NEC Neax 2000 Ivs2 Installation Procedure Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs2 Installation Procedure Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
CHAPTER 2 INSTALLATION Procedure NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 45 PROCEDURE This flowchart explains the procedures for installing the PBX system. Follow the procedures in Figure 2-2. Figure 2-2 Procedure Flowchart (1 of 2) START UNPACKING INSTALLATION OF MAIN EQUIPMENT BATTERY CONNECTION TERMINATION OF CABLES ON MDF SUPPLY VOLTAGE CHECK AND HEAT RUN TEST CABLE RUNNING TO MDF INSTALLATION OF PERIPHERAL EQUIPMENT A POWER CABLE CONNECTION SWITCH SETTINGS OF CIRCUIT...
Page 72
CHAPTER 2 INSTALLATION Procedure NEAX2000 IVS2 Installation Procedure ManualPage 46ND-70928 (E), Issue 1.0 Figure 2-2 Procedure Flowchart (2 of 2) For Floor Standing Installation, there are three methods to install the equipment. It depends on the country according to the UL/cUL/ACA. NOTE: UL = Underwriters Laboratories (U.S.A.) cUL = Canadian Underwriters Laboratories (Canada) ACA = Australian Communication Authority (Australia) “Stationary Equipment (For North America/ Australia)” “Fixed Equipment...
Page 73
CHAPTER 2 INSTALLATION Stationary Equipment (For North America/Australia) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 47 Stationary Equipment (For North America/Australia) The equipment is placed on the BASE TRAY which is fixed on the floor, and is connected to 120V/ 240V AC Power Source using AC CORD-D cable. For installation of Stationary Equipment, see the following pages. WIRING AC CABLE TO TERMINALS - Using AC CORD-D Page 50 INSTALLATION OF MAIN EQUIPMENT - Floor Marking...
Page 74
CHAPTER 2 INSTALLATION Fixed Equipment (For Other Countries) NEAX2000 IVS2 Installation Procedure ManualPage 48ND-70928 (E), Issue 1.0 The mark shown below is attached to each procedure in which circuit cards are handled. When doing such a procedure, the installer must perform the procedure with caution, to prevent dam- age caused by static electricity (See “Static Electricity Guard”on Page 39 ). ATTENTION Contents Static Sensitive Handling Precautions Required
Page 75
CHAPTER 2 INSTALLATION Unpacking NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 49 UNPACKING (1) Check the received quantity of packages containing the PBX system with the description on the shipping document. (2) Check the packaging for external damage done by transportation and record it as necessary. (3) Unpack the packaging. For unpacking the packages containing circuit cards, a grounded wrist strap should be worn. (4) Check the quantity of equipment and materials...
Page 76
CHAPTER 2 INSTALLATION Wiring AC Cable to Terminals NEAX2000 IVS2 Installation Procedure ManualPage 50ND-70928 (E), Issue 1.0 WIRING AC CABLE TO TERMINALS There are two kinds of AC cable : AC CORD-D For Stationary Equipment/Fixed Equipment (For Other Countries) : Installation Cable For Fixed Equipment (For North America/ Australia) Using AC CORD-D (1) Take the AC CORD-D out of the hole on the left side of the BASE, then secure the code to the BASE with the cord bush. NOTE: Cord bush is attached to the...
Page 77
CHAPTER 2 INSTALLATION Using AC CORD-D NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 51 (4) When the system is two-frame configuration, the AC CORD-D of the right side frame can go through the BASE of the left side frame. Figure 2-4 AC CORD Wiring for Two-Frame Configuration BASE FGLINENEUTRALFGLINENEUTRAL TERMINAL BLOCKS TO 120V/240V AC POWER SOURCE AC CORD-D CORD BUSH
Page 78
CHAPTER 2 INSTALLATION Using Installation Cable NEAX2000 IVS2 Installation Procedure ManualPage 52ND-70928 (E), Issue 1.0 Using Installation Cable (1) Take the Installation cable out of the hole on the left side of the BASE, then secure the cable to the BASE with the cord bush. NOTE:The installer is to use minimum 16 AWG (1.3 φ) size wire, maximum 9 mm size cable. (2) Wire the Installation cable and the FG cable to the FG, NEUTRAL, LINE and Ground terminals on the BASE. (3) Wire the AC CORD-B to the...
Page 79
CHAPTER 2 INSTALLATION Using Installation Cable NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 53 (4) When the system is two-frame configuration, the Installation cable of the right side frame can go through the BASE of the left side frame. Figure 2-6 Installation Cable Wiring for Two-Frame Configuration BASE FGLINENEUTRALFGLINENEUTRAL TERMINAL BLOCKS TO AC POWER DISTRIBUTION BOARD INSTALLATION CABLE CORD BUSH
Page 80
CHAPTER 2 INSTALLATION Installation of Main Equipment NEAX2000 IVS2 Installation Procedure ManualPage 54ND-70928 (E), Issue 1.0 INSTALLATION OF MAIN EQUIPMENT Floor Standing Installation Check the site for installing the PBX with the work drawing to verify that the required floor space is ensured and that service entrances and ducts for trunk/extension cables, power cables and bus cables have been properly worked at correct positions. See Figure 2-7 and Figure 2-8. Mark positions for installation...