Yamaha Waverunner 3 Manual
Have a look at the manual Yamaha Waverunner 3 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
3-24 E INSP ADJ ELECTRICAL 1. Remove: Bands Battery negative lead 1 Battery positive lead 2 Battery Battery breather hose 3 WARNING When removing the battery, disconnect the negative lead first. Remove the battery to prevent acid loss during turning the machine on its side for the impeller service. 2 3 1 2. Inspect: Electrolyte level Low → Add distilled water. The electrolyte level should be between the upper a and lower b level marks. CAUTION: Use only distilled water. Other types of water contain minerals which are harmful to batteries.Filling steps: Remove each filler cap. Add distilled water. When the electrolyte level reaches the upper level mark, allow the cell to stand for 20 minutes. If the electrolyte level drops, add more distilled water so the level reaches the upper level mark.
3-25 E INSP ADJ ELECTRICAL 3. Inspect: Specific gravity Out of specification → Charge. 4. Install: Filler caps CAUTION: Before installation, rinse off any fluid from the battery box and battery and make sure that the battery is dry before installing it. Specific gravity at 20 °C (68 °F): 1.28 Charging current: 1.9 amps × 10 hrs 5. Install: Battery breather hose 1 Battery Battery positive lead 2 Battery negative lead 3 Bands CAUTION: Connect the positive lead to the battery terminal first. Make sure the battery leads are con- nected properly. Reversing the leads can seriously damage the electrical system. Make sure that the battery breather hose is properly connected and is not obstructed. Coat the terminals with a water resistant grease to minimize terminal corrosion. 2 1 3
3-26 E INSP ADJ JET PUMP UNIT JET PUMP UNIT Impeller inspection 1. Check: Impeller 1 Damage/wear → Replace. Nicks/scratches → File or grind. 2. Measure: Impeller-to-housing clearancea Out of specification → Replace. Max. impeller-to-housing clearance: 0.6 mm (0.0236 in) Measurement steps: Remove the battery leads. Remove the intake grate and intake duct. Refer to “INTAKE GRATE, RIDE PLATE, AND INTAKE DUCT” in Chapter 6. Measure the clearance at each impeller blade as shown (a total of three measure- ments). Install the intake duct and intake grate. Refer to “INTAKE GRATE, RIDE PLATE, AND INTAKE DUCT” in Chapter 6. Install the battery leads.
3-27 E INSP ADJ JET PUMP UNIT/BILGE PUMP Water inlet strainer inspection 1. Inspect: Water inlet strainer Contaminants → Clean. Cracks/damage → Replace. Inspection steps: Remove the ride plate. Refer to “INTAKE GRATE, RIDE PLATE, AND INTAKE DUCT” in Chapter 6. Remove the rubber plate. Refer to “JET PUMP UNIT” in Chapter 6. Remove the water inlet cover 1 . Inspect the water inlet strainer mesh a . Install the water inlet cover. Install the rubber plate. Refer to “JET PUMP UNIT” in Chapter 6. Install the ride plate. Refer to “INTAKE GRATE, RIDE PLATE, AND INTAKE DUCT” in Chapter 6. BILGE PUMP Bilge strainer inspection 1. Inspect: Bilge strainer Contaminants → Clean. Cracks/damage → Replace. Inspection steps: Remove the deck beam. Refer to “SEATS AND HAND GRIP” in Chapter 8. Remove the coupling cover. Disconnect the bilge strainer 1 from the bilge strainer holder. Inspect the bilge strainer. Install the coupling cover. Install the deck beam. Refer to “SEATS AND HAND GRIP” in Chapter 8. 1
3-28 E INSP ADJ BILGE PUMP/GENERAL Electric bilge pump strainer inspection 1. Inspect: Cap Strainer Contaminants → Clean. Inspection steps: Remove the band 1 . Remove the cap 2 and strainer 3 . Inspect the cap and strainer. Install the strainer and cap. Install the band. 1 3 2 GENERAL Drain plug inspection 1. Inspect: Drain plugs Cracks/damage → Replace. O-rings Cracks/wear → Replace. Screw threads Contaminants → Clean.
