NDA-24234 CHAPTER 5 Page 311 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-025 Sheet 1/1 Station to Station Connection Test START Confirm that a connection can be established between Station “A” and Station “B.” Station “A” goes off-hook. Station “A” hears DT. Station “A” dials the station number of Station “B.” Station “A” confirms that DT stops when the first digit has been dialed. Station “A” confirms that RBT (Ring Back Tone) is heard after dialing ends. Station “B” hears ringing on the telephone...
Page 342
CHAPTER 5 NDA-24234 Pag e 31 2 Revision 3.0 INSTALLATION TEST PROCEDURE 3. SYSTEM INITIALIZED TEST 3.1 Outline Tests are to be performed on the restart processing (reinitialization) and system changeover functions which en- able the system to restart its operations and services. 3.2 System Initialized Test Procedure The System Changeover Test and Initialization Tests are to be performed per the NAP Numbers indicated to the right of each item in the following flowchart. START System Changeover...
Page 343
NDA-24234 CHAPTER 5 Page 313 Revision 3.0 INSTALLATION TEST PROCEDURE Test Outline: Tests are performed to see if a changeover of the dual systems (Control Systems and Speech Path Systems) of the PBX can be executed. NAP-200-026 Sheet 1/7 System Changeover Test Single IMG and Multiple IMG Configuration START Perform a Control System Changeover test by switch operations Control System change- over via MBR switch on the DSP (PZ-DK224) cardOn the DSP card of which OPE lamp is turning ON, flip the “MBR”...
Page 344
CHAPTER 5 NDA-24234 Pag e 31 4 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-1 How to Perform a Control System Changeover (Single IMG Configuration) Figure 026-2 How to Perform a Control System Changeover (Multiple IMG Configuration) NAP-200-026 Sheet 2/7 System Changeover Test Single IMG and Multiple IMG Configuration ATTENTIONContents Static Sensitive Handling Precautions Required Flip the MBR switch on the DSP.CPUOPEWDT IMG0 IMG1 IMG2 IMG3 MBR LegendDSP in ACT modeDSP in ST-BY mode : Lamp is...
Page 345
NDA-24234 CHAPTER 5 Page 315 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-3 LEDs and Switches on TSW/MUX NAP-200-026 Sheet 3/7 System Changeover Test Single IMG Configuration Perform a TSW system changeover test by means of switch operations. (Refer to Figure 026-3) TSW changeover via switch.On the TSW (PH-SW10) card on which the “TSW ACT” lamp is turning ON, flip the “TSW MBR” switch DOWN-UP-DOWN. System Messages “7-E,” “7-F” and “1-T” are displayed in succession. Perform a PLO system...
Page 346
CHAPTER 5 NDA-24234 Pag e 31 6 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-026 Sheet 4/7 System Changeover Test Multiple IMG Configuration Perform a Speech Path system changeover test by switch operations. (Refer to Figure 026-4) TSW changeover via switchOn the active GT (PA-GT09) card on which the “OPE/MB” lamp is illuminating, flip the “MBR” switch DOWN-UP- DOWN. Make sure that the active Speech Path system has been changed over to the ST-BY mode. (Check all the related circuit cards, which...
Page 347
NDA-24234 CHAPTER 5 Page 317 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-4 LEDs and Switches for System Changeover (Multiple IMG Configuration) NAP-200-026 Sheet 5/7 System Changeover Test Multiple IMG Configuration ATTENTIONContents Static Sensitive Handling Precautions Required MUX (PH-PC36) MUX ACT MBTSW (PH-SW12)GT (PA-GT09) OPE/MB MBRMBDLKC (PH-PC20) OPE/MB MB FRONT VIEW TSW ACT TSW MBRMB PLO Note 1 OPE/ACT Note 2 MB Note 1:PH-CK16/PH-CK17, or PH-CK16-A/PH-CK17-A Note 2:“OPE” for...
Page 348
CHAPTER 5 NDA-24234 Pag e 31 8 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-5 System Block Diagram (TSW and MUX) (Multiple IMG Configuration) NAP-200-026 Sheet 6/7 System Changeover Test Single IMG Configuration LC/TRK LC/TRK LC/TRK LC/TRK MUX MUX MUX MUX TSW/INT/PLO CPU GT LANI PCM HW PM BUS PCM HW PM BUS PCM HW PM BUS PCM HW PM BUS D T GTSW/INT PLOLV D S MUX CFT From EM A MUSIC MUX LC/TRK PHSW10DTI DCS CPR
Page 349
NDA-24234 CHAPTER 5 Page 319 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-6 System Block Diagram (GT and Other Controlling Blocks) (Multiple IMG Configuration) NAP-200-026 Sheet 7/7 System Changeover Test Multiple IMG Configuration This figure shows a system block diagram centering on the CPU and its controlling GT. Although each side ap- pears to have complicated connections, the controlling route of CPU 0 goes directly to GT 0, and that of CPU 1 to GT 1. Therefore, if the system of CPU is once...
Page 350
CHAPTER 5 NDA-24234 Pag e 32 0 Revision 3.0 INSTALLATION TEST PROCEDURE Figure 026-7 System Block Diagram (Speech Path) (Multiple IMG Configuration) NAP-200-026 Sheet 8/8 System Changeover Test Multiple IMG Configuration This figure shows a system block diagram centering on the GT and its controlling Speech Path System. By chang- ing over the ACT/ST-BY of the Speech Path System, all the related systems, such as TSW/INT, DLKC, and MUX, are totally switched over. The changeover can be executed by a key...