    							CHAPTER 3 ND-45492 (E)
    Pag e 4 4
    Revision 2.0
    (14) When the system is a multiple-rack configuration, connect  the PN-BS00 in rack 1 to the PN-BS00 in rack
    using BUS cable, as shown in Figure 003-19 and Figure 003-20.
    Figure 003-19  BUS Cable
    NAP 200-003
    Sheet 22/37
    Installation of Main Equipment
    1 meter  (39 inches)
    48-TW-1 CONN CA 
    						
    							ND-45492 (E) CHAPTER 3
    Page 45
    Revision 2.0
    Figure 003-20  Connection of the BUS Cables
    NAP 200-003
    Sheet 23/37
    Installation of Main Equipment
    PIM7
    PIM6
    PIM5
    PIM4 PIM3
    PIM2
    PIM1
    PIM0BS01
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1BS01
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    CN2
    CN1
    48-TW-1 CONN CA
    BS01
    BS01
    BS00BS01
    BS01
    BS01
    48-TW-.07 
    CONN CARack 1
    Rack 2 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 4 6
    Revision 2.0
    2. Wall Mounting Installation
    (1) Using four appropriate fasteners (locally provided; see Table 003-1) for the type of wall construction, se-
    cure the RACK PARTS as shown in Figure 003-21.  For the wall mounting points, refer to Figure 002-2 in
    NAP-200-002.
    Note:For the wall-mounting installation, a concrete wall is recommended because the concrete wall is more firm
    to mount the PBX than a wooden wall or a plaster board. The plaster board is the most infirm wall of the
    three.
    NAP 200-003
    Sheet 24/37
    Installation of Main Equipment
    Table 003-1  Recommended Fasteners
    WALL TYPE RECOMMENDED FASTENER
    PLASTER BOARD
    [THICKNESS Min. 9.6 mm
    (0.38 inch)]MOLLY ANCHOR TYPE Min. 3.5 mm (0.14 inch) DIA.
    Max. 4.5 mm (0.17 inch) DIA
    WOOD WOOD TYPE SCREWS Min. 3.5 mm (0.14 inch) DIA 
    Max. 4.5 mm (0.17 inch) DIA
    CONCRETE ANCHOR BOLT TYPE Recommended 4 mm (0.16 inch) by 
    25 mm (0.98 inch) 
    						
    							ND-45492 (E) CHAPTER 3
    Page 47
    Revision 2.0
    Figure 003-21  Screwing the RACK PARTS to a Wall
    NAP 200-003
    Sheet 25/37
    Installation of Main Equipment
    350 mm 
    (13.8 inch)
    350 mm 
    (13.8 inch)
    250 mm 
    (9.8 inch)
    ANCHOR (x4/PIM) 
    (SEE FIGURE 002-2)
    (WALL)382 mm (15.0 inch)
    M4 MACHINE SCREW-B (x4/PIM) 
    SECURED TO RACK PARTS 
    (PROVIDED WITH RACK PARTS)
    SCREW-A (x4/PIM) 
    SECURING RACK PARTS TO WALL 
    (LOCALLY PROVIDED) 
    (SEE TABLE 003-1)
    M5 MACHINE SCREW-C (x4/PIM) 
    (PROVIDED WITH RACK PARTS) 
    (SEE FIGURE 003-20)
    RACK PARTS 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 4 8
    Revision 2.0
    (2) When mounting the RACK PARTS to a wall, connect all the RACK PARTS to each other, and connect the
    BASE to the bottom RACK PARTS using the M5 Machine screws (provided), as shown in Figure 003-21.
    Figure 003-22  Connecting the RACK PARTS and the BASE
    NAP 200-003
    Sheet 26/37
    Installation of Main Equipment
    (JOINT)
    RACK PARTS
    M5 MACHINE SCREW-C 
    (x2/JOINT AREA) 
    (PROVIDED WITH RACK PARTS)
    (JOINT)
    BASE 
    						
