Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 181
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-7 Digital Tie Trunk Example 5 Digital Tie Trunk Example This example shows how to connect digital tie trunk wiring from one DEFINITY System to another DEFINITY System. See Figure 5-6 . Figure 5-6. Digital Tie Trunk Wiring 1. Install c ross-c onnec t jump ers to c onnec t the named pins from the d igital trunk c irc uit pac k to ap p rop riate p...
Page 182
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-8 DS1 Tie Trunk Example 5 The following cables can be used to connect DS1 tie trunk circuit packs to DS1 digital facilities: nC6C connector cable (comcode 104307327) — 50-foot (15.24 m) shielded cable equipped with a 50-pin male connector on 1 end and a 15-pin male connector on the other end. Use this cable to connect a DS1 tie trunk circuit...
Page 183
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-9 DS1 Tie Trunk Example 5 Contact your Lucent Technologies representative for maximum cabling distances. Figure 5-7. Typical Connections to Channel Service Unit Figure Notes 1. To TN722B DS1 Tie Trunk Circ uit Pa c k 2. C6C Cab le (For Distanc es Over 50 Feet (15.24 m), Use C6E Cab les) 3. CSU or ICSU (3150 Shown) 4. T (Tip)5. R (Ring ) 6. T1...
Page 184
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-10 Auxiliary Connector Outputs 5 Auxiliary Connector Outputs The control carrier output cable pinouts are shown in Table 5-2. The control carrier AUX connector outputs include the following: nAlarm monitoring for the auxiliary cabinet. nSeven -48 VDC power sources for emergency transfer units. nThree -48 VDC power sources for remotely powering 3...
Page 185
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-11 Auxiliary Connector Outputs 5 BK-BL BL-BK36 11-48 GNDEmerg ency Tr an sf e r Rel a y Po w e r ¯ BK-O O-BK37 12-48 GND BK-G G-BK38 13-48 GND BK-BR BR-BK39 14-48 GND BK-S S- BK40 15-48 GND Y- B L BL-Y41 16-48 GND Y- O O-Y42 17-48 GND Y- G G-Y43 18Not Connec ted Y- BR BR-Y44 19GND -48AUX Power Y- S S- Y45 20GND -48 V- B L BL-V46 21GND -48 V- O...
Page 186
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-12 Three-Pair and Four-Pair Modularity 5 Table 5-3 provides port circuit pack and telephone pin designations. Three-Pair and Four-Pair Modularity Figure 5-8 shows 3-pair and 4-pair modularity from the por t circuit pack to the terminal pins at the information outlet (modular jack). Most terminals connect to an information outlet installed at the...
Page 187
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-13 Adjunct Power Connections 5 Make the connections from the port circuit pack to the modular jacks. Then, plug the terminal into the modular jack. Figure 5-8. 3-Pair and 4-Pair Modularity Adjunct Power Connections Figure 5-9 shows 3 typical connection locations for adjunct power. Adjunct power for station equipment may be supplied from the...
Page 188
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-14 Adjunct Power Connections 5 Figure 5-9. Example Adjunct Power Connections For Figure 5-9 , the following example is used: a. If 25 telep hones c onnec t to the system and all 25 telep hones need ad junc t p ower, install the ad junc t p ower sup p ly in the eq uip ment room. b . If only 10 of the telep hones need ad junc t power, install the...
Page 189
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-15 Adjunct Power Connections 5 Local and Phantom Power A console ’s maximum distance from the system is limited. See Ta b l e 5 - 4. Auxiliary Power !CAUTION: Do not use the 329A p ower unit for the attend ant c onsole. The non-essential functions of an attendant console and its optional selector console derive their power from an auxiliary...
Page 190
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Wire Telephones and Other Equipment 5-16 Attendant Console 5 Attendant Console 1. Install the attend ant c onsole and c onnec t the mod ular c ord to the information outlet. 2. Install lab els p er the attend ant c onsole form and disp lay mod ule form assig nments. 3. Install a Digital Line c irc uit p ac k in the assig ned c arrier slot (if an ad d itional c irc uit p ac k is...