1.3 PROCEDURE FOR UNPLUGGING/PLUGGING CIRCUIT CARDS
When removing a circuit card from the PIM or when mounting a circuit card in the PIM, follow the procedure
given in Table 3-1 below.
Table 3-1  Procedure for Unplugging/Plugging Circuit Cards
CIRCUIT CARDPROCEDURE
CONDITION
PLUG UNPLUG
• SPN-CP00/CP03 (MP)
• PZ-PW86 (PWR)
• SPN-PW00 (PWR)Power off
ß
Plug in
ß
Power onPower off
ß
Unplug
ß
Power onThese circuit cards must be plugged in or unplugged 
only with...

Page 32

ND-45492 (E) CHAPTER 3
Page 15
Revision 2.0
CAUTION
The installer must hold the edge of circuit card when plugging or unplugging the circuit card.  If you touch
another area, you may be exposed to hazardous voltages.
PBX
CARD FRONT
NEVER TOUCH THE COMPONENTS OR 
SOLDERED SURFACE WITH BARE HANDS. 

Page 33

CHAPTER 3 ND-45492 (E)
Pag e 1 6
Revision 2.0
2. PROCEDURE
This section explains the procedures for installing the NEAX2000 IVS system. The installer should follow the
procedure shown in the following flowchart. In the flowchart, a NAP number is denoted to the right side of each
step. The NAP Number refers to the details for each procedure.
Figure 3-2  Procedure Flowchart (1 of 2)
START
UNPACKING
MARKING AND DRILLING
INSTALLATION
OF
MAIN EQUIPMENT
CONNECTION
OF
BATTERY
TERMINATION OF
CABLES ON THE...

Page 34

ND-45492 (E) CHAPTER 3
Page 17
Revision 2.0
Figure 3-2  Procedure Flowchart (2 of 2)
The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When
doing such a procedure, the installer must perform the procedure with caution, to prevent damage caused by stat-
ic electricity (See section 1.2, “Static Electricity Precautions” in this chapter).
A
END MOUNTING
MOUNTING OF THE FRONT COVEROF 
CIRCUIT CARDS
SYSYEM INITIALIZATION
AND
SYSTEM DATA ENTRY
OPERATION...

Page 35

CHAPTER 3 ND-45492 (E)
Pag e 1 8
Revision 2.0
1. Unpacking Procedure
(1) Check the received quantity of packages containing the NEAX2000 IVS system with the description on the
shipping document.
(2) Check the packaging for external damage done by transportation and record it as necessary.
(3) Unpack the packaging.
• For unpacking the packages containing circuit cards, a grounded wrist strap should be worn.
(4) Check the quantity of equipment and materials unpacked with the shipping document.
(5) Perform...

Page 36

ND-45492 (E) CHAPTER 3
Page 19
Revision 2.0
Figure 001-1  Unpacking of Main Equipment
NAP 200-001
Sheet 2/2
Unpacking
RACK PARTS
ACCESSORIES
PIM 

Page 37

CHAPTER 3 ND-45492 (E)
Pag e 2 0
Revision 2.0
1. Confirmation of the Equipment Layout
Install the equipment in an area which provides adequate ventilation and is easily accessible to service person-
nel.
2. Marking
2.1. Floor Standing
• Referring to Figure 002-1, mark the installation holes for the main equipment.
• Mark the installation holes for the external MDF, if required.
Figure 002-1  Floor Marking for Main Equipment
NAP 200-002
Sheet 1/3
Marking and Drilling
356 mm (14.01 inch)
430 mm (16.93...

Page 38

ND-45492 (E) CHAPTER 3
Page 21
Revision 2.0
2.2. Wall Mounting
• Locate and mark the wall mounting points as shown in Figure 002-2.
Figure 002-2  Wall Mounting Points
NAP 200-002
Sheet 2/3
Marking and Drilling
PIM
PIM
PIM
PIM
ANCHOR (x4/PIM)
430 mm 
(16.9 inch)
BASE
250 mm (9.8 inch)
350 mm 
 (13.8 inch)
40 mm (1.6 inch)
 BASE BOTTOM POSITION 
 PBX BOTTOM POSITION 
PIM390 mm 
 (15.4 inch)
430 mm 
(16.9 inch)
5 mm (0.2 inch)
382 mm 
 (15.0 inch)
350 mm 
 (13.8 inch)
350 mm 
 (13.8 inch)
350 mm 
 (13.8...

Page 39

CHAPTER 3 ND-45492 (E)
Pag e 2 2
Revision 2.0
3. Drilling 
• Drilling and installing anchor bolts
Figure 002-3  Instruction for Anchor Bolt
NAP 200-002
Sheet 3/3
Marking and Drilling
(4) (3) (2) (1)
(1) DRILL A HOLE IN THE CONCRETE WITH A  
DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
DEEPER THAN THE PLUG BOLT LENGTH.
(2) INSERT THE ANCHOR BOLT INTO THE HOLE.
(3) PUSH ANCHOR BOLT UNTIL THE 
BOLT STAYS PERMANENTLY IN PLACE.
(4) TURN BOLT COUNTERCLOCKWISE AND 
REMOVE. 

Page 40

ND-45492 (E) CHAPTER 3
Page 23
Revision 2.0
Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
Rack-Mounting or Desk Top installation.
1. Floor Standing Installation
(1) Connect the RACK PARTS to the rear side of the BASE with 4 bolts provided.
Figure 003-1  Connection of RACK PARTS and BASE
NAP 200-003
Sheet 1/37
Installation of Main Equipment
REARBASE RACK PARTS 