NEC Neax 2000 Ivs Installation Procedure Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs Installation Procedure Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 91
CHAPTER 3 ND-45492 (E) Pag e 7 4 Revision 2.0 1.1. Internal Battery Connection (1) Install the two batteries (12VDC, 3.0-3.4AH) into each PIM as shown in Figure 005-1. Figure 005-1 Internal Battery Mounting NAP 200-005 Sheet 3/7 Connection of Battery FRONT 67mmDIMENSION OF BATTERY BATTERY UNIT (2 ´ 12VDC, 3.0 to 3.4AH) (2.6 inch) 134mm (5.3 inch) 60mm (2.4 inch) BASE PIM PIM Recommended Batteries Yuasa NPH-3.2-12 Matsushita LCR-12V3.4NE
Page 92
ND-45492 (E) CHAPTER 3 Page 75 Revision 2.0 (2) Plug the battery cable connector into the BATT1 connector on the PZ-PW86 as shown in Figure 005-2. (3) Secure the batteries and battery cable using tie wraps as shown in Figure 005-2. Figure 005-2 Internal Battery Connection NAP 200-005 Sheet 4/7 Connection of Battery PLUG IN TO BATT 1 CONNECTOR ON PZ-PW86 FRONT TIE WRAP BASEPIM
Page 93
CHAPTER 3 ND-45492 (E) Pag e 7 6 Revision 2.0 (4) When the system is a multiple PIM configuration, provide the following connections to the internal batter- ies. Figure 005-3 Internal Battery Connection for a Multiple PIM Configuration NAP 200-005 Sheet 5/7 Connection of Battery BATT2 BATT1 PZ-PW86 –+–+ PIM3 BATT2 BATT1 PZ-PW86 –+–+ PIM2 BATT2 BATT1 PZ-PW86 –+–+ PIM1 BATT2 BATT1 PZ-PW86 –+–+ PIM0 BATTERY CABLE BATT2 BATT1 PZ-PW86 –+–+ PIM7 BATT2 BATT1 PZ-PW86 –+–+ PIM6 BATT2 BATT1 PZ-PW86 –+–+ PIM5...
Page 94
ND-45492 (E) CHAPTER 3 Page 77 Revision 2.0 1.2. Battery Connection in the BATTM (1) Connect the battery cables to the batteries, and mount the battery units (24 V DC, 24AH per unit) into the Battery Module (BATTM) as shown in Figure 005-4. Figure 005-4 Battery Mounting into the BATTM NAP 200-005 Sheet 6/7 Connection of Battery + + + + BATTERY CABLE TO PZ-PW86 IN PIM0/PIM4 BATTM BATTERY UNIT (24 V DC, 24AH) BATTERY UNIT (24 V DC, 24AH) FRONT TO PZ-PW86 IN PIM0/PIM4 Recommended Batteries Yuasa NP-24-12B...
Page 95
CHAPTER 3 ND-45492 (E) Pag e 7 8 Revision 2.0 (2) Plug the battery cable connector into the BATT1 connector on the PZ-PW86 in PIM0 or PIM4. Figure 005- 5 shows an example of battery connection in the BATTM for 8-PIM configuration. Figure 005-5 Battery Connection in the BATTM for a Multiple PIM Configuration NAP 200-005 Sheet 7/7 Connection of Battery –+–+ –+–+ BATT2 BATT1 PZ-PW86 PIM3 BATT2 BATT1 PZ-PW86 PIM2 BATT2 BATT1 PZ-PW86 PIM1 BATT2 BATT1 PZ-PW86 –+–+ PIM0 BATTERY CABLE BATT2 BATT1 PZ-PW86 PIM7...
Page 96
ND-45492 (E) CHAPTER 3 Page 79 Revision 2.0 1. MDF Cable To facilitate the termination of the 25 pair cables (MDF cables) from the system to the MDF shown in Figure 006-1, the length of each cable to be used should be predetermined according to the distance between the MDF and the system. Each cable should be labeled at both ends using a cable number or cable designation as shown in Table 006-1. Figure 006-1 MDF Cable NAP 200-006 Sheet 1/7 Cable Running to the MDF TO PIMCHAMP CONNECTOR TO MDFTWISTED 25...
Page 97
CHAPTER 3 ND-45492 (E) Pag e 8 0 Revision 2.0 NAP 200-006 Sheet 2/7 Cable Running to the MDF Table 006-1 MDF Cables for each PIM FROM CABLE NUMBER TOCABLE DESIGNATION MODULE CONNECTION PIM0LT C 0 1 MDF0 LTC0 LT C 1 2 0 LT C 1 LT C 2 3 0 LT C 2 PIM1LT C 0 4 MDF1 LTC0 LT C 1 5 1 LT C 1 LT C 2 6 1 LT C 2 PIM2LT C 0 7 MDF2 LTC0 LT C 1 8 2 LT C 1 LT C 2 9 2 LT C 2 PIM3LT C 0 1 0 MDF3 LTC0 LTC1 11 3 LTC1 LTC2 12 3 LTC2 PIM4LT C 0 1 3 MDF4 LTC0 LTC1 14 4 LTC1 LTC2 15 4 LTC2...
Page 98
ND-45492 (E) CHAPTER 3 Page 81 Revision 2.0 2. Cable Running to the External MDF (1) When not using the cable hole of the PIM (a) Bring the MDF cable up to the Main Equipment through the cable hole(s) of the BASE. (b) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the screws provided, as shown in Figure 006-2. (c) Pare the sheath of each MDF cable and secure the shield to the front bracket on the PIM using tie wraps, as shown in Figure 006-2. Figure 006-2 Cable...
Page 99
CHAPTER 3 ND-45492 (E) Pag e 8 2 Revision 2.0 (2) When using the cable hole of the PIM (a) Make the cable hole on the left side of PIM as shown in Figure 006-3. Figure 006-3 Making Cable Hole on the PIM (b) Bring the MDF cable up to the PIM0 through the cable hole (s) of the BASE and bring the MDF cable up to the other PIM through the cable hole (left side) of each PIM. (c) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the screws provided, as shwon in Figure...
Page 100
ND-45492 (E) CHAPTER 3 Page 83 Revision 2.0 Figure 006-4 Cable Running to the External MDF (2 of 2) NAP 200-006 Sheet 5/7 Cable Running to the MDF LTC CONNECTOR CHAMP CONNECTOR FRONT TO MDF BASE PIM0 PIM1PBXTIE WRAP SHIELDPIMMDF CABLE 25 ~ 30 mm(1.0 ~ 1.2 inch) TO MDF