Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 41
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-21 Connect DC Power and Ground 1 6. Turn Circuit Breakers Off The main c irc uit b reaker on a DC-p owered PPN/EPN c ab inet is loc ated on the front of the p ower d istribution unit. The c irc uit b reakers on the rear of the power d istrib ution unit c ontrol the ind ivid ual c arriers. See Fi g u re 1 - 4 for the loc ation of the c arrier b reakers. 1. Set...
Page 42
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-22 Approved Grounds 1 Mixed AC/DC Power and Ground Fi g u re 1 - 8 shows a p ower and g round layout for a mixed AC/DC-p owered c ab inet c onfig uration in the same eq uip ment room with the PPN b eing DC powered and the EPN being AC powered. If a second EPN is part of the system, use the same b asic c onnec tions shown in Fig ure 1-8 . Figure 1-8. Typical...
Page 43
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-23 Approved Grounds 1 Acceptable Water Pipe — A metal und erg round water p ip e, at least 1/2-in. (1.3 c m) in d iameter, in d irec t c ontac t with the earth for at least 10 ft (3 m). The p ip e must b e elec tric ally c ontinuous (or mad e elec tric ally c ontinuous b y b onding around insulated joints, p lastic pip e, or plastic water meters) to the p...
Page 44
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-24 Connect Remote Power Off Cable and External Alarm Cable 1 Connect Remote Power Off Cable and External Alarm Cable Fi g u re 1 - 9 shows the loc ation of the Remote Power Off (RPO) c ab le. The op p osite end of the c ab le c onnec ts to the Emerg enc y Power Off (EPO) switc h loc ated outside of the eq uipment room. Figure 1-9. Remote Power Off Cable...
Page 45
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-25 Connect External Alarm Cable 1 !CAUTION: The auxiliary c ontac ts insid e the EPO switc h assemb ly must close when the switc h is p ressed. This c ontac t c losure energ izes the relay insid e the p ower d istrib ution unit, c ausing the c onnec tion to the b attery hold over assemb ly to op en. Fi g u re 1 - 1 0 shows the c ab ling from the auxiliary c...
Page 46
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-26 Connect AC Power to Stratum 3 Clock Cabinet 1 Connect AC Power to Stratum 3 Clock Cabinet The c loc k c ab inet requires a 120 VAC, 15 Amp rec ep tac le. The g reen wire g round p rovid ed b y the rec ep tac le is suffic ient. The c loc k c ab inet d oes not req uire a g round c onnec tion bac k to the sing le-p oint ground . Check Commercial Power and...
Page 47
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-27 Fiber Optic Duplication Interface Cabling (R8si only) 1 Connect Stratum 3 Clock DC Power 1. Set the c loc k c ab inet c irc uit b reaker at the DC p ower p lant OFF. 2. At the c loc k c ab inet, c onnec t a 6 AWG (#40) (16 mm 2) g round wire to the -48V terminal on the terminal strip. 3. At the c loc k c ab inet, c onnec t a 6 AWG (#40) (16 mm 2) wire to the...
Page 48
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-28 Fiber Optic Interconnect Cabling 1 Fiber Optic Interconnect Cabling Signals between the cabinets are carried by fiber optic cables. Lightwave transc eivers provid e the req uired fib er op tic interfac e. The fib er op tic c ables from the DEFINITY System route to a Lig htg uid e Interc onnec t Unit (LIU) or fib er op tic shelf. Refer to Appendix A, ‘‘...
Page 49
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-29 Fiber Optic Interconnect Cabling 1 For eac h fib er ind ic ated in the fib er op tic Cab le Running List: 1. Install a lig htwave transc eiver on the c ab inet c onnec tor at the p osition in the FROM c olumn in the running list. 2. Selec t a c able ind ic ated b y the CABLE CODE and LENGTH in the running list. Connec t 1 of the fibers to eac h c onnec tor...
Page 50
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-30 Fiber Optic Interconnect Cabling 1 Figure 1-12. Standard Reliability CSS-Connected Release 8r with 1 Switch Node High-Reliability Fi g u re 1 - 1 3 shows typ ic al fiber op tic c abling b etween c ab inets. The c ab le b etween the EI and SNI on the PPN c ab inet is a p re-installed metallic c ab le (H600-278). 1. Connec t the c ab les b etween the PPN c...