Page 321

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-23
 
12.) The power supply can now be removed and set on the floor while the last power cable is accessed.
13.) Disconnect the motherboard power cable, as shown in Figure 8-17 on page 8-23 , by pushing down 
on the back of the locking key in the center of the connector and pulling the connector out.
The power supply is now removed from the BEP. Set it aside for...

Page 322

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-24 Section 8-4 - Back End Processor Power Supply Replacement
8-4-5 Installing the New BEP Power Supply
Ensure that the On/Off switch on the back of the new power supply is set to the ON position.
Ensure that the Voltage Select Switch is set to 220 Volts.
Refer to Figure 8-19 on page 8-24 . If the power supply is going into a BEP1.0 ensure that the +5 Volt 
standby plug is installed in the new supply...

Page 323

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-25
8-4-5 Installing the New BEP Power Supply (cont’d)
Reverse the removal procedure to install the new BEP Power Supply.
1.) Install the UPS Control Connector Panel to the back of the BEP (Figure 8-15 on page 8-22 ).
2.) Attach the motherboard power connector from the power supply to the motherboard (Figure 8-
17 on page 8-23 ). For BEP2.1, plug the purple +5Volt Standby...

Page 324

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-26 Section 8-5 - BEP HDD (Hard Disk Drive) Replacement Procedures
Section 8-5
BEP HDD (Hard Disk Drive) Replacement Procedures
8-5-1 Manpower
One person, 1 hour + travel
8-5-2 Tools
Phillips screwdriver
5.5 mm wrench or nut driver
8-5-3 Preparations (click here to view the cover removal video)
1.) Power Down/Shutdown the system as described in Section 4-3-2 on page 4-3.
2.) Remove the left side cover...

Page 325

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-27
8-5-4 BEP 1 HDD Replacement (2366650) (cont’d)
NOTE: This is a little more difficult if the BEP has the 3D Option installed with the 3D card extending 
over the HDD.
3.) Grab a hold of the HDD on each side and firmly pull towards you (Figure 8-22).
4.) The HDD tray will be released from the tabs holding it to the BEP chassis (Figure 8-23). Figure 8-21  Loosen HDD...

Page 326

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-28 Section 8-5 - BEP HDD (Hard Disk Drive) Replacement Procedures
8-5-4 BEP 1 HDD Replacement (2366650) (cont’d)
5.) Disconnect the Power and IDE Cables from the back of the HDD.
6.) Remove the four screws that attach the HDD to the tray.Figure 8-23  Lift Up HDD Assembly
Figure 8-24  HDD and Tray 

Page 327

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-29
8-5-4 BEP 1 HDD Replacement (2366650) (cont’d)
7.) Check the jumper on the back of the new HDD to ensure it is the same as the old one (Figure 8-25).
The only jumper on the back of the Hard Disk Drive (HDD) should be set to Cable Select (CS). Refer to 
the diagram on the HDD to ensure that the CS jumper is in place. CS will allow Master/Slave 
determination by the...

Page 328

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-30 Section 8-5 - BEP HDD (Hard Disk Drive) Replacement Procedures
8-5-5 BEP 2.X HDD Replacement (2348186-31) (cont’d)
4.) Remove the two 5.5 mm nuts that secure the HDD to the MOD/CD-RW tray (Figure 8-28).
5.) Slide the HDD assembly out towards you and slightly down.Figure 8-27  HDD Power and IDE Cables
Figure 8-28  HDD Assembly Hardware 

Page 329

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-31
8-5-5 BEP 2.X HDD Replacement (2348186-31) (cont’d)
6.) The BEP 2.x HDD should come with the mounting hardware attached. If the replacement HDD does 
not come with a mounting plate, transfer the mounting plate to the ne HDD.
7.) Check the jumper on the back of the new HDD to ensure it is the same as the old one (Figure 8-25).
8.) Slide the new HDD assembly on to the...

Page 330

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-32 Section 8-5 - BEP HDD (Hard Disk Drive) Replacement Procedures
8-5-5 BEP 2.X HDD Replacement (2348186-31) (cont’d)
9.) Secure the assembly with the 5.5 mm nuts removed in step 3.
10.) Attach the Power and IDE to the back of the HDD. Pay attention to the orientation of the guide pin 
on the IDE Cable connector and the missing pin on the IDE connection of the HDD.Figure 8-31  HDD Mounting Tabs