    							ND-45492 (E) CHAPTER 3
    Page 49
    Revision 2.0
    (3) Attach four M4 machine screws (provided) to the RACK PARTS as shown in Figure 003-21.  
    For proper mounting of each PIM, approximately 4 mm (0.2 inch) spacing should be provided between the
    inner face of the M4 machine screw and the RACK PARTS front channel.  See Figure 003-23.
    (4) Align and insert the key hole slots of the rear cover of each PIM to the machine screws secured in step (3).
    See Figure 003-23.
    Figure 003-23  Mounting the PIM to the RACK PARTS
    NAP 200-003
    Sheet 27/37
    Installation of Main Equipment
    (PIM)APPROX. 4 mm (0.2 inch)
    (WALL)
    SCREW-A (x 4)
    RACK PARTS
    M4 MACHINE SCREW-B (x 4)
    (REAR COVER)
    (LOCALLY PROVIDED)
    (PROVIDED WITH RACK PARTS) 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 5 0
    Revision 2.0
    (5) After hanging each PIM onto the RACK PARTS, tighten each M4 machine screw using a Phillips screw
    driver as shown in Figure 003-24.
    Figure 003-24  Screwing the PIM to the RACK PARTS
    NAP 200-003
    Sheet 28/37
    Installation of Main Equipment
    M4 MACHINE SCREW-B (X4)
    PIMRACK PARTS 
    						
    							ND-45492 (E) CHAPTER 3
    Page 51
    Revision 2.0
    (6) Connect the bottom PIM and the BASE, and connect PIMs to each other using 3 bolts (provided), as shown
    in Figure 003-6 and Figure 003-7. Then, position the TOP COVER on the top PIM and connect them to-
    gether with 4 screws (provided), as shown in Figure 003-8.
    (7) Connect the AC CORD-B to the terminals inside the BASE in the same manner as for the Floor Standing
    Installation (Refer to Figure 003-11 through Figure 003-13).
    (8) When the system is a multiple-PIM configuration, connect the PZ-PW86 cards to each other using PWR
    CA-A cables (Refer to Figure 003-14 through Figure 003-15).
    (9) When the system is a multiple-PIM configuration, mount the PN-BS00 card in the BUS slot of PIM0, and
    mount the PN-BS01 card in each BUS slot of PIM1 through PIM7 (Refer to Figure 003-16).
    Then, connect all the BUS cards (PN-BS00/PN-BS01) to each other using BUS cables (Refer to Figure
    003-17 and Figure 003-18).
    NAP 200-003
    Sheet 29/37
    Installation of Main Equipment 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 5 2
    Revision 2.0
    3. 19-Inch Rack-Mounting Installation
    3.1. Single-PIM Installation
    (1) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A to the PIM as
    shown in Figure 003-25.  The AC CORD-A is pre-installed with the BOTTOM COVER.
    Figure 003-25  Connecting the Covers and AC CORD-A to the PIM
    NAP 200-003
    Sheet 30/37
    Installation of Main Equipment
    TOP COVER
    TO PZ-PW86 PIM
    AC CORD-A
    BOTTOM COVER
    LOCAL CABLE DUCT
    PWR CA-A/BUS CABLE DUCT 
    						
    							ND-45492 (E) CHAPTER 3
    Page 53
    Revision 2.0
    (2) Secure the 19” BRACKET to the 19-inch Rack as shown in Figure 003-26.
    (3) Mount the PIM on the 19” BRACKET  as shown in Figure 003-26.
    Then, secure the PIM to the 19” BRACKET as shown in Figure 003-26.
    Figure 003-26  Mounting the PIM to the 19-Inch Rack (1 of 2)
    NAP 200-003
    Sheet 31/37
    Installation of Main Equipment
    A
    B
    C
    A
    BPIM 19” BRACKET
    C
    FRONT19” BRACKET19-INCH RACK
    PIM BOTTOM COVER 
    						