Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

Here you can view all the pages of manual GE Logiq P5 Service Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.

Page 321

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 75
8-2-30 P3RLY / P2RLY Assy & P2RLY with Dummy 
8-2-30-1 Tools • Common pilIips screwdrivers
8-2-30-2 Preparations • Shut down the system and switch off the main breaker.
8-2-30-3 Removal procedure 1.) Remove the side right cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Remove the side left cover. Refer to the  8-2-15 Side Left Cover on page 8-51.
3.) Remove the Front Cover....

Page 322

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 76 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-30-3              Removal procedure  (cont’d)
7.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-30-4 Mounting Procedure Install the new parts in the reverse order of removal.
Table 8-31    Functional Tests
Service Manual
Section
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service Manual,...

Page 323

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 77
8-2-31 Backplane Assy 
8-2-31-1 Tools • Common pilIips screwdrivers
8-2-31-2 Preparations • Shut down the system and switch off the main breaker.
8-2-31-3 Removal procedure 1.) To detached the backplane, all pwas in the cardcage should be removed from cardcage.
2.) Open the Side Left Cover and Side Right Cover. Refer to the  8-2-15 Side Left Cover on page 8-
51  and  8-2-16 Side Right Cover...

Page 324

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 78 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-31-3              Removal procedure  (cont’d)
9.) Unscrew 16 screws from the Backplane Assy.
10.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
8-2-31-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-114   Backplane
Table 8-32    Functional Tests
Service Manual Section
Functional Test /...

Page 325

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 79
8-2-32 ACWD Assy 
8-2-32-1 Tools • Common pilIips screwdrivers
8-2-32-2 Preparations • Shut down the system and switch off the main breaker.
8-2-32-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
3.) Remove the ASIG Board. Refer to the 8-2-35 ASIG Assy on page...

Page 326

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 80 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-32-3              Removal procedure  (cont’d)
5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-32-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-33    Functional Tests
Service ManualSection
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service Manual,...

Page 327

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 81
8-2-33 SYSCON PM As sy/SYSCON CM Assy
8-2-33-1 Tools
• Common pilIips screwdrivers
8-2-33-2 Preparations • Shut down the system and switch off the main breaker.
8-2-33-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
3.) Remove the SYSCONPM(SYSCONCM) assy  in...

Page 328

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 82 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-33-3              Removal procedure  (cont’d)
5.) Mount ASIR ROM to new SYSCONML  Assy. Refer to the Figure 8-119.
6.) Confirm mounting direction and pin number.
NOTE: It is important to swap ASIR  ROM(U23). Because it contains the serial Number and option the 
system. Figure 8-118   Separation of ASIR ROM
Figure 8-119   ASIR ROM mounting direction 

Page 329

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 83
8-2-33-3              Removal procedure  (cont’d)
7.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
8-2-33-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-34    Functional Tests
Service ManualSection
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service Manual,...

Page 330

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 84 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-34 PM SOM Assy with  1G/ CM SOM Assy with 512M
8-2-34-1 Tools
• Common pilIips screwdrivers
8-2-34-2 Preparations • Shut down the system and switch off the main breaker.
8-2-34-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
3.) Remove the SYSCOM PM  / CM...
Start reading GE Logiq P5 Service Manual

Related Manuals for GE Logiq P5 Service Manual

All GE manuals