode Fiber Optic Connections The...