Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 61

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-5 Installation Requirements 
2
Installation Requirements
Sneak Fuse Panels and Emergency Transfer Units
Ap p roximately 8 in. (20 c m) of horizontal wall sp ac e is req uired  for eac h c olumn 
of sneak fuse p anels. Up  to 25 c onnec tor p airs c an b e p rotec ted  b y eac h p anel. 
Horizontal wall sp ac e must also be p rovided  for emerg enc y transfer...

Page 62

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-6 Install Equipment and Cables 
2
Install Equipment and Cables
Hardware Installation
The following proc ed ures assume 1 system tec hnic ian is p erforming  the 
installation. Proc edures are p rovid ed  for installing  the following :
nMain Distrib ution Frame (MDF)
nCab le Slac k Manag ers
nSneak Fuse Panels
nLab els for the Main Distrib ution Frame
Install...

Page 63

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-7 Install Equipment and Cables 
2
Figure 2-3. 110A-Type Terminal Blocks (300-Pair) Figure Notes
1. 4 ft (1.22 m)
2. 6.6 ft (2 m)
3. 7.68 in. (19.5 c m)
4. 7/8-in. (2.22 c m)
5. 5.31 in. (13.5 c m)6. 47.5 in. (120.6 c m)
7. Horizontal Line
8 . AC  Po w e r  St r ip
9. Floor Line
r758420b MMR 031496 

Page 64

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-8 Install Equipment and Cables 
2
Wall Mounting 110P-Type Terminal Blocks
The first terminal b loc k of the trunk/auxiliary field  is alig ned  with the left sid e of 
the system c ab inet. See Fig ure 2-4
. This arrang ement allows for g rowth on the 
rig ht sid e of the MDF.
Figure 2-4. 110P-Type Terminal Blocks (900-Pair) Figure Notes
1. 4 ft (1.22 m)
2....

Page 65

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-9 Install Equipment and Cables 
2
1. If you are installing  300-p air terminal bloc ks, d raw a level horizontal line on 
the wall 47.5 in. (1.2 m) ab ove the floor. See Fi g u re  2 - 3
.
If you are installing  900-p air terminal bloc ks, d raw a level horizontal line on 
the wall 23 in. (58.4 c m) ab ove the floor. See Fig ure  2-4
.
2. To mount the first...

Page 66

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-10 Install Equipment and Cables 
2
Frame Mounting 110P-Type Terminal Blocks
The 900-pair 110P-typ e terminal b loc ks and  the assoc iated  p atc h c ord  troug hs 
c an also b e mounted  on a free-stand ing , floor-mounted  1110A2 App aratus 
Mounting  Frame. See Fi g u re  2 - 5
.
Figure 2-5. 1110A2 and 1110C1 Apparatus Mountings Figure Notes:
1. 1110C1 Ap p...

Page 67

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-11 Install Cable Slack Managers 
2
Eac h 1110A2 p rovid es the sp ac e to mount 5 terminal b loc ks/p atc h c ord  troug hs 
on eac h sid e of the frame. A c able sup p ort struc ture, ap p aratus mounting  
1110C1, mounts d irec tly on top  of the 1110A2 and  p rovid es sup p ort for all 
c ab les routed  to and  from the frame.
Install Cable Slack Managers
1....

Page 68

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-12 Off-Premises Circuit Protection 
2
Figure 2-6. Cable Routing Through Cable Slack Manager
Cab le c lamp s are req uired  in installations with c ab le slac k managers. At the rear 
of the c ab inets, install 2 c ab le c lamp s using  the sc rews p rovided . These c lamp s 
hold  the 25-p air input/outp ut or MDF c ab les in p lac e. Fig ure  2-6
 shows cab le...

Page 69

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-13 Install Sneak Fuse Panels 
2
nAnalog  voic e terminals use one of the following  typ es of c omb ined  
over-voltag e and  sneak c urrent p rotec tion, or eq uivalent:
— Carb on b loc k with heat c oil for UL c od e 4B1C
— Gas tub e with heat c oil for UL c od e 4B1E-W
— Solid  state with heat c oil for UL c ode 4C1S
nDCP and  ISDN-BRI terminals use the solid...

Page 70

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-14 Install Sneak Fuse Panels 
2
Figure 2-7. Model 507B Sneak Fuse Panel
1. Loc ate the 507B near the network interfac e or the MDF.
2. Hold  the p anel ag ainst the mounting  surfac e and  mark the mounting  
sc rew loc ations. Drill p ilot holes at the marked  loc ations and partially 
install a loc ally ob tained  #12 x 3/4-in. sc rew into the 2 b ottom...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

All Lucent Technologies manuals