Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 41

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-21 Connect DC Power and Ground 
1
6. Turn Circuit Breakers Off
The main c irc uit b reaker on a DC-p owered  PPN/EPN c ab inet is loc ated  on the 
front of the p ower d istribution unit. The c irc uit b reakers on the rear of the power 
d istrib ution unit c ontrol the ind ivid ual c arriers. See Fi g u re  1 - 4
 for the loc ation of 
the c arrier b reakers.
1. Set...

Page 42

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-22 Approved Grounds 
1
Mixed AC/DC Power and Ground
Fi g u re  1 - 8 shows a p ower and  g round  layout for a mixed  AC/DC-p owered  
c ab inet c onfig uration in the same eq uip ment room with the PPN b eing  DC 
powered and the EPN being AC powered. If a second EPN is part of the system, 
use the same b asic  c onnec tions shown in Fig ure 1-8
.
Figure 1-8. Typical...

Page 43

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-23 Approved Grounds 
1
Acceptable Water Pipe
 — A metal und erg round  water p ip e, at least 1/2-in. (1.3 
c m) in d iameter, in d irec t c ontac t with the earth for at least 10 ft (3 m). The p ip e 
must b e elec tric ally c ontinuous (or mad e elec tric ally c ontinuous b y b onding  
around  insulated  joints, p lastic  pip e, or plastic  water meters) to the p...

Page 44

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-24 Connect Remote Power Off Cable and External Alarm Cable 
1
Connect Remote Power Off Cable and 
External Alarm Cable
Fi g u re  1 - 9 shows the loc ation of the Remote Power Off (RPO) c ab le. The 
op p osite end of the c ab le c onnec ts to the Emerg enc y Power Off (EPO) switc h 
loc ated  outside of the eq uipment room.
Figure 1-9. Remote Power Off Cable...

Page 45

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-25 Connect External Alarm Cable 
1
!CAUTION:
The auxiliary c ontac ts insid e the EPO switc h assemb ly must close when the 
switc h is p ressed. This c ontac t c losure energ izes the relay insid e the p ower 
d istrib ution unit, c ausing  the c onnec tion to the b attery hold over assemb ly to 
op en.
Fi g u re  1 - 1 0
 shows the c ab ling  from the auxiliary c...

Page 46

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-26 Connect AC Power to Stratum 3 Clock Cabinet 
1
Connect AC Power to Stratum 3 Clock 
Cabinet
The c loc k c ab inet requires a 120 VAC, 15 Amp rec ep tac le. The g reen wire 
g round  p rovid ed  b y the rec ep tac le is suffic ient. The c loc k c ab inet d oes not 
req uire a g round  c onnec tion bac k to the sing le-p oint ground .
Check Commercial Power and...

Page 47

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-27 Fiber Optic Duplication Interface Cabling (R8si only) 
1
Connect Stratum 3 Clock DC Power
1. Set the c loc k c ab inet c irc uit b reaker at the DC p ower p lant OFF.
2. At the c loc k c ab inet, c onnec t a 6 AWG (#40) (16 mm
2) g round  wire to the 
-48V terminal on the terminal strip.
3. At the c loc k c ab inet, c onnec t a 6 AWG (#40) (16 mm
2) wire to the...

Page 48

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-28 Fiber Optic Interconnect Cabling 
1
Fiber Optic Interconnect Cabling
Signals between the cabinets are carried by fiber optic cables. Lightwave 
transc eivers provid e the req uired  fib er op tic  interfac e. 
The fib er op tic  c ables from the DEFINITY System route to a Lig htg uid e 
Interc onnec t Unit (LIU) or fib er op tic  shelf. Refer to Appendix A, ‘‘...

Page 49

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-29 Fiber Optic Interconnect Cabling 
1
For eac h fib er ind ic ated  in the fib er op tic  Cab le Running  List:
1. Install a lig htwave transc eiver on the c ab inet c onnec tor at the p osition in 
the FROM c olumn in the running list.
2. Selec t a c able ind ic ated  b y the CABLE CODE and  LENGTH in the running  
list. Connec t 1 of the fibers to eac h c onnec tor...

Page 50

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Install and Connect Cabinets 
1-30 Fiber Optic Interconnect Cabling 
1
Figure 1-12. Standard Reliability CSS-Connected Release 8r with 1 Switch 
Node 
High-Reliability
Fi g u re  1 - 1 3 shows typ ic al fiber op tic  c abling  b etween c ab inets. The c ab le 
b etween the EI and  SNI on the PPN c ab inet is a p re-installed  metallic  c ab le 
(H600-278).
1. Connec t the c ab les b etween the PPN c...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

All Lucent Technologies manuals