Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

Here you can view all the pages of manual GE Logiq P5 Service Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.

Page 311

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 65
8-2-24-3              Removal procedure  (cont’d)
3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
8-2-24-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-25    Functional Tests
Service ManualSection
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service Manual,...

Page 312

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 66 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-25 Dummy Cover L / R 
8-2-25-1 Tools • Common pilIips screwdrivers
8-2-25-2 Preparations • Shut down the system and switch off the main breaker.
8-2-25-3 Removal procedure 1.) Remove 2 rubber caps (1-2).
2.) Unscrew 2 screws and remove the dummy cover L.
3.) Same process is applied for dummy cover R. Figure 8-102   rubber cap of dummy cover
Figure 8-103   screws of dummy cover 

Page 313

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 67
8-2-25-3              Removal procedure  (cont’d)
4.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
8-2-25-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-26    Functional Tests
Service ManualSection
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service Manual,...

Page 314

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 68 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-26 EMI Cover L
8-2-26-1 Tools • Common pilIips screwdrivers
8-2-26-2 Preparations • Shut down the system and switch off the main breaker.
8-2-26-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 .
2.) Unscrew 6 screws (1-6).
3.) Perform the following functional tests. If all are successful, include the debrief script provided below....

Page 315

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 69
8-2-27 EMI Cover R
8-2-27-1 Tools • Common pilIips screwdrivers
8-2-27-2 Preparations • Shut down the system and switch off the main breaker.
8-2-27-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Unscrew 9 screws (1-9).
3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below....

Page 316

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 70 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-28 APS/APS Pro Assy
NOTE: APS Power Supply  can not be adjusted.
8-2-28-1 Tools • Common pilIips screwdrivers
• Nipper
8-2-28-2 Preparations • Shut down the system and switch off the main breaker.
8-2-28-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 .
2.) Remove the EMI Cover L. Refer to the  8-2-26 EMI Cover L on page 8-68.
3.)...

Page 317

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 71
8-2-28-3              Removal procedure  (cont’d)
7.) Unplug 3 connectors from the backplane and disconn ect the 3P AC connector near bottom of the 
backplane and disconnect the 2P connector near the nest cooling fan.
8.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
9.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
10.) Unplug the...

Page 318

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 72 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-28-3              Removal procedure  (cont’d)
11.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
8-2-28-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-29    Functional Tests
Service ManualSection
Functional Test / Diagnostic TestDebrief Script
Section 4-3-1 Power On/Boot Up
“Service...

Page 319

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 73
8-2-29 CL1TRX Assy / BL1TRX Assy
8-2-29-1 Tools • Common pilIips screwdrivers
8-2-29-2 Preparations • Shut down the system and switch off the main breaker.
8-2-29-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
3.) Unscrew 2 screws (1-2) and eject the PCB.
4.)...

Page 320

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
8 - 74 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-29-3              Removal procedure  (cont’d)
5.) Pull the CL1TRX Assy out.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-29-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-110   Eject the CL1TRX(BL1TRX) Board
Table 8-30    Functional Tests
Service Manual Section
Functional Test /...
Start reading GE Logiq P5 Service Manual

Related Manuals for GE Logiq P5 Service Manual

All GE manuals