Page 51

CHAPTER 3 ND-45492 (E)
Pag e 3 4
Revision 2.0
(9) Confirm the connection of the PWR CNT CA-A and power output cables as shown in Figure 003-10
(These cables are pre-installed).
Figure 003-10  Cable Connection between the PZ-PW86 and the BWB
NAP 200-003
Sheet 12/37
Installation of Main Equipment
LTC CONNECTOR AREA
PIM
BWB (Back Wiring Board)PZ-PW86
PWR0B PWR0A
RS
PWR1
PWR CNT CA-A
POWER OUTPUT CABLE (CR,E)
POWER OUTPUT CABLE (+5V, -27V, E)CARD SLOT AREA 

Page 52

ND-45492 (E) CHAPTER 3
Page 35
Revision 2.0
(10) AC CORD-B and AC Power Cable Wiring
(a) The AC CORD-B and the AC Power Cable Wiring to the FG, NEUTRAL and LINE terminals inside
the BASE are shown in Figure 003-11 (for details of wiring to the terminals, see Figure 003-12).
Figure 003-11  AC CORD-B and AC Power Cable Wiring
NAP 200-003
Sheet 13/37
Installation of Main Equipment
TO      GROUND TERMINAL
FRONTSEE FIGURE 003-12AC CORD-B
3P AC POWER CABLE
PIM
PIM
BASE 

Page 53

CHAPTER 3 ND-45492 (E)
Pag e 3 6
Revision 2.0
(b) Secure the AC CORD-B cables to the FG, NEUTRAL and LINE terminals as shown in Figure 003-
12.  The 3P AC Power Cable and the FG Cable are pre-installed with the BASE.
Figure 003-12  Screwing the AC CORD-B to the Terminals
NAP 200-003
Sheet 14/37
Installation of Main Equipment
FG
NEUTRAL
LINE
BASE
3P AC POWER CABLE
TO 120/240 V AC  
SOURCE POWER
AC POWER 
KNOCK OUT HOLE
(PROVIDED WITH BASE)
FG CABLE
(PROVIDED WITH BASE)
PIMAC CORD-B 
TO PZ-PW86 IN PIM...

Page 54

ND-45492 (E) CHAPTER 3
Page 37
Revision 2.0
(c) When the system is a two-frame configuration, the 3P AC Power Cable of the left side frame can go
through the BASE of the right side frame, as shown in Figure 003-12.
Figure 003-13  AC Power Cable Wiring for Two-Frame Configuration
NAP 200-003
Sheet 15/37
Installation of Main Equipment
FGNEUTRALLINEFGNEUTRALLINE
3P AC POWER CABLE
TO 120/240 V AC 
SOURCE POWER
SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.) 

Page 55

CHAPTER 3 ND-45492 (E)
Pag e 3 8
Revision 2.0
(11) When the system is a multiple-PIM configuration, connect the PZ-PW86 Cards to each other using PWR
CA-A cables, as shown in Figure 003-14 and Figure 003-15.
Figure 003-14  PWR CA-A
NAP 200-003
Sheet 16/37
Installation of Main Equipment
550mm (21.7 inch)
PWR CA-A 

Page 56

ND-45492 (E) CHAPTER 3
Page 39
Revision 2.0
(a) When using an External Battery or the BATTM
Figure 003-15  Connection of PWR CA-A Cables (1 of 2)
NAP 200-003
Sheet 17/37
Installation of Main Equipment
PIM7
PIM6
PIM5
PIM4 PIM3
PIM2
PIM1
PIM0PWR CA-APZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
TO BATTERYPZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
TO BATTERY PWR CA-A
Note:For details of battery connection, see NAP- 200-005.
PWR CA-A
PWR...

Page 57

CHAPTER 3 ND-45492 (E)
Pag e 4 0
Revision 2.0
(b) When using an Internal Battery
Figure 003-15  Connection of PWR CA-A Cables (2 of 2)
NAP 200-003
Sheet 18/37
Installation of Main Equipment
PIM7
PIM6
PIM5
PIM4 PIM3
PIM2
PIM1
PIM0PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1
PZ-PW86
BATT2
BATT1 TO BATTERY
PWR CA-A
TO BATTERY
TO BATTERY
PWR CA-A
TO BATTERY TO BATTERY
PWR CA-A
TO BATTERY
TO BATTERY
PWR CA-A
TO...

Page 58

ND-45492 (E) CHAPTER 3
Page 41
Revision 2.0
(12) When the system is a multiple-PIM configuration, mount the PN-BS00 Card in the BUS slot of PIM0. 
Also, mount the  PN-BS01 Card in each BUS slot of PIM1 through PIM7.
When the system is a single PIM configuration, neither PN-BS00 nor PN-BS01 is needed.
Figure 003-16  Mounting of the BUS Cards
NAP 200-003
Sheet 19/37
Installation of Main Equipment
B
S
0
1
B
S
0
1
B
S
0
1
B
S
0
0
B
S
0
1
B
S
0
1
B
S
0
1
B
S
0
1
PIM3
PIM2
PIM1
PIM0PIM7
PIM6
PIM5
PIM4
BUS SLOT 

Page 59

CHAPTER 3 ND-45492 (E)
Pag e 4 2
Revision 2.0
(13) When the system is a multiple-PIM configuration, connect all the BUS Cards (PN-BS00/PN-BS01) to each
other using BUS cables, as shown in Figure 003-17 and Figure 003-18.
Figure 003-17  BUS Cable
NAP 200-003
Sheet 20/37
Installation of Main Equipment
700mm (27.6 inch)
48-TW-0.7 CONN CA 

Page 60

ND-45492 (E) CHAPTER 3
Page 43
Revision 2.0
Figure 003-18  Connection of the BUS Cables
NAP 200-003
Sheet 21/37
Installation of Main Equipment
PIM7
PIM6
PIM5
PIM4 PIM3
PIM2
PIM1
PIM0BS01
CN2
CN1
CN2
CN1
CN2
CN1
CN2
CN1BS01
CN2
CN1
CN2
CN1
CN2
CN1
CN2
CN1
48-TW-0.7 CONN CA
BS01
BS01
BS00BS01
BS01
BS01 