Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-9 Upgrade to Release 8si 2 Install TDM/LAN Bus Terminators 1. Verity that the two AHF110 TDM/LAN bus terminators are installed per Figure 2-1 . Figure 2-1. Location of TDM/LAN Bus Terminators Swing Existing System into Maintenance Position 1. While lifting on the left side of the existing cabinet, allow the left side to swing outward and to the right. Check Health of SPE Ty p e...
Page 62
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-10 Upgrade to Release 8si 2 Disable Scheduled Maintenance and Alarm Origination to INADS 1. Type change system-parameters maintenance and press En te r to prevent scheduled daily maintenance from interfering with the update or upgrade. 2. If scheduled maintenance has begun, set the Stop Time field to 1 minute after the current time. or If scheduled maintenance has not begun, set...
Page 63
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-11 Upgrade to Release 8si 2 Check Link Status This optional step is to make sure the settings are the same after the upgrade. 1. Type display communication-interface links and press En t e r. Write down all enabled links. 2. Type status link number and press En t e r for each enabled link. 3. Write down which links are in service. Save Translations 1. Type save translation and...
Page 64
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-12 Upgrade to Release 8si 2 2. Write down all BX.25 links. This information is used in the ‘‘Move Circuit Packs from G3vs System to R8si’’ section. 3. Write down all ISDN links. If you found no ISDN links, go to ‘‘Save Announcements (if necessary)’’. 4. For each link where the Prot field is set to ISDN, record the information in all fields (in case you need to back out of the...
Page 65
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-13 Upgrade to Release 8si 2 Save Announcements (if necessary) NOTE: The TN750C Announcement circuit pack stores announcements in nonvolatile memory; saving the announcements is optional. 1. If the PPN contains a TN750/B Announcement circuit pack, type display announcements and press En t e r. 2. If administered recorded announcements are listed, type save announcements cabinet...
Page 66
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-14 Upgrade to Release 8si 2 Shut Down DEFINITY AUDIX System !WA R N I N G : Neglecting to shut down the AUDIX assembly before powering down the system cabinet where it resides can damage the AUDIX disk. 1. Shut down the AUDIX assembly and allow the disk to completely spin down. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 1-26 . Power Down Existing System !CAUTION:...
Page 67
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-15 Upgrade to Release 8si 2 Figure 2-2. Rear of G3vs System Cabinet Remove Ground Connections 1. Remove the 6 AWG (#40) (16 mm2) ground wire from the ground block on the rear of the G3vs system. This wire later attaches to the new control cabinet. 2. Remove the 10 AWG (#25) (6 mm 2) Coupled Bonding Conductor (CBC) wire from the ground block on the rear of the G3vs system. This...
Page 68
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-16 Upgrade to Release 8si 2 Move 25-Pair Cables from G3vs System to R8si 1. Remove any reusable 25-pair cables from the rear of the G3vs system. NOTE: The distance from the wall-mount G3vs system and the Release 8si system may require that all cables be replaced with longer cables. 2. Attach any reusable 25-pair cables to the required connectors on the rear of the Release 8si...
Page 69
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-17 Upgrade to Release 8si 2 NOTE: A TN2182 Tone-Cloc k c an rep lac e the TN756 Tone-Detec tor/ Generator. If a TN2182 is used , a TN748B Tone-Detec tor is not req uired . 5. Install the port circuit packs into the control cabinet. Since the new control cabinet has more port slots than the G3vs cabinet, there should not be a need to retranslate these circuit packs. 6. Install...
Page 70
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Upgrading R5vs/R6vs to R8si 2-18 Upgrade to Release 8si 2 Connect Control Cabinet Power and Ground 1. Connect a 6 AWG (#40) (16 mm2) wire (previously used on the G3vs cabinet) from the single-point ground block on the control cabinet to the approved ground. See Figure 2-3 . Figure 2-3. Typical AC Power and Ground Layout 2. Connect a 10 AWG (#25) (6 mm 2) wire (previously used on the G3vs cabinet) between...