Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 51

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-31 Fiber Optic Interconnect Cabling 
1
Figure 1-13. High-Reliability CSS-Connected with 1 Switch Node
Critical Reliability
Fi g u re  1 - 1 4 shows typ ic al fiber op tic  c abling  b etween c ab inets. The c ab le 
b etween p ort slots 1 and 2 on eac h switc h nod e is a metallic  c ab le (H600-278). 
1. Connec t the 2 g roup s of 1 to 15 c ab les b etween the PPN...

Page 52

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-32 Fiber Optic Interconnect Cabling 
1
Figure 1-14. Critical-Reliability CSS-Connected with 1 Switch Node
2. Both c onnec tions from eac h EPN must go to the same slot numb er. For 
examp le: EPN c ab inet 2, 2A1 to 1E3 and  c ab inet 2, 2B2 to 1D3. Figure Notes
1. Cabinet 1 (PPN with 1 Dup lex Switc h 
Node)
2. Cabinet 2 throug h 16 (EPN)3. H600-278 Metallic  Cab le...

Page 53

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-33 Earthquake Protection Installation 
1
Earthquake Protection Installation
Install Concrete Floor Mounting 
1. Position the c ab inet in the exac t p osition it is to oc c up y when the 
installation is complete.
2. Insert a p enc il or marker throug h the holes p reviously oc c up ied by the 
c arriag e b olts (front and  rear) in the b ottom of the c ab inet and...

Page 54

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-34 Earthquake Protection Installation 
1
5. Remove the raised  floor p anels in whic h the holes were d rilled.
6. Using  1/2-in. (1.3 c m) anc hor b its, d rill a hole at eac h of the loc ations 
marked  in Step 4. Stop drilling  when the mark on the sid e of the b it 
reac hes the floor level.
7. Insert a c onc rete floor anc hor (STARR part number 3425) into the...

Page 55

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-35 Earthquake Protection Installation 
1
8. A 3/8-16 thread ed  rod  (p art numb er 845557073) is used  to sec ure the 
c ab inet to eac h c onc rete floor anc hor. See Figure 1-15
.
Measure the d istanc e from 1 of the anc hors to the b ottom of the c ab inet. 
Ad d  1/2-in. (1.3 c m) to this measurement to allow the rod  to b e thread ed  
into the floor anc hor. Ad...

Page 56

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-36 Earthquake Protection Installation 
1 

Page 57

Install Telecommunications Cabling 
2-1 Equipment Room Hardware 
2
DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
2
Install Telecommunications Cabling 
Equipment Room Hardware
SYSTIMAX 110-typ e hardware is used  for the Main Distrib ution Frame (MDF). 
110-typ e hard ware is availab le in 2 basic  typ es: the 110A and 110P. The 110A 
req uires less wall sp ac e than the 110P. The 110P inc lud es horizontal and  vertic al 
c ab le troug hs for...

Page 58

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-2 Equipment Room Hardware 
2
Figure 2-1. Example MDF Connections
widfccf2 EWS 102798
4
1101941322 21120
51423 3122161524918
71625817
Port Tie Trunk Port MET Line
4
4 Port Tie Trunk
w/ E&M Signaling
Port Data Line 8
Port Digital 8
Port BRI 12Port Hybrid 8Port DID 8
Port Analog
Port CO 8
8
110 19
413
22 21120
5
1423 3
12 21 615
24 918
716 25 8
17
Port Digital...

Page 59

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-3 Equipment Room Hardware 
2
Cross-Connect Fields
Eac h MDF c ontains a trunk/auxiliary field  and  a d istribution field . The 
trunk/auxiliary field c ontains 3 c ross-c onnec t areas:
1. The green field terminates the network interface leads from the Central 
Offic e (CO) and  p rovid es the terminals to c ross-c onnec t the leads to the 
p urp le or yellow...

Page 60

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install Telecommunications Cabling 
2-4 Main Distribution Frame 
2
Main Distribution Frame
The MDF is loc ated  d irec tly b ehind  the system c abinet. Fi g u re  2 - 2 shows a 
typic al installation using 900-p air 110P-typ e terminal b loc ks.
Figure 2-2. Typical 110A-Type Terminal BlocksFigure Notes
1. Multicarrier Cab inet
2. Z113A Cab le Slac k Manag er
3. 25-Pair Cab le to System Cab inet
4....
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

All Lucent Technologies manuals