Yamaha Waverunner 3 Manual
Have a look at the manual Yamaha Waverunner 3 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
4-22 EFUELFUEL INJECTION SYSTEM c. Turn synchronizing screw #1 3 clock- wise approximately 7 times until it starts to contact the lever. NOTE: Butterfly valve #1 should be fully closed. Butterfly valves #2 and #3 open if the screw is turned more than 7 times. If butterfly valves #1, #2, and #3 are not fully closed, close the valves by adjusting synchronizing screw #1 3 . d. Turn synchronizing screw #3 5 clock- wise approximately 7 times until it starts to contact the lever. NOTE: Butterfly valve #4 should be fully closed. Butterfly valves #1, #2, and #3 open if the screw is turned more than 7 times. If all butterfly valves are not fully closed, close the valves by adjusting synchroniz- ing screw #3 5 . e. Check that all butterfly valves are fully closed and that they open simulta- neously. NOTE: If all butterfly valves are not fully closed, close the valves by repeating steps a–d. f. Turn the throttle stop screw 2 clockwise approximately 1.5 times until it starts to contact the throttle lever. g. Remove the plugs 6 . h. Install the carburetor synchronizer 7 or vacuum gauge 8 . Carburetor synchronizer: YU-08030 Vacuum gauge: 90890-03094 6 #1#2#3#4 7 È 8 É
4-23 EFUELFUEL INJECTION SYSTEM NOTE: For best results, use a vacuum gauge (commercially obtainable), like 9 or 0 shown in the illustration, that has four adapters. ÈFor USA and Canada ÉFor worldwide i. Install the throttle bodies. NOTE: Adjust the throttle body synchronization with the air filter case uninstalled. j. Connect the fuel hose and clamp. k. Connect the Yamaha Diagnostic Sys- tem. l. Remove the sub wire harness from the air filter case, and then connect it to the throttle bodies and main wire harness. m. Connect the test harness (3 pin) to the throttle position sensor A . Test harness (3 pins): YB-06793/90890-06793 n. To start the ECM normally, start the Yamaha Diagnostic System. CAUTION: If the Yamaha Diagnostic System and ECU are started, fuel can spurt out. Be sure to connect the fuel hoses and throt- tle bodies when adjusting the throttle position sensor. NOTE: Use the test connector B to start the ECU normally only if the Yamaha Diagnostic System is not available. Test connector: YW-06862/90890-06862 o. Measure the throttle position sensor out- put voltage (DC). Adjust the throttle posi- tion sensor A position if out of specification. 0 9 A B/O P B
4-24 EFUELFUEL INJECTION SYSTEM Throttle position sensor output voltage: Pink (P) – Black/Orange (B/O) 0.8 ± 0.1 V NOTE: To decrease the output voltage, turn the throttle position sensor clockwise. Slightly tighten the throttle position screw. p. Start the engine and let it run at trolling speed for 20 minutes. NOTE: Warm the engine up in the water. While checking the engine temperature with the Yamaha Diagnostic System, warm the engine up until the engine tem- perature is 50 °C (122 °F). q. Adjust the throttle stop screw 2 until trolling speed is within specification. Trolling speed: Season TemperatureSpecified engine speed Summer30 °C (86 °F) or more1,650 r/min Winter10 °C (50 °F) or less1,720 r/min Spring/ Fall20 °C (68 °F) 1,680 r/min r. Adjust each cylinder to the cylinder dif- ferences shown in the table using syn- chronizing screws 3 –5 and using cylinder #2 as the standard. 0 5 10 15 20 25 30 35 40 45 50 1,740 1,720 1,700 1,680 1,660 1,640 1,620 1,600 ˚C r/min
4-25 EFUEL 3. Remove: • Throttle bodies Air filter case 4. Remove: Carburetor synchronizer or vacuum gauge 5. Install: Plugs 6. Install: Air filter case Throttle bodies Vacuum pressure at trolling speed: CylinderCylinder differenceExample #1–30 ± 10 mmHg (–4.00 ± 1.33 kPa, –1.2 ± 0.4 inHg)–210 ± 10 mmHg (–27.99 ± 1.33 kPa, –8.3 ± 0.4 inHg) #2 Standard*0–180 mmHg (–23.99 kPa, –7.1 inHg) #30 ± 10 mmHg (0 ± 1.33 kPa, 0 ± 0.4 inHg)–180 ± 10 mmHg (–23.99 ± 1.33 kPa, –7.1 ± 0.4 inHg) #4–20 ± 10 mmHg (–2.67 ± 1.33 kPa, –0.8 ± 0.4 inHg)–200 ± 10 mmHg (–26.66 ± 1.33 kPa, –7.8 ± 0.4 inHg) Standard*: When setting the specified engine speed, the value is zero. NOTE: Always maintain the specified trolling speed when making this adjustment. s. Measure the throttle position sensor out- put voltage. Adjust the throttle position sensor A position if out of specification. Throttle position sensor output voltage: Pink (P) – Black/Orange (B/O) 0.760 ± 0.016 V FUEL INJECTION SYSTEM
