Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 51
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-31 Fiber Optic Interconnect Cabling 1 Figure 1-13. High-Reliability CSS-Connected with 1 Switch Node Critical Reliability Fi g u re 1 - 1 4 shows typ ic al fiber op tic c abling b etween c ab inets. The c ab le b etween p ort slots 1 and 2 on eac h switc h nod e is a metallic c ab le (H600-278). 1. Connec t the 2 g roup s of 1 to 15 c ab les b etween the PPN...
Page 52
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-32 Fiber Optic Interconnect Cabling 1 Figure 1-14. Critical-Reliability CSS-Connected with 1 Switch Node 2. Both c onnec tions from eac h EPN must go to the same slot numb er. For examp le: EPN c ab inet 2, 2A1 to 1E3 and c ab inet 2, 2B2 to 1D3. Figure Notes 1. Cabinet 1 (PPN with 1 Dup lex Switc h Node) 2. Cabinet 2 throug h 16 (EPN)3. H600-278 Metallic Cab le...
Page 53
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-33 Earthquake Protection Installation 1 Earthquake Protection Installation Install Concrete Floor Mounting 1. Position the c ab inet in the exac t p osition it is to oc c up y when the installation is complete. 2. Insert a p enc il or marker throug h the holes p reviously oc c up ied by the c arriag e b olts (front and rear) in the b ottom of the c ab inet and...
Page 54
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-34 Earthquake Protection Installation 1 5. Remove the raised floor p anels in whic h the holes were d rilled. 6. Using 1/2-in. (1.3 c m) anc hor b its, d rill a hole at eac h of the loc ations marked in Step 4. Stop drilling when the mark on the sid e of the b it reac hes the floor level. 7. Insert a c onc rete floor anc hor (STARR part number 3425) into the...
Page 55
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-35 Earthquake Protection Installation 1 8. A 3/8-16 thread ed rod (p art numb er 845557073) is used to sec ure the c ab inet to eac h c onc rete floor anc hor. See Figure 1-15 . Measure the d istanc e from 1 of the anc hors to the b ottom of the c ab inet. Ad d 1/2-in. (1.3 c m) to this measurement to allow the rod to b e thread ed into the floor anc hor. Ad...
Page 56
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-36 Earthquake Protection Installation 1
Page 57
Install Telecommunications Cabling 2-1 Equipment Room Hardware 2 DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 2 Install Telecommunications Cabling Equipment Room Hardware SYSTIMAX 110-typ e hardware is used for the Main Distrib ution Frame (MDF). 110-typ e hard ware is availab le in 2 basic typ es: the 110A and 110P. The 110A req uires less wall sp ac e than the 110P. The 110P inc lud es horizontal and vertic al c ab le troug hs for...
Page 58
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-2 Equipment Room Hardware 2 Figure 2-1. Example MDF Connections widfccf2 EWS 102798 4 1101941322 21120 51423 3122161524918 71625817 Port Tie Trunk Port MET Line 4 4 Port Tie Trunk w/ E&M Signaling Port Data Line 8 Port Digital 8 Port BRI 12Port Hybrid 8Port DID 8 Port Analog Port CO 8 8 110 19 413 22 21120 5 1423 3 12 21 615 24 918 716 25 8 17 Port Digital...
Page 59
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-3 Equipment Room Hardware 2 Cross-Connect Fields Eac h MDF c ontains a trunk/auxiliary field and a d istribution field . The trunk/auxiliary field c ontains 3 c ross-c onnec t areas: 1. The green field terminates the network interface leads from the Central Offic e (CO) and p rovid es the terminals to c ross-c onnec t the leads to the p urp le or yellow...
Page 60
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install Telecommunications Cabling 2-4 Main Distribution Frame 2 Main Distribution Frame The MDF is loc ated d irec tly b ehind the system c abinet. Fi g u re 2 - 2 shows a typic al installation using 900-p air 110P-typ e terminal b loc ks. Figure 2-2. Typical 110A-Type Terminal BlocksFigure Notes 1. Multicarrier Cab inet 2. Z113A Cab le Slac k Manag er 3. 25-Pair Cab le to System Cab inet 4....