NDA-24234 CHAPTER 5
Page 341
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-040
Sheet 2/2
Connection Test-Paging Trunk for Paging 
Transfer Service
Connection
For Non-Delay-System
Station “C” is connected to Station “A”.
When Station “A” hangs up, Stations “B” and “C” are automatically connected 
with each other.
For a Delay-System
Station “A” rings and picks up handset
Station “A” is connected to Stations “C”.
When Station “A” hangs up, Stations “B” and “C” are automatically connected 
with each...

Page 372

CHAPTER 5 NDA-24234
Pag e 34 2
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-041
Sheet 1/1
Radio Paging Trunk (COT Card) 
Connection Test
START
Call the Radio Paging Equipment Station “A” dials the radio paging access code and hears 
Special Dial Tone from the Radio Paging Equipment, then 
dials the slave station number.
The paging radio of the slave station starts ringing.
By hearing CRBT (Continuous Ring Back Tone) from the
Radio Paging Equipment, Station “A” confirms that the slave
station is being...

Page 373

NDA-24234 CHAPTER 5
Page 343
Revision 3.0
INSTALLATION TEST PROCEDURE
Test Outline:
The Howler Tone Generator and the Ringing Generator are equipped on the PWR Supply.
The purpose of the test is to confirm ringing signal by setting up a station to station connection and a howler tone
connection from a station accommodated in any PIM.
NAP-200-042
Sheet 1/2
Howler & Ringing Signal Test
START
Check PWR0 in each PIM.
While both PWR Supplies are OFF, turn power to PWR0 ON. Leave PWR1 OFF.
Check howler tone.
A...

Page 374

CHAPTER 5 NDA-24234
Pag e 34 4
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-042
Sheet 2/2
Howler & Ringing Signal Test
Check PWR1 in each PIM.
While both PWR Supplies are OFF, turn power to PWR1 ON. Leave PWR0 OFF.
Check howler tone.
A station accommodated in the PIM for which the PWR Supply is to be tested goes off-
hook. (analog port only)
The station hears DT.
In about 12 seconds, the station hears ROT.
About 30 seconds later, the station should confirm hearing howler tone.
Check ringing signal....

Page 375

NDA-24234 CHAPTER 5
Page 345
Revision 3.0
INSTALLATION TEST PROCEDURE
5. OVERALL TEST
5.1 Outline
Tests are to be performed to check C.O. Lines and/or Tie Lines by connecting them to a trunk on an individual
basis.
The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connec-
tion to the distant office will be checked.  Release of the trunk used will also be checked.
5.2 Overall Test Procedure
The procedure for performing the Overall Test is described in...

Page 376

CHAPTER 5 NDA-24234
Pag e 34 6
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-043
Sheet 1/1
Overall Test for C.O. Line Outgoing Call
START
Seizure of trunk to be tested
When seizing from a 
stationPlace the trunk to be tested into idle state, and make all other 
trunks busy.
Station “A” dials the trunk access number.
Station “A”, after hearing dial tone from the C.O., dials the 
pilot number for the local office and allows the call to be 
terminated to that office via loop-back at the C.O.
When seizing...

Page 377

NDA-24234 CHAPTER 5
Page 347
Revision 3.0
INSTALLATION TEST PROCEDURE
Test Outline:
The tests comprising this NAP are to be performed according to the C.O. Line Number Table provided by the C.O.
If the C.O. Line Numbers are not known, tests cannot be performed because loop-back cannot be performed at the
C.O.
In addition, tests cannot be performed which involve Direct Inward Dialing.  Under such circumstances, the C.O.
must be asked to perform an incoming test.
NAP-200-044
Sheet 1/1
Overall Test for C.O....

Page 378

CHAPTER 5 NDA-24234
Pag e 34 8
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-045
Sheet 1/2
Overall Test of CCIS Tie Line Outgoing 
Call
START
Seizure of trunk to be tested
When seizing from a 
stationPlace the trunk to be tested into idle state, and make busy all 
other trunks.
Station “A” dials the number for station “B” in the PBX-B
When seizing from an 
ATTCONAn ATTCON sets up the connection with a specific trunk 
designated by Individual Trunk Access for CCIS TRK 
service and dials the number for...

Page 379

NDA-24234 CHAPTER 5
Page 349
Revision 3.0
INSTALLATION TEST PROCEDURE
(Procedure A)
NAP-200-045
Sheet 2/2
Overall Test of CCIS Tie Line Outgoing 
Call
START
On the DTI/CCT card, set its MB switch UP.
In any office other than the Primary Office (Clock-Source-Office), disconnect the DTI/CCT cable 
connector at the DTI/CCT side (Backplane of PIM)
PLO alarm is generated, but ignore it.
The PLO starts running by itself.
Make the following connection at the MDF using a paired wire.
The DTI does not recover....

Page 380

CHAPTER 5 NDA-24234
Pag e 35 0
Revision 3.0
INSTALLATION TEST PROCEDURE
NAP-200-046
Sheet 1/1
Overall Test of CCIS Tie Line Incoming 
Call
START
Seizure of trunk to be tested Place the trunk to be tested into idle state, and make busy all 
other trunks.
Termination of incoming call to 
station “A” in the self officeAn incoming call from the distant office terminates to 
Station “A”.
Check of speech After the call has been answered at Station “A”, check the 
speech conditions including speech level,...