Home > Yamaha > WaveRunner VXS Owners Manual > Yamaha Waverunner 3 Manual

Yamaha Waverunner 3 Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Yamaha Waverunner 3 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 426
    							8-4
    E
    HULL
    HOODHANDLEBAR
    EXPLODED DIAGRAM
    REMOVAL AND INSTALLATION CHART
    Step Procedure/Part name Q’ty Service points
    HANDLEBAR DISASSEMBLY
    Follow the left “Step” for disassembly.
    1Bolt 2
    2 Grip end 2
    3 Spacer 1
    4 Screw/spring washer/washer 1/1/1
    5 QSTS grip assembly 1
    6 Special nut 1
    7Screw 2
    NOTE:
    Tighten the screw from the engine stop
    switch side. 
    						
    							8-5
    E
    HULL
    HOODHANDLEBAR
    EXPLODED DIAGRAM
    Step Procedure/Part name Q’ty Service points
    8 Handlebar switch assembly 1
    9Screw 2
    10 Throttle lever assembly 1
    11 Handlebar grip 1
    NOTE:
    Apply adhesive to the handlebar and the
    inner surface of the handlebar grip.
    12 Handlebar 1
    Reverse the disassembly steps for 
    assembly. 
    						
    							8-6
    E
    HULL
    HOODHANDLEBAR
    SERVICE POINTS
    Handlebar inspection
    1. Inspect:
    Handlebar
    Bends/cracks/damage →
     Replace.
    Handlebar switch inspection
    Refer to “STARTING SYSTEM” in
    Chapter 7.
    Handlebar assembly installation
    1. Install:
    Bands 1
     
    NOTE:
    After inserting the QSTS cables, buzzer lead,
    handlebar switch lead and throttle cable into
    the grommets, tie the end of grommets with
    the bands.
    2. Install:
    Upper handlebar holder 1
     
    NOTE:
    Align the punch marks a
     on the handlebar
    with the top surface of the handlebar holder.
    The upper handlebar holder should be
    installed with the punch mark b
     facing for-
    ward.
    CAUTION:
    Clearance 
    c should be narrower than
    clearance 
    d.
    Reference clearance:
    c: 1.5 mm (0.06 in)
    d: 3.5 mm (0.14 in) 
    						
    							8-7
    E
    HULL
    HOODHANDLEBAR
    3. Install:
    Throttle cable
    NOTE:
    Fit the seal into the groove in the bracket.
    4. Adjust:
    QSTS cable length a
     
    NOTE:
    Before adjusting the QSTS cables, set the
    trim grip to the neutral position.
    Adjust the QSTS cable lengths a
     to the
    specified length and be sure to take up any
    slack.
    QSTS cable length:
    72 
    ± 0.5 mm (2.83 
    ± 0.02 in)
    5. Install:
    Handlebar cover 1
     
    NOTE:
    When the handlebar cover is in contact with
    the steering boss cover, adjust the handlebar
    mount angle so that the clearance a
     and b
    are equal.
    6. Adjust:
    Throttle cable free play
    Refer to “CONTROL SYSTEM” in Chap-
    ter 3.
    7. Adjust:
    QSTS cable
    Refer to “CONTROL SYSTEM” in Chap-
    ter 3. 
    						
    							8-8
    E
    HULL
    HOODQSTS GRIP
    QSTS GRIP
    EXPLODED DIAGRAM
    REMOVAL AND INSTALLATION CHART
    Step Procedure/Part name Q’ty Service points
    QSTS GRIP DISASSEMBLY
    Follow the left “Step” for disassembly.
    QSTS grip assembly Refer to “HANDLEBAR”.
    1 Screw/washer 1/1
    2 Cover 1
    3Ball 2
    4Spring 2
    5 QSTS cable 1 1
    6 QSTS cable 2  1 with white tape a
      
    						
    							8-9
    E
    HULL
    HOODQSTS GRIP
    EXPLODED DIAGRAM
    Step Procedure/Part name Q’ty Service points
    7 Screw/washer 2/2
    8 Spacer 1
    9 QSTS shift lock lever 1
    10 Spring 1
    11 Spacer 1
    12 Cable housing 1
    13 QSTS grip 1
    Reverse the disassembly steps for 
    assembly. 
    						
    							8-10
    E
    HULL
    HOODQSTS GRIP
    SERVICE POINTS
    QSTS cable inspection
    1. Inspect:
    QSTS cables
    Frays/kinks/rough movement →
     
    Replace.
    QSTS grip inspection
    1. Inspect:
    QSTS grip
    Damage/wear →
     Replace. 
    						
    							8-11
    E
    HULL
    HOODSTEERING MASTER
    STEERING MASTER
    EXPLODED DIAGRAM
    REMOVAL AND INSTALLATION CHART
    Step Procedure/Part name Q’ty Service points
    STEERING MASTER REMOVAL
    Follow the left “Step” for removal.
    Steering console cover Refer to “STEERING CONSOLE COVER”.
    Steering cable end Refer to “REMOTE CONTROL CABLES 
    AND SPEED SENSOR LEAD”.
    1 Bolt/washer 1/1
    2 Steering arm 1
    3 Nut/washer 4/4
    4 Steering master assembly 1
    5Bolt 4
    Reverse the removal steps for installation. 
    						
    							8-12
    E
    HULL
    HOODSTEERING MASTER
    EXPLODED DIAGRAM
    REMOVAL AND INSTALLATION CHART
    Step Procedure/Part name Q’ty Service points
    STEERING MASTER 
    DISASSEMBLYFollow the left “Step” for disassembly.
    1 Bolt/washer 2/2
    2Stay 1
    3Spring 1
    4 Bolt/washer 6/6
    5 Lower housing 1
    6Spring 1
    7 Bushing 1
    8 Bushing 1
    9 Upper housing 1
    10 Tilt lever 1 
    						
    							8-13
    E
    HULL
    HOODSTEERING MASTER
    EXPLODED DIAGRAM
    Step Procedure/Part name Q’ty Service points
    11 Tilt stopper 1
    12 Bolt/nut/holder 4/4/4
    13 Retainer 2
    14 Steering shaft assembly 1
    15 Steering tube 1
    16 Bolt/washer/spring washer 2/2/2
    17 Cap 1
    18 Shaft 1 1
    19 Cross piece 1
    Reverse the disassembly steps for 
    assembly. 
    						
    All Yamaha manuals Comments (0)