3-29 E INSP ADJ GENERAL Lubrication points 1. Lubricate: Throttle cable (handlebar end) NOTE: Before lubricating the throttle cable, squeeze the throttle lever and remove the rubber seal 1 . 2. Lubricate: Throttle cable (throttle body end) Recommended lubricant: Rust inhibitor Recommended lubricant: Yamaha marine grease, Yamaha grease A (Water resistant grease) 3. Lubricate: QSTS control cables (handlebar end) NOTE: Before lubricating the QSTS control cables, remove the QSTS cable housing cover. Spray the rust inhibitor into the outer cables, and apply grease to the inner cables. Recommended lubricant: Yamaha marine grease, Yamaha grease A (Water resistant grease) 4. Lubricate: QSTS cables (pulley end) Recommended grease: Yamaha marine grease, Yamaha grease A (Water resistant grease)
3-30 E INSP ADJ GENERAL 5. Lubricate: Nozzle pivot shaft Steering cable (nozzle end) QSTS cable (nozzle end) Recommended grease: Yamaha marine grease, Yamaha grease A (Water resistant grease) 6. Lubricate: Steering cable Steering cable joint Shift cable Shift cable joint NOTE: Disconnect the joints and apply a small amount of grease. Recommended grease: Yamaha marine grease, Yamaha grease A (Water resistant grease)
3-31 E INSP ADJ GENERAL 7. Fill: Intermediate housing NOTE: Fill the intermediate housing with the recom- mended grease through the grease nipple 1 . Recommended grease: Yamaha marine grease, Yamaha grease A (Water resistant grease) Grease quantity: Initial 10 hours: 33.0–35.0 cm 3 (1.11–1.18 oz) Every 100 hours or 12 months: 6.0–8.0 cm 3 (0.20–0.27 oz) 1
EFUEL 1 2 3 4 5 6 7 8 9 CHAPTER 4 FUEL SYSTEM FUEL TANK AND FUEL PUMP MODULE...................................................... 4-1 EXPLODED DIAGRAM ............................................................................. 4-1 REMOVAL AND INSTALLATION CHART ................................................ 4-1 SERVICE POINTS .................................................................................... 4-4 Fuel hose disconnection ..................................................................... 4-4 Fuel pump module removal................................................................. 4-4 Fuel sender disassembly .................................................................... 4-4 Check valve inspection ....................................................................... 4-5 Rollover valve inspection .................................................................... 4-5 Fuel level sender inspection................................................................ 4-5 Fuel tank inspection ............................................................................ 4-5 Fuel hose inspection ........................................................................... 4-5 Fuel pump filter inspection .................................................................. 4-6 Fuel strainer inspection ....................................................................... 4-6 Fuel pump module installation ............................................................ 4-6 Fuel hose connect ............................................................................... 4-6 FUEL INJECTION SYSTEM ............................................................................ 4-7 EXPLODED DIAGRAM ............................................................................. 4-7 REMOVAL AND INSTALLATION CHART ................................................ 4-7 SERVICE POINTS .................................................................................. 4-16 Hose clamps removal........................................................................ 4-16 Hose clamps installation ................................................................... 4-16 Fuel hose disconnection ................................................................... 4-16 Fuel line inspection ........................................................................... 4-17 Fuel hose installation (replacing with new fuel hose) ........................ 4-18 Fuel hose connection ........................................................................ 4-18 Throttle body removal ....................................................................... 4-18 Fuel injector inspection ..................................................................... 4-19 Throttle body inspection .................................................................... 4-19 Throttle body installation ................................................................... 4-20 Throttle bodies synchronization ........................................................ 4-21 Fuel pressure measurement ............................................................. 4-26
4-1 EFUELFUEL TANK AND FUEL PUMP MODULE FUEL TANK AND FUEL PUMP MODULE EXPLODED DIAGRAM REMOVAL AND INSTALLATION CHART Step Procedure/Part name Q’ty Service points FUEL TANK REMOVAL Follow the left “Step” for removal. Service lid 1 Refer to “FRONT HOOD” in Chapter 8. Service lid 2 Ventilation hose From ventilation fitting Engine unit Refer to “ENGINE UNIT” in Chapter 5. NOTE: When removing the pump module only, it is not necessary to remove the engine unit. 1 Rollover valve 1 2 Fuel tank breather hose 2 3 Check valve 1 1.3 N • m (0.13 kgf • m, 0.9 ft • Ib) 8 × 18 mm 16 N • m (1.6 kgf • m, 11 ft • Ib) 5.9 N • m (0.59 kgf • m, 4.3 ft • Ib) 4.2 N • m (0.42 kgf • m, 3.0 ft • Ib) 17 18 163 2 2 17 10 9 4 5 118 19 20 22 23 2114 12 14 LT 572 LT 572 LT 572 LT 572 2nd 6.4 N • m (0.64 kgf • m, 4.6 ft • Ib) 1st 3.2 N • m (0.32 kgf • m, 2.3 ft • Ib) 15 136