Page 61

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-9 Upgrade to Release 8si 
2
Install TDM/LAN Bus Terminators
1. Verity that the two AHF110 TDM/LAN bus terminators are installed per 
Figure 2-1
.
Figure 2-1. Location of TDM/LAN Bus Terminators
Swing Existing System into Maintenance Position
1. While lifting on the left side of the existing cabinet, allow the left side to 
swing outward and to the right.
Check Health of SPE
Ty p e...

Page 62

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-10 Upgrade to Release 8si 
2
Disable Scheduled Maintenance and Alarm 
Origination to INADS
1. Type change system-parameters maintenance and press En te r to prevent 
scheduled daily maintenance from interfering with the update or upgrade.
2. If scheduled maintenance has begun, set the Stop Time field to 1 minute 
after the current time.
or
If scheduled maintenance has not begun, set...

Page 63

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-11 Upgrade to Release 8si 
2
Check Link Status
This optional step is to make sure the settings are the same after the upgrade.
1. Type display communication-interface links and press 
En t e r. Write down 
all enabled links.
2. Type status link 
number and press En t e r for each enabled link.
3. Write down which links are in service. 
Save Translations 
1. Type save translation and...

Page 64

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-12 Upgrade to Release 8si 
2
2. Write down all BX.25 links. This information is used in the ‘‘Move Circuit 
Packs from G3vs System to R8si’’ section. 
3. Write down all ISDN links. If you found no ISDN links, go to ‘‘Save 
Announcements (if necessary)’’.
4. For each link where the Prot field is set to ISDN, record the information in 
all fields (in case you need to back out of the...

Page 65

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-13 Upgrade to Release 8si 
2
Save Announcements (if necessary)
NOTE:
The TN750C Announcement circuit pack stores announcements in 
nonvolatile memory; saving the announcements is optional.
1. If the PPN contains a TN750/B Announcement circuit pack, type display 
announcements and press 
En t e r.
2. If administered recorded announcements are listed, type save 
announcements 
cabinet...

Page 66

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-14 Upgrade to Release 8si 
2
Shut Down DEFINITY AUDIX System
!WA R N I N G :
Neglecting to shut down the AUDIX assembly before powering down the system 
cabinet where it resides can damage the AUDIX disk.
1. Shut down the AUDIX assembly and allow the disk to completely spin 
down. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 1-26
.
Power Down Existing System
!CAUTION:...

Page 67

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-15 Upgrade to Release 8si 
2
Figure 2-2. Rear of G3vs System Cabinet
Remove Ground Connections
1. Remove the 6 AWG (#40) (16 mm2) ground wire from the ground block on 
the rear of the G3vs system. This wire later attaches to the new control 
cabinet.
2. Remove the 10 AWG (#25) (6 mm
2) Coupled Bonding Conductor (CBC) 
wire from the ground block on the rear of the G3vs system. This...

Page 68

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-16 Upgrade to Release 8si 
2
Move 25-Pair Cables from G3vs System to R8si 
1. Remove any reusable 25-pair cables from the rear of the G3vs system. 
NOTE:
The distance from the wall-mount G3vs system and the Release 8si 
system may require that all cables be replaced with longer cables.
2. Attach any reusable 25-pair cables to the required connectors on the rear 
of the Release 8si...

Page 69

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-17 Upgrade to Release 8si 
2
NOTE:
A TN2182 Tone-Cloc k c an rep lac e the TN756 Tone-Detec tor/ 
Generator. If a TN2182 is used , a TN748B Tone-Detec tor is not 
req uired .
5. Install the port circuit packs into the control cabinet. Since the new control 
cabinet has more port slots than the G3vs cabinet, there should not be a 
need to retranslate these circuit packs.
6. Install...

Page 70

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Upgrading R5vs/R6vs to R8si 
2-18 Upgrade to Release 8si 
2
Connect Control Cabinet Power and Ground
1. Connect a 6 AWG (#40) (16 mm2) wire (previously used on the G3vs 
cabinet) from the single-point ground block on the control cabinet to the 
approved ground. See Figure 2-3
. 
Figure 2-3. Typical AC Power and Ground Layout 
2. Connect a 10 AWG (#25) (6 mm
2) wire (previously used on the G3vs 
cabinet) between...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals