NEC Neax 2000 Ivs2 Installation Procedure Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs2 Installation Procedure Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 101
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 75 19-inch Rack Mounting Installation Check the site for installing the PBX with the work drawing to verify that the required floor space is ensured and that service entrances and ducts for trunk/extension cables, power cables and grounding conductors have been properly worked at correct positions. See Figure 2-7 and Figure 2-8. Detach the SIDE COVER and SIDE PANEL of the...
Page 102
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure ManualPage 76ND-70928 (E), Issue 1.0 Detaching SIDE COVER/SIDE PANEL (1) Remove the two screws fixing the SIDE COVER. (2) Pivot the SIDE COVER on its bottom to remove it. (3) Remove the SIDE PANEL fixed by three screws, from the left side flame of the PIM. Figure 2-21 Detaching SIDE COVER (1 of 2) SCREW SIDE COVER
Page 103
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 77 Figure 2-21 Detaching SIDE PANEL (2 of 2) SCREWS SIDE PANEL
Page 104
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure ManualPage 78ND-70928 (E), Issue 1.0 Connection of 19” RACK BRACKET (A) (1) Insert the nails of the 19” RACK BRACKET (A) into the side frame of the PIM. (2) Secure them with four screws each. NOTE: Screws are attached to the 19” RACK BRACKET (A). Figure 2-22 Connection of 19” RACK BRACKET (A) 19” RACK BRACKET (A) SCREWS NAILS
Page 105
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 79 Mounting PIM to 19-inch RACK (1) Mount the PIM with 19” RACK BRACKET (A) into the 19-inch RACK. (2) Secure them with four screws (locally provided). Figure 2-23 Mounting PIM to 19-inch Rack 19” RACK BRACKET (A) SCREWS
Page 106
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure ManualPage 80ND-70928 (E), Issue 1.0 Connection of 19” RACK BRACKET (B) (1) Place the BASE PLATE on the 19” RACK BRACKET (B). (2) Secure the BASE PLATE with four washers and nuts. (3) Mount the BASE to the BASE PLATE. (See Figure 2-12.) (4) Mount the PIM to the BASE. (See Figure 2-13.) NOTE: Nuts and washers are attached to the 19” RACK BRACKET (B). Figure 2-24 Connection of 19” RACK BRACKET (B) NUT...
Page 107
CHAPTER 2 INSTALLATION 19-inch Rack Mounting Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 81 Figure 2-25 Mounting Multiple-PIM to 19-inch RACK
Page 108
CHAPTER 2 INSTALLATION BUS Cable Connection NEAX2000 IVS2 Installation Procedure ManualPage 82ND-70928 (E), Issue 1.0 BUS Cable Connection When the system is a multiple-PIM configuration, connect all the BUS Connector to each other using BUS cables, as shown below. Be sure to secure the BUS cables using tie wraps to avoid obstructing a PFT card. Figure 2-26 BUS Cable Connection of BUS Cables 700 mm (27.6 inch) 48-TW-0.7 CONN CA P W R P W R P W R P W R P W R P W R P W R P W R PIM3 PIM2...
Page 109
CHAPTER 2 INSTALLATION Power Cable Connection NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 83 POWER CABLE CONNECTION The cable connections on the PZ-PW121 card are shown below. Figure 2-27 Cable Connection on PZ-PW121 NOTE 1: Follow the Label on Front Plate of PZ-PW121. NOTE 2: If GND (Signal GND) has to be separated from FG (Frame GND), remove the link be- tween GND and FG terminals. MJ MN TO AUXILIARY EQUIPMENT 1: OFF: NO CONNECTION 2: ON: SEAL/FLOAT2 OFF:...
Page 110
CHAPTER 2 INSTALLATION Connection of AC CORD-B NEAX2000 IVS2 Installation Procedure ManualPage 84ND-70928 (E), Issue 1.0 Connection of AC CORD-B (1) Connect the AC CORD-B to the CN1 connector on the PZ-PW121 card. (2) Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM. Figure 2-28 Connection of AC CORD-B CORD BUSH BASE TERMINAL BLOCKS FRONT PZ-PW121 CN1 AC CORD-BAC CORD-D TO 120V/240V AC POWER SOURCE