Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-5 Installation Requirements 2 Installation Requirements Sneak Fuse Panels and Emergency Transfer Units Ap p roximately 8 in. (20 c m) of horizontal wall sp ac e is req uired for eac h c olumn of sneak fuse p anels. Up to 25 c onnec tor p airs c an b e p rotec ted b y eac h p anel. Horizontal wall sp ac e must also be p rovided for emerg enc y transfer...
Page 62
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-6 Install Equipment and Cables 2 Install Equipment and Cables Hardware Installation The following proc ed ures assume 1 system tec hnic ian is p erforming the installation. Proc edures are p rovid ed for installing the following : nMain Distrib ution Frame (MDF) nCab le Slac k Manag ers nSneak Fuse Panels nLab els for the Main Distrib ution Frame Install...
Page 63
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-7 Install Equipment and Cables 2 Figure 2-3. 110A-Type Terminal Blocks (300-Pair) Figure Notes 1. 4 ft (1.22 m) 2. 6.6 ft (2 m) 3. 7.68 in. (19.5 c m) 4. 7/8-in. (2.22 c m) 5. 5.31 in. (13.5 c m)6. 47.5 in. (120.6 c m) 7. Horizontal Line 8 . AC Po w e r St r ip 9. Floor Line r758420b MMR 031496
Page 64
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-8 Install Equipment and Cables 2 Wall Mounting 110P-Type Terminal Blocks The first terminal b loc k of the trunk/auxiliary field is alig ned with the left sid e of the system c ab inet. See Fig ure 2-4 . This arrang ement allows for g rowth on the rig ht sid e of the MDF. Figure 2-4. 110P-Type Terminal Blocks (900-Pair) Figure Notes 1. 4 ft (1.22 m) 2....
Page 65
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-9 Install Equipment and Cables 2 1. If you are installing 300-p air terminal bloc ks, d raw a level horizontal line on the wall 47.5 in. (1.2 m) ab ove the floor. See Fi g u re 2 - 3 . If you are installing 900-p air terminal bloc ks, d raw a level horizontal line on the wall 23 in. (58.4 c m) ab ove the floor. See Fig ure 2-4 . 2. To mount the first...
Page 66
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-10 Install Equipment and Cables 2 Frame Mounting 110P-Type Terminal Blocks The 900-pair 110P-typ e terminal b loc ks and the assoc iated p atc h c ord troug hs c an also b e mounted on a free-stand ing , floor-mounted 1110A2 App aratus Mounting Frame. See Fi g u re 2 - 5 . Figure 2-5. 1110A2 and 1110C1 Apparatus Mountings Figure Notes: 1. 1110C1 Ap p...
Page 67
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-11 Install Cable Slack Managers 2 Eac h 1110A2 p rovid es the sp ac e to mount 5 terminal b loc ks/p atc h c ord troug hs on eac h sid e of the frame. A c able sup p ort struc ture, ap p aratus mounting 1110C1, mounts d irec tly on top of the 1110A2 and p rovid es sup p ort for all c ab les routed to and from the frame. Install Cable Slack Managers 1....
Page 68
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-12 Off-Premises Circuit Protection 2 Figure 2-6. Cable Routing Through Cable Slack Manager Cab le c lamp s are req uired in installations with c ab le slac k managers. At the rear of the c ab inets, install 2 c ab le c lamp s using the sc rews p rovided . These c lamp s hold the 25-p air input/outp ut or MDF c ab les in p lac e. Fig ure 2-6 shows cab le...
Page 69
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-13 Install Sneak Fuse Panels 2 nAnalog voic e terminals use one of the following typ es of c omb ined over-voltag e and sneak c urrent p rotec tion, or eq uivalent: — Carb on b loc k with heat c oil for UL c od e 4B1C — Gas tub e with heat c oil for UL c od e 4B1E-W — Solid state with heat c oil for UL c ode 4C1S nDCP and ISDN-BRI terminals use the solid...
Page 70
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-14 Install Sneak Fuse Panels 2 Figure 2-7. Model 507B Sneak Fuse Panel 1. Loc ate the 507B near the network interfac e or the MDF. 2. Hold the p anel ag ainst the mounting surfac e and mark the mounting sc rew loc ations. Drill p ilot holes at the marked loc ations and partially install a loc ally ob tained #12 x 3/4-in. sc rew into the 2 b ottom...