Home > GE > Medical Equipment > GE Logiq 7 Service Manual

GE Logiq 7 Service Manual

Here you can view all the pages of manual GE Logiq 7 Service Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.

Page 201

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
Section 6-8 - Jumper and Dip Switch Setting 6-39
6-8-2 Jumper Setting
6-8-2-1 HDD
Always set the jumper between MASTER pins.
6-8-3 Printer Dip Switch Setting
6-8-3-1 Mitsubishi MD-3000 VCR Dip Switch SettingThis section describes Mitsubishi MD-3000 VCR communication setting.  Field Service Engineer (FSE) 
is not allowed to modify dip switch setting.  Following setting is documented for purpose of 
troubleshooting by FSE. Figure 6-50...

Page 202

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
6-40Section 6-8 - Jumper and Dip Switch Setting
6-8-3-2 Accessing Dip Switch Module for inspection
1.) Remove the two screws of RS232C board plate.
2.) Remove the RS232C board from the VCR to access the dip switch. Figure 6-52   Opening Board Plate
Figure 6-53   Removing Board
Screws
RS232C board plate
Dip Switch RS232C Board 

Page 203

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
Section 6-8 - Jumper and Dip Switch Setting 6-41
6-8-3-3 CP30D Dip Switch Setting
This section describes CP30D Dip Switch setting.  Field Service Engineer (FSE) is not allowed to modify 
dip switch setting.  Following setting is documented for purpose of troubleshooting by FSE.
NOTICE
D
Do NOT change the DIP SW setting!!
Figure 6-54   CP30D Dip Switch (All OFF)
1  2  3  4  5  6  7  8 
ON 
OFF  

Page 204

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
6-42Section 6-8 - Jumper and Dip Switch Setting 

Page 205

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
Section 7-1 - Overview 7-1
Chapter 7
Diagnostics/Troubleshooting
Section 7-1
Overview
7-1-1 Purpose of Chapter 7
This section describes how to setup and run the tools and software that help maintain image quality and 
system operation. Very basic host, system and board level diagnostics are run whenever power is 
applied. Some Service Tools may be run at the application level. However most software tests are 
required.
Table 7-1...

Page 206

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
7-2Section 7-1 - Overview
7-1-2 Diagnostic Procedure Summary
Although Diagnostics can be run in any order, the  Bottom-up Confidence-Building Order outlined in this 
section:
- Provides a framework from which overall diagnostic testability can be discussed.
- Provides a top-level model that describes the confidence-building aspect of the diagnostics.
- Provides a logical step-by-step approach to system check-out and fault isolation....

Page 207

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
Section 8-1 - Overview 8-1
Chapter 8
Replacement Procedures
Section 8-1
Overview
8-1-1 Purpose of Chapter 8
This chapter describes replacement procedures for the following modules and subsystems.
8-1-2 Returning/Shipping Probes and Repair Parts
Equipment being returned must be clean and free of blood and other infectious substances.
GEMS policy states that body fluids must be properly removed from any part or equipment prior to...

Page 208

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
8-2Section 8-1 - Overview
This page was intentionally left blank. 

Page 209

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later) 8-3
Section 8-2
Software Loading Procedures for BT09 (R8.x.x or later)
8-2-1 General
This describes software loading procedures for BT09 System with BEP4 only.  For the consoles 
upgraded BT09 systems (contains BEP3 inside), follow procedure in Section 8-7 Software Loading 
Procedures (R7.5.x or later).
Also, do not attempt to apply this procedure if you are upgrading...

Page 210

GE HEALTHCARE
DIRECTION 2286865, REVISION 14LOGIQ™ 7 SERVICE MANUAL
8-4Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
8-2-4 Software Loading Work-flow and Check-list
This check sheet is prepared to assist a FE during software loading.
Customer NameCustomer Contact 
Console #Unit ID
Unit Type
SectionItemCheck ParameterResult
5-2-2-2
BT09_SV_BEP4
Configuration Varia-
tionosCheck current system version before ghost/application
loadingShould be R8.x.x or laterVer.
8-2-6-1 - Disabling...
Start reading GE Logiq 7 Service Manual

Related Manuals for GE Logiq 7 Service Manual

All GE manuals