Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 21

Install and Connect Cabinets 
1-1 Unpack and Inspect Cabinets 
1
DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
1
Install and Connect Cabinets
This c hapter d isc usses installation of Multic arrier Cab inets only. For information 
on Sing le-Carrier Cab inets, refer to DEFINITY Enterp rise Communic ations Server 
Release 8 Installation and  Test for Sing le-Carrier Cab inets.
Floor p lans and  eq uip ment layouts for typic al system...

Page 22

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-2 Check Customer’s Order 
1
Unpack and Inspect Auxiliary Cabinet
The Auxiliary c ab inet is normally p ositioned  ad jac ent to the PPN c ab inet or the 
EPN c ab inet, if p rovid ed. 
1. Unp ac k the c ab inets as outlined on the p revious p ag e.
2. Remove the lower rear p anel from the Auxiliary c ab inet. Install the lower 
rear panel when the installation is c...

Page 23

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-3 Install System Cabinets 
1
Install System Cabinets
Chec k the loc ation of the AC p ower rec eptac les in the eq uip ment room. The 
rec ep tac les must b e on a separately fused  circuit not controlled b y a wall switch. 
They must b e loc ated  within 10 ft (3 m) of the c ab inet and  outsid e the Main 
Distrib ution Frame (MDF) area.
Position the PPN Cabinet
1....

Page 24

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-4 Install System Cabinets 
1
Position the Auxiliary Cabinet (Optional)
1. Position the Auxiliary c ab inet next to the PPN c abinet (or EPN c ab inet, if 
installed ). The loc ation of eq uip ment inside the Auxiliary c ab inet is 
sp ec ified  in the Customer Servic e Doc ument (CSD).
2. If earthquake p rotec tion is req uired , skip  to ‘‘
Earthq uake Protec tion...

Page 25

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-5 Install System Cabinets 
1
The BLD1 c irc uit p ac k p rovid es 8 c hannels with up  to 20 sec ond s of 
rec ord ing  time on eac h c hannel. The BLD2 c irc uit p ac k provid es 8 
c hannels with up  to 40 sec ond s of rec ording  time on eac h c hannel. Eac h 
c hassis c an b e p op ulated  with any c omb ination of 2 BLD c irc uit p ac ks.
The Model 15A Announc...

Page 26

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-6 Connect AC Power and Ground 
1
Connect AC Power and Ground
Power Requirements
Tab le 1-2 shows the p ower req uirements. 
J58890CE-1, J58890CE-2, and J58890CH-1
The following proc ed ures app ly to the AC-powered  PPN and  EPN c ab inets. 
Either of the following  p ower sourc es c an supp ly 60 Hz p ower to the AC load  in 
Release 5 and later systems: 
nSing le-p...

Page 27

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-7 Connect AC Power and Ground 
1
Tab le 1-3 describes the power sources and required AC input power.
NOTE:
The typ e of p ower req uired  is shown on the c ab inet’s rear d oor.
!CAUTION:
The eq uip ment room AC power and ground  wiring  must b e p erformed  b y a 
q ualified  elec tric ian. Refer to DEFINITY Enterp rise Communic ations Server 
Release 8 System Desc...

Page 28

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-8 Connect AC Power and Ground 
1
Connect Ground to AC-Powered System
(J58890CE)
Ground ing  is relatively simp le for an AC-p owered  system. Basic ally, the c ab inets 
c onnec t to the sing le-p oint g round  terminal bloc k loc ated  at either the AC load  
c enter or to a separate sing le-point g round  b loc k wired  to the AC load  c enter (or 
op tional AC p...

Page 29

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-9 Connect AC Power and Ground 
1
Figure 1-1. Typical Cabinet Ground Location
5. Rep eat c onnec ting  eac h EPN c ab inet to the sing le-p oint g round bloc k.
6. At the AC load c enter, c onnec t a 10 AWG (#25) (6 mm
2) wire to the 
sing le-p oint g round  b loc k. This g round  wire will later b e tie-wrap p ed  to the 
trunk c ab les and  c onnec ted  to the...

Page 30

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-10 Connect AC Power and Ground 
1
AC Load Center is More Than 50 ft (15.2 m) from 
Cabinet
1. Mount the sing le-p oint ground b loc k to any surfac e b etween the MCC 
c ab inets and  the AC load  c enter sing le-p oint g round . The sing le-p oint 
g round  b loc k must b e mounted  to a non-metallic  surfac e.
2. At the bottom rear of the PPN c ab inet, c onnec t a...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

All Lucent Technologies manuals