4-26 EFUELFUEL INJECTION SYSTEM Fuel pressure measurement 1. Disconnect: Fuel hose Refer to “Fuel hose disconnection”. 2. Install: Fuel pressure gauge adapter 1 Fuel pressure gauge 2 NOTE: To connect the fuel pressure gauge adapter, follow the procedures for connecting a fuel hose. (Refer to “Fuel hose connection”.) 3. Start the engine and arrow it to warm up for several minutes. 4. Measure: Fuel pressure Out of specification → Replace the fuel pump module. 5. Remove: Fuel pressure gauge Fuel pressure gauge adapter NOTE: To disconnect the fuel pressure gauge adapter, follow the procedures for disconnect- ing a fuel hose. (Refer to “Fuel hose discon- nection”.) 6. Connect: Fuel hose Refer to “Fuel hose connection”. Fuel pressure gauge adapter: YW-06842/90890-06842 Fuel pressure gauge: YB-06766/90890-06786 Fuel pressure: 310–330 kPa (3.1–3.3 kgf/cm 2, 45–47 psi) 1 2
EPOWR CHAPTER 5 POWER UNIT ENGINE UNIT .................................................................................................. 5-1 EXPLODED DIAGRAM ............................................................................. 5-1 REMOVAL AND INSTALLATION CHART ................................................ 5-1 SERVICE POINTS .................................................................................... 5-4 Compression pressure measurement ................................................. 5-4 Oil filter removal and installation ......................................................... 5-6 Engine unit removal ............................................................................ 5-6 Shim removal ...................................................................................... 5-7 Engine mount inspection ..................................................................... 5-7 Coupling clearance inspection ............................................................ 5-7 EXHAUST PIPE 3 ............................................................................................ 5-8 EXPLODED DIAGRAM ............................................................................. 5-8 REMOVAL AND INSTALLATION CHART ................................................ 5-8 EXHAUST PIPES 1 AND 2............................................................................ 5-11 EXPLODED DIAGRAM ........................................................................... 5-11 REMOVAL AND INSTALLATION CHART .............................................. 5-11 EXHAUST MANIFOLD .................................................................................. 5-13 EXPLODED DIAGRAM ........................................................................... 5-13 REMOVAL AND INSTALLATION CHART .............................................. 5-13 OIL TANK ...................................................................................................... 5-15 EXPLODED DIAGRAM ........................................................................... 5-15 REMOVAL AND INSTALLATION CHART .............................................. 5-15 SERVICE POINTS .................................................................................. 5-22 Oil tank removal ................................................................................ 5-22 Oil strainer inspection........................................................................ 5-23 Oil tank installation ............................................................................ 5-23
EPOWR 1 2 3 4 5 6 7 8 9 OIL PUMP ...................................................................................................... 5-26 EXPLODED DIAGRAM ........................................................................... 5-26 REMOVAL AND INSTALLATION CHART .............................................. 5-26 SERVICE POINTS .................................................................................. 5-27 Oil pump removal .............................................................................. 5-27 Oil pump inspection........................................................................... 5-27 Oil strainer inspection........................................................................ 5-27 Oil pump installation .......................................................................... 5-28 REDUCTION DRIVE GEAR .......................................................................... 5-29 EXPLODED DIAGRAM ........................................................................... 5-29 REMOVAL AND INSTALLATION CHART .............................................. 5-29 SERVICE POINTS .................................................................................. 5-34 Drive coupling removal...