Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 31
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-11 Connect AC Power and Ground 1 Figure 1-2. Typical Cabinet Grounding Wiring Diagram Figure Notes 1. PPN Cab inet 2. EPN Cab inet (if Installed ) 3. 6 AWG (#40) (16 mm 2) CABINET GROUND Wire 4. Sing le-Point Ground Bloc k5. 6 AWG (#40) (16 mm 2) Ground Wire 6. AC Load Center Sing le-Point Ground 7. Over 50 ft (15.2 m) 8. Cab inet Ground Terminal Bloc k 6 122 333 5...
Page 32
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-12 Connect AC Power and Ground 1 Connect Battery Leads (J58890CH-1) Fi g u re 1 - 3 shows a typ ic al op tional small b attery hold over assemb ly. These assemb lies may ship with the b attery lead s d isc onnec ted to p revent the b atteries from discharging. 1. Plug the b attery c onnec tor into the -48 VDC Batteries c onnec tor on the rear of the J58890CH-1...
Page 33
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-13 Connect AC Power and Ground 1 Figure 1-4. Power Distribution Unit (J58890CH) 2. Be sure the main p ower to the p ower d istrib ution unit is OFF. 3. At the power d istribution unit, set all c arrier c irc uit b reakers OFF. Small Battery Holdover 1. Connec t the small b attery hold over c ab le to J20. See Fi g u re 1 -4. Figure Notes 1. Connec t small battery...
Page 34
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-14 Connect AC Power and Ground 1 Large Battery Holdover When using larg e b attery hold over, 1 b attery c ab inet is req uired for every system c ab inet req uiring hold over. The 24-c ell b attery c ab inet must have a float voltag e of 54.2 VDC. 1. Connec t the -48 VDC c able to the larg e b attery c onnec tor. See Fi g u re 1 -4 . 2. Connec t the -48 VDC...
Page 35
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-15 Connect AC Power and Ground 1 Figure 1-5. Shorting Cable Installation 1. Set the c irc uit breakers on the p ower d istrib ution unit OFF. See Fi g u re 1 -5 . 2. At the rear of the c ab inet, insert the shorting c ab le (H600-442-G1) into J11. The c ab le is keyed so it c an fit only 1 way. Connect AC Power 1. Set the main c irc uit b reakers on the p ower d...
Page 36
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-16 Connect DC Power and Ground 1 Connect DC Power and Ground Power Distribution Unit (J58890CH-1 Only) Rectifier Modules and Battery Interface Unit Eac h rec tifier mod ule op erates as an integ ral p art of a c omp lete p ower system with b attery b ac kup . The mod ules op erate in a red und ant, hig h reliab ility mod e to p rovid e -48 VDC at 850 Watts to a c...
Page 37
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-17 Connect DC Power and Ground 1 1. Install the BU3200A Battery Interfac e Unit (c omc ode 107781502) in the first slot of the p ower d istrib ution unit. See Fig ure 1-6 . NOTE: The BIU and the rec tifier mod ules are keyed and c an only install 1 way. 2. Install the first 2 RM0850HA100 Rec tifier Modules (c omc od e 107793796) into the sec ond and third...
Page 38
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-18 Connect DC Power and Ground 1 DC Power and Ground (J58890CF Only) Fi g u re 1 - 7 shows a typ ic al p ower and g round layout for a DC-powered c ab inet. The size of the wire required for the -48 volt DC and -48 volt return must ensure the voltage sup p lied b y the b attery plant is maintained b etween -42.5 and -54.2 volts DC at all times for p roper...
Page 39
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-19 Connect DC Power and Ground 1 Connect DC Power and Ground The g round ing method s for the DC-p owered system are more c omp lex than that of an AC-powered system. The following installation p roc ed ures refer to Fig ure 1-7. The numbers 1-8 in Fi g u re 1 -7 matc h the following sub sec tions 1-8. Other fig ures may b e referenc ed as req uired ....
Page 40
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-20 Connect DC Power and Ground 1 3. At the DC Power Cab inet, c onnec t the wire to the Ground Disc harg e Bar. 4. Route the wire throug h 1 of the holes in the sid e of the c ab inets and terminate it on the Ground Connec tion Terminal in the DC Battery Cabinet. 3. DC Power Cabinet Approved Ground NOTE: The wire must b e at least as larg e as the larg est d...