Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-15 Install Sneak Fuse Panels 2 Tab le 2-2 is a p inout of the c ab le wiring and assoc iated fuse numb ers. 6. Sec ure the top of eac h B25A c ab le with the c ap tive sc rew on the c onnec tor. 7. Sec ure the b ottom of eac h c ab le with a sup p lied c ab le tie wrap. Table 2-2. Sneak Fuse Connector Pinout Connector Pin NumbersPair/Fuse Number 26/1...
Page 72
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-16 Cable Installation 2 Cable Installation Labels The purple p ort lab el shown in Fig ure 2-8 is installed on both end s of the 25-pair c ab les c onnec ting to the trunk/auxiliary field and /or d istrib ution field. The top b lue/yellow b uild ing and floor labels are for c ab les c onnec ting from the eq uip ment room to a site/satellite loc ation on...
Page 73
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-17 Cable Installation 2 Tab le 2-3 d etails the lab el name and rang e of eac h lab el. Fi g u re 2 - 9 shows the p roper way to install a lab el on a 25-p air c ab le c onnec tor. Install the lab el near the rear of the c onnec tor so it is not ob sc ured b y the c ab inet c onnec tor retainers. It c an also b e installed on the skin of the c ab le near...
Page 74
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-18 Cable Installation 2 Cable Routing Guidelines General The following guid elines should b e used when installing the eq uipment room c ab ling. Following these guid elines will maximize use of the c ab le slac k manag ers and make future c abling ad d itions and c hang es easier. Fi g u re 2 - 1 0 and Fig ure 2-11 show typ ic al c ab le routing...
Page 75
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-19 Cable Installation 2 Figure 2-11. Cable Routing to Bottom Terminal Blocks Route Cables to Main Distribution Frame The following guid elines should b e followed when routing c ab les from the c ab inet to the MDF. nEac h p ort c ab le is c onnec ted at the c ab inet and then routed along the front troug h of the c ab le slac k manag er to the c onnec...
Page 76
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-20 Cable Installation 2 nRoute the c ab le from the c ab inet to the wall. Plac e the c ab le b eside 1 of the rows of columns in the cable slack manager. NOTE: Retainers mounted on the c olumns keep the c ab le from p rotrud ing above the top of the base of the cable slack manager. nDetermine the leng th of the c ab le req uired to reac h from the c ab...
Page 77
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-21 Cable Installation 2 Connect Control Carrier Outputs Cable Plug the c onnec tor c ab le in the AUX c onnec tor on the rear of the Control Carrier. Route the c onnec tor c ab le throug h the c ab le slac k manag er to the assig ned 110-typ e terminal b loc k in the yellow field of the trunk/auxiliary field. Install Trunk Cables Among Network Interface,...
Page 78
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-22 Cable Installation 2 Figure 2-12. Connect Trunk Pairs Using Concentrator Cables Figure Notes: 1. Trunk/Auxiliary Field 2. To Control Carrier AUX Connec tor 3. Conc entrator Cable (WP90929, List 1) 4. Conc entrator Cable (WP90929, List 3) 5. A25D (Male-to-Male) Cab le 6. Alternate Bloc k/Rows7. RJ21X/RJ2GX Network Interface 8. Sneak Fuse Panel 9. B25A Cable...
Page 79
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-23 Cable Installation 2 Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity Figure 2-13 on p ag e 2-23 and Fig ure 2-14 on p age 2-24 show trunk p airs c onnec ted to the c ab inet with jump er wires to estab lish 3-p air mod ularity. Figure 2-13. 3-Pair Modularity for Trunk Pairs for 1-Pair Trunks To c onnec t the trunk p airs to...
Page 80
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-24 Cable Installation 2 Figure 2-14. 3-Pair Modularity for Trunk Pairs for 3-Pair Tie Trunks Install Cables Between Cabinet and MDF 1.Install “ D” ring s on the wall b etween the c ab le slac k manag er and the terminal/c onnec ting b loc ks mounted on the MDF. 2. Install a self-adhesive p ort lab el on the b ac k of eac h c onnec tor on the c onnec tor c...