Page 31
CHAPTER 3 ND-45492 (E) Pag e 1 4 Revision 2.0 1.3 PROCEDURE FOR UNPLUGGING/PLUGGING CIRCUIT CARDS When removing a circuit card from the PIM or when mounting a circuit card in the PIM, follow the procedure given in Table 3-1 below. Table 3-1 Procedure for Unplugging/Plugging Circuit Cards CIRCUIT CARDPROCEDURE CONDITION PLUG UNPLUG • SPN-CP00/CP03 (MP) • PZ-PW86 (PWR) • SPN-PW00 (PWR)Power off ß Plug in ß Power onPower off ß Unplug ß Power onThese circuit cards must be plugged in or unplugged only with...
Page 32
ND-45492 (E) CHAPTER 3 Page 15 Revision 2.0 CAUTION The installer must hold the edge of circuit card when plugging or unplugging the circuit card. If you touch another area, you may be exposed to hazardous voltages. PBX CARD FRONT NEVER TOUCH THE COMPONENTS OR SOLDERED SURFACE WITH BARE HANDS.
Page 33
CHAPTER 3 ND-45492 (E) Pag e 1 6 Revision 2.0 2. PROCEDURE This section explains the procedures for installing the NEAX2000 IVS system. The installer should follow the procedure shown in the following flowchart. In the flowchart, a NAP number is denoted to the right side of each step. The NAP Number refers to the details for each procedure. Figure 3-2 Procedure Flowchart (1 of 2) START UNPACKING MARKING AND DRILLING INSTALLATION OF MAIN EQUIPMENT CONNECTION OF BATTERY TERMINATION OF CABLES ON THE...
Page 34
ND-45492 (E) CHAPTER 3 Page 17 Revision 2.0 Figure 3-2 Procedure Flowchart (2 of 2) The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When doing such a procedure, the installer must perform the procedure with caution, to prevent damage caused by stat- ic electricity (See section 1.2, “Static Electricity Precautions” in this chapter). A END MOUNTING MOUNTING OF THE FRONT COVEROF CIRCUIT CARDS SYSYEM INITIALIZATION AND SYSTEM DATA ENTRY OPERATION...
Page 35
CHAPTER 3 ND-45492 (E) Pag e 1 8 Revision 2.0 1. Unpacking Procedure (1) Check the received quantity of packages containing the NEAX2000 IVS system with the description on the shipping document. (2) Check the packaging for external damage done by transportation and record it as necessary. (3) Unpack the packaging. • For unpacking the packages containing circuit cards, a grounded wrist strap should be worn. (4) Check the quantity of equipment and materials unpacked with the shipping document. (5) Perform...
Page 36
ND-45492 (E) CHAPTER 3 Page 19 Revision 2.0 Figure 001-1 Unpacking of Main Equipment NAP 200-001 Sheet 2/2 Unpacking RACK PARTS ACCESSORIES PIM
Page 37
CHAPTER 3 ND-45492 (E) Pag e 2 0 Revision 2.0 1. Confirmation of the Equipment Layout Install the equipment in an area which provides adequate ventilation and is easily accessible to service person- nel. 2. Marking 2.1. Floor Standing • Referring to Figure 002-1, mark the installation holes for the main equipment. • Mark the installation holes for the external MDF, if required. Figure 002-1 Floor Marking for Main Equipment NAP 200-002 Sheet 1/3 Marking and Drilling 356 mm (14.01 inch) 430 mm (16.93...
Page 38
ND-45492 (E) CHAPTER 3 Page 21 Revision 2.0 2.2. Wall Mounting • Locate and mark the wall mounting points as shown in Figure 002-2. Figure 002-2 Wall Mounting Points NAP 200-002 Sheet 2/3 Marking and Drilling PIM PIM PIM PIM ANCHOR (x4/PIM) 430 mm (16.9 inch) BASE 250 mm (9.8 inch) 350 mm (13.8 inch) 40 mm (1.6 inch) BASE BOTTOM POSITION PBX BOTTOM POSITION PIM390 mm (15.4 inch) 430 mm (16.9 inch) 5 mm (0.2 inch) 382 mm (15.0 inch) 350 mm (13.8 inch) 350 mm (13.8 inch) 350 mm (13.8...
Page 39
CHAPTER 3 ND-45492 (E) Pag e 2 2 Revision 2.0 3. Drilling • Drilling and installing anchor bolts Figure 002-3 Instruction for Anchor Bolt NAP 200-002 Sheet 3/3 Marking and Drilling (4) (3) (2) (1) (1) DRILL A HOLE IN THE CONCRETE WITH A DRILL SUITABLE FOR A PLUG BOLT A LITTLE DEEPER THAN THE PLUG BOLT LENGTH. (2) INSERT THE ANCHOR BOLT INTO THE HOLE. (3) PUSH ANCHOR BOLT UNTIL THE BOLT STAYS PERMANENTLY IN PLACE. (4) TURN BOLT COUNTERCLOCKWISE AND REMOVE.
Page 40
ND-45492 (E) CHAPTER 3 Page 23 Revision 2.0 Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch Rack-Mounting or Desk Top installation. 1. Floor Standing Installation (1) Connect the RACK PARTS to the rear side of the BASE with 4 bolts provided. Figure 003-1 Connection of RACK PARTS and BASE NAP 200-003 Sheet 1/37 Installation of Main Equipment REARBASE RACK PARTS