1.1. Internal Battery Connection
(1) Install the two batteries (12VDC, 3.0-3.4AH) into each PIM as shown in Figure 005-1.
Figure 005-1  Internal Battery Mounting
NAP 200-005
Sheet 3/7
Connection of Battery
FRONT 67mmDIMENSION OF BATTERY
BATTERY UNIT
(2 
´ 12VDC, 3.0 to 3.4AH)
(2.6 inch)
134mm
(5.3 inch) 60mm
(2.4 inch)
BASE PIM PIM
Recommended Batteries
Yuasa NPH-3.2-12
Matsushita LCR-12V3.4NE 

Page 92

ND-45492 (E) CHAPTER 3
Page 75
Revision 2.0
(2) Plug the battery cable connector into the BATT1 connector on the PZ-PW86 as shown in Figure 005-2.
(3) Secure the batteries and battery cable using tie wraps as shown in Figure 005-2.
Figure 005-2  Internal Battery Connection
NAP 200-005
Sheet 4/7
Connection of Battery
PLUG IN TO BATT 1
CONNECTOR ON PZ-PW86
FRONT
TIE WRAP
BASEPIM 

Page 93

CHAPTER 3 ND-45492 (E)
Pag e 7 6
Revision 2.0
(4) When the system is a multiple PIM configuration, provide the following connections to the internal batter-
ies.
Figure 005-3  Internal Battery Connection for a Multiple PIM Configuration
NAP 200-005
Sheet 5/7
Connection of Battery
BATT2
BATT1 PZ-PW86
–+–+
PIM3
BATT2
BATT1 PZ-PW86
–+–+
PIM2
BATT2
BATT1 PZ-PW86
–+–+
PIM1
BATT2
BATT1 PZ-PW86
–+–+
PIM0
BATTERY CABLE
BATT2
BATT1 PZ-PW86
–+–+
PIM7
BATT2
BATT1 PZ-PW86
–+–+
PIM6
BATT2
BATT1 PZ-PW86
–+–+
PIM5...

Page 94

ND-45492 (E) CHAPTER 3
Page 77
Revision 2.0
1.2. Battery Connection in the BATTM
(1) Connect the battery cables to the batteries, and mount the battery units (24 V DC, 24AH per unit) into the
Battery Module (BATTM) as shown in Figure 005-4.
Figure 005-4  Battery Mounting into the BATTM
NAP 200-005
Sheet 6/7
Connection of Battery
+
+
+
+
BATTERY CABLE
TO PZ-PW86 IN PIM0/PIM4
BATTM
BATTERY UNIT (24 V DC, 24AH)
BATTERY UNIT (24 V DC, 24AH) FRONT
TO PZ-PW86 IN PIM0/PIM4
Recommended Batteries
Yuasa NP-24-12B...

Page 95

CHAPTER 3 ND-45492 (E)
Pag e 7 8
Revision 2.0
(2) Plug the battery cable connector into the BATT1 connector on the PZ-PW86 in PIM0 or PIM4. Figure 005-
5 shows an example of battery connection in the BATTM for 8-PIM configuration.
Figure 005-5  Battery Connection in the BATTM for a Multiple PIM Configuration
NAP 200-005
Sheet 7/7
Connection of Battery
–+–+
–+–+
BATT2
BATT1 PZ-PW86
PIM3
BATT2
BATT1 PZ-PW86
PIM2
BATT2
BATT1 PZ-PW86
PIM1
BATT2
BATT1 PZ-PW86
–+–+
PIM0
BATTERY CABLE
BATT2
BATT1 PZ-PW86
PIM7...

Page 96

ND-45492 (E) CHAPTER 3
Page 79
Revision 2.0
1. MDF Cable
To facilitate the termination of the 25 pair cables (MDF cables) from the system to the MDF shown in Figure
006-1, the length of each cable to be used should be predetermined according to the distance between the MDF
and the system. Each cable should be labeled at both ends using a cable number or cable designation as shown
in Table 006-1.
Figure 006-1  MDF Cable
NAP 200-006
Sheet 1/7
Cable Running to the MDF
TO PIMCHAMP CONNECTOR
TO MDFTWISTED 25...

Page 97

CHAPTER 3 ND-45492 (E)
Pag e 8 0
Revision 2.0
NAP 200-006
Sheet 2/7
Cable Running to the MDF
Table 006-1  MDF Cables for each PIM
FROM
CABLE NUMBER TOCABLE
DESIGNATION
MODULE CONNECTION
PIM0LT C 0 1
MDF0   LTC0
LT C 1 2 0    LT C 1
LT C 2 3 0    LT C 2
PIM1LT C 0 4
MDF1   LTC0
LT C 1 5 1    LT C 1
LT C 2 6 1    LT C 2
PIM2LT C 0 7
MDF2   LTC0
LT C 1 8 2    LT C 1
LT C 2 9 2    LT C 2
PIM3LT C 0 1 0
MDF3   LTC0
LTC1 11 3   LTC1
LTC2 12 3   LTC2
PIM4LT C 0 1 3
MDF4   LTC0
LTC1 14 4   LTC1
LTC2 15 4   LTC2...

Page 98

ND-45492 (E) CHAPTER 3
Page 81
Revision 2.0
2. Cable Running to the External MDF
(1) When not using the cable hole of the PIM
(a) Bring the MDF cable up to the Main Equipment through the cable hole(s) of the BASE.
(b) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the
screws provided, as shown in Figure 006-2.
(c) Pare the sheath of each MDF cable and secure the shield to the front bracket on the PIM using tie
wraps, as shown in Figure 006-2.
Figure 006-2  Cable...

Page 99

CHAPTER 3 ND-45492 (E)
Pag e 8 2
Revision 2.0
(2) When using the cable hole of the PIM
(a) Make the cable hole on the left side of PIM as shown in Figure 006-3.
Figure 006-3  Making Cable Hole on the PIM
(b) Bring the MDF cable up to the PIM0 through the cable hole (s) of the BASE and bring the MDF cable
up to the other PIM through the cable hole (left side) of each PIM.
(c) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the
screws provided, as shwon in Figure...

Page 100

ND-45492 (E) CHAPTER 3
Page 83
Revision 2.0
Figure 006-4  Cable Running to the External MDF (2 of 2)
NAP 200-006
Sheet 5/7
Cable Running to the MDF
LTC CONNECTOR
CHAMP CONNECTOR
FRONT
TO MDF BASE PIM0 PIM1PBXTIE WRAP SHIELDPIMMDF CABLE
25 ~ 30 mm(1.0 ~ 1.2 inch)
TO MDF 
Start reading NEC Neax 2000 Ivs Installation Procedure Manual

Related Manuals for NEC Neax 2000 Ivs Installation Procedure Manual

All NEC manuals