NDA-24234 CHAPTER 5 Page 341 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-040 Sheet 2/2 Connection Test-Paging Trunk for Paging Transfer Service Connection For Non-Delay-System Station “C” is connected to Station “A”. When Station “A” hangs up, Stations “B” and “C” are automatically connected with each other. For a Delay-System Station “A” rings and picks up handset Station “A” is connected to Stations “C”. When Station “A” hangs up, Stations “B” and “C” are automatically connected with each...
Page 372
CHAPTER 5 NDA-24234 Pag e 34 2 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-041 Sheet 1/1 Radio Paging Trunk (COT Card) Connection Test START Call the Radio Paging Equipment Station “A” dials the radio paging access code and hears Special Dial Tone from the Radio Paging Equipment, then dials the slave station number. The paging radio of the slave station starts ringing. By hearing CRBT (Continuous Ring Back Tone) from the Radio Paging Equipment, Station “A” confirms that the slave station is being...
Page 373
NDA-24234 CHAPTER 5 Page 343 Revision 3.0 INSTALLATION TEST PROCEDURE Test Outline: The Howler Tone Generator and the Ringing Generator are equipped on the PWR Supply. The purpose of the test is to confirm ringing signal by setting up a station to station connection and a howler tone connection from a station accommodated in any PIM. NAP-200-042 Sheet 1/2 Howler & Ringing Signal Test START Check PWR0 in each PIM. While both PWR Supplies are OFF, turn power to PWR0 ON. Leave PWR1 OFF. Check howler tone. A...
Page 374
CHAPTER 5 NDA-24234 Pag e 34 4 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-042 Sheet 2/2 Howler & Ringing Signal Test Check PWR1 in each PIM. While both PWR Supplies are OFF, turn power to PWR1 ON. Leave PWR0 OFF. Check howler tone. A station accommodated in the PIM for which the PWR Supply is to be tested goes off- hook. (analog port only) The station hears DT. In about 12 seconds, the station hears ROT. About 30 seconds later, the station should confirm hearing howler tone. Check ringing signal....
Page 375
NDA-24234 CHAPTER 5 Page 345 Revision 3.0 INSTALLATION TEST PROCEDURE 5. OVERALL TEST 5.1 Outline Tests are to be performed to check C.O. Lines and/or Tie Lines by connecting them to a trunk on an individual basis. The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connec- tion to the distant office will be checked. Release of the trunk used will also be checked. 5.2 Overall Test Procedure The procedure for performing the Overall Test is described in...
Page 376
CHAPTER 5 NDA-24234 Pag e 34 6 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-043 Sheet 1/1 Overall Test for C.O. Line Outgoing Call START Seizure of trunk to be tested When seizing from a stationPlace the trunk to be tested into idle state, and make all other trunks busy. Station “A” dials the trunk access number. Station “A”, after hearing dial tone from the C.O., dials the pilot number for the local office and allows the call to be terminated to that office via loop-back at the C.O. When seizing...
Page 377
NDA-24234 CHAPTER 5 Page 347 Revision 3.0 INSTALLATION TEST PROCEDURE Test Outline: The tests comprising this NAP are to be performed according to the C.O. Line Number Table provided by the C.O. If the C.O. Line Numbers are not known, tests cannot be performed because loop-back cannot be performed at the C.O. In addition, tests cannot be performed which involve Direct Inward Dialing. Under such circumstances, the C.O. must be asked to perform an incoming test. NAP-200-044 Sheet 1/1 Overall Test for C.O....
Page 378
CHAPTER 5 NDA-24234 Pag e 34 8 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-045 Sheet 1/2 Overall Test of CCIS Tie Line Outgoing Call START Seizure of trunk to be tested When seizing from a stationPlace the trunk to be tested into idle state, and make busy all other trunks. Station “A” dials the number for station “B” in the PBX-B When seizing from an ATTCONAn ATTCON sets up the connection with a specific trunk designated by Individual Trunk Access for CCIS TRK service and dials the number for...
Page 379
NDA-24234 CHAPTER 5 Page 349 Revision 3.0 INSTALLATION TEST PROCEDURE (Procedure A) NAP-200-045 Sheet 2/2 Overall Test of CCIS Tie Line Outgoing Call START On the DTI/CCT card, set its MB switch UP. In any office other than the Primary Office (Clock-Source-Office), disconnect the DTI/CCT cable connector at the DTI/CCT side (Backplane of PIM) PLO alarm is generated, but ignore it. The PLO starts running by itself. Make the following connection at the MDF using a paired wire. The DTI does not recover....
Page 380
CHAPTER 5 NDA-24234 Pag e 35 0 Revision 3.0 INSTALLATION TEST PROCEDURE NAP-200-046 Sheet 1/1 Overall Test of CCIS Tie Line Incoming Call START Seizure of trunk to be tested Place the trunk to be tested into idle state, and make busy all other trunks. Termination of incoming call to station “A” in the self officeAn incoming call from the distant office terminates to Station “A”. Check of speech After the call has been answered at Station “A”, check the speech conditions including speech level,...