Page 71

CHAPTER 2 INSTALLATION
Procedure
NEAX2000 IVS2 Installation Procedure Manual
ND-70928 (E), Issue 1.0Page 45
PROCEDURE
This flowchart explains the procedures for installing the PBX system. Follow the procedures in
Figure 2-2.
Figure 2-2  Procedure Flowchart (1 of 2)
START
UNPACKING
INSTALLATION
OF
MAIN EQUIPMENT
BATTERY
CONNECTION
TERMINATION OF
CABLES ON MDF SUPPLY VOLTAGE CHECK
AND
HEAT RUN TEST
CABLE RUNNING
TO MDF
INSTALLATION
OF
PERIPHERAL EQUIPMENT
A POWER CABLE
CONNECTION
SWITCH SETTINGS
OF
CIRCUIT...

Page 72

CHAPTER 2 INSTALLATION
Procedure
NEAX2000 IVS2 Installation Procedure ManualPage 46ND-70928 (E), Issue 1.0
Figure 2-2  Procedure Flowchart (2 of 2)
For Floor Standing Installation, there are three methods to install the equipment. It depends on
the country according to the UL/cUL/ACA.
NOTE:
UL = Underwriters Laboratories (U.S.A.)
cUL = Canadian Underwriters Laboratories (Canada)
ACA = Australian Communication Authority (Australia)
“Stationary Equipment (For North America/ Australia)”
“Fixed Equipment...

Page 73

CHAPTER 2 INSTALLATION
Stationary Equipment (For North America/Australia)
NEAX2000 IVS2 Installation Procedure Manual
ND-70928 (E), Issue 1.0Page 47
Stationary Equipment (For North America/Australia)
The equipment is placed on the BASE TRAY which is fixed on the floor, and is connected to 120V/
240V AC Power Source using AC CORD-D cable.
For installation of Stationary Equipment, see the following pages.
WIRING AC CABLE TO TERMINALS - Using AC CORD-D  Page 50
INSTALLATION OF MAIN EQUIPMENT - Floor Marking...

Page 74

CHAPTER 2 INSTALLATION
Fixed Equipment (For Other Countries)
NEAX2000 IVS2 Installation Procedure ManualPage 48ND-70928 (E), Issue 1.0
The mark shown below is attached to each procedure in which circuit cards are handled. When
doing such a procedure, the installer must perform the procedure with caution, to prevent dam-
age caused by static electricity (See “Static Electricity Guard”on Page 39
).
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required 

Page 75

CHAPTER 2 INSTALLATION
Unpacking
NEAX2000 IVS2 Installation Procedure Manual
ND-70928 (E), Issue 1.0Page 49
UNPACKING
(1) Check the received quantity of packages containing the PBX system with the description on 
the shipping document.
(2) Check the packaging for external damage done by transportation and record it as 
necessary.
(3) Unpack the packaging.
For unpacking the packages containing circuit cards, a grounded wrist strap should be 
worn.
(4) Check the quantity of equipment and materials...

Page 76

CHAPTER 2 INSTALLATION
Wiring AC Cable to Terminals
NEAX2000 IVS2 Installation Procedure ManualPage 50ND-70928 (E), Issue 1.0
WIRING AC CABLE TO TERMINALS
There are two kinds of AC cable : AC CORD-D For Stationary Equipment/Fixed Equipment (For
Other Countries)
: Installation Cable For Fixed Equipment (For North America/
Australia)
Using AC CORD-D
(1) Take the AC CORD-D out of the hole on the left side of the BASE, then secure the code to 
the BASE with the cord bush.
NOTE:
Cord bush is attached to the...

Page 77

CHAPTER 2 INSTALLATION
Using AC CORD-D
NEAX2000 IVS2 Installation Procedure Manual
ND-70928 (E), Issue 1.0Page 51
(4) When the system is two-frame configuration, the AC CORD-D of the right side frame can 
go through the BASE of the left side frame.
Figure 2-4  AC CORD Wiring for Two-Frame Configuration
BASE
FGLINENEUTRALFGLINENEUTRAL
TERMINAL
BLOCKS TO
120V/240V AC
POWER SOURCE
AC CORD-D
CORD BUSH 

Page 78

CHAPTER 2 INSTALLATION
Using Installation Cable
NEAX2000 IVS2 Installation Procedure ManualPage 52ND-70928 (E), Issue 1.0
Using Installation Cable
(1) Take the Installation cable out of the hole on the left side of the BASE, then secure the cable 
to the BASE with the cord bush.
NOTE:The installer is to use minimum 16 AWG (1.3
φ) size wire, maximum 9 mm size
cable.
(2) Wire the Installation cable and the FG cable to the FG, NEUTRAL, LINE and Ground 
terminals on the BASE.
(3) Wire the  AC CORD-B to the...

Page 79

CHAPTER 2 INSTALLATION
Using Installation Cable
NEAX2000 IVS2 Installation Procedure Manual
ND-70928 (E), Issue 1.0Page 53
(4) When the system is two-frame configuration, the Installation cable of the right side frame 
can go through the BASE of the left side frame.
Figure 2-6  Installation Cable Wiring for Two-Frame Configuration
BASE
FGLINENEUTRALFGLINENEUTRAL
TERMINAL
BLOCKS TO
AC POWER
DISTRIBUTION
BOARD
INSTALLATION CABLE
CORD BUSH 

Page 80

CHAPTER 2 INSTALLATION
Installation of Main Equipment
NEAX2000 IVS2 Installation Procedure ManualPage 54ND-70928 (E), Issue 1.0
INSTALLATION OF MAIN EQUIPMENT
Floor Standing Installation

Check the site for installing the PBX with the work drawing to verify that 
the required floor space is ensured and that service entrances and 
ducts for trunk/extension cables, power cables and bus cables have 
been properly worked at correct positions. See Figure 2-7 and Figure 
2-8.

Mark positions for installation...