Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 161

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-27 Add ISDN — PRI 
6
Add ISDN — PRI
North American
1. Install a TN767E (or later) DS1 or a TN464F DS1/E1 circuit pack for a 
signaling link and up to 23 ISDN — PRI Trunk Group members. 
2. Install a Tone-Clock circuit pack to provide synchronization for the DS1 
circuit pack. 
If using a TN464F, then packet bus support has not been added, requiring more 
than 8 PRI signaling groups...

Page 162

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-28 Add Packet Bus Support 
6
Add Circuit Packs
1. Determine port assignment of circuit packs to be added.
2. Install the DS1 Interface circuit pack in the assigned carrier slot.
3. Remove an existing TN756 Tone Detector/Generator circuit pack and 
install the TN768, TN780, TN2182B, or TN419B Tone-Clock circuit pack in 
assigned carrier slots, if required.
4. Install a Tone Detector...

Page 163

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-29 Add Packet Bus Support 
6
Disable Alarm Origination
1. Type change system-parameters maintenance and press En te r. 
2. Set the Alarm Origination Activated field to n.
!CAUTION:
If you do not disable Alarm Origination, the system may generate 
alarms, resulting in unnecessary trouble tickets. 
3. For some releases of software, disable Cleared Alarm Notification 
and Restart...

Page 164

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-30 Add Packet Bus Support 
6
Install Circuit Packs
1. Install the appropriate circuit packs. See Table 6-4.
Power Up System
1. At the EPN, set the main circuit breaker to ON.
2. At the PPN, set the main circuit breaker to ON.
3. The system performs a level 4 reboot, loading the system translations from 
the translation cards. Rebooting takes about 10 minutes.
4. After all trouble is...

Page 165

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-31 Add Packet Bus Support 
6
Enable Customer Options and Alarm Origination
1. Get the DOSS order number of the upgrade from the project manager and 
ask the regional Customer Software Administration to complete the steps 
in the shaded box. See ‘‘Where to Call for Technical Support’’ on page -xx
 
for telephone numbers.
NOTE:
As part of the system registration process, the INADS...

Page 166

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-32 Add CallVisor ASAI 
6
Add CallVisor ASAI
Service Interruption
1. If adding the packet bus support and TN570s must be installed as part of 
that support, then adding CallVisor ASAI requires a service interruption. 
Notify the customer in advance as to when the addition will take place. See 
‘‘Add Packet Bus Support’’ on page 6-28
 for further information.
Enter Added Translations...

Page 167

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-33 Add DCS Interface 
6
Install Cables
1. Install cables from TN464F to the MDF as required.
Enter Added Translations
1. Administer the required translation data using the forms listed under 
“Adjunct/Switch Applications Interface (ASAI)” in 
DEFINITY Enterprise 
Communications Server Release 8 Administrator’s Guide
.
Resolve Alarms
1. Examine the alarm log. Resolve any alarms that...

Page 168

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-34 Add DCS Interface 
6
For further information about DCS, refer to the following documents:
nAT&T System 75/85 Network and Data Services Reference Manual
nSystem 75 Application Notes Network Services
nDEFINITY ECS Release 8 Administration for Network Connectivity
Add Circuit Packs
A TN464C, TN767C, TN722, or TN760 DS1 circuit pack is required for PPP 
connections. A TN799 C-LAN...

Page 169

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-35 Add DCS Interface 
6
Figure 6-14. Cable Connection for C-LAN
Figure Notes
1. 259A Connector
2. DW8 Cable3. Hub or 110 (purple) wall field
Table 6-5. TN799 Pinout
Backplane Pin 25-Pair Wire Color Lead NamePeripheral 
Connector Pin
103 White/Orange TD+ 27
003 Orange/White TD- 2
104 White/Green RD+ 28
004 Green/White RD- 3
1
2
3cydflan2  EWS 101398 

Page 170

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-36 Add ISDN—BRI 
6
Enter Added Translations
1. Get the DOSS order number of the upgrade. Call the regional CSA to 
perform the steps in this section.
2. To enable DCS, set the DCS field on the System Parameters-Customer 
Options form to y.
3. Administer the other required translation data using the forms listed under 
Distributed Communications System (DCS) in 
DEFINITY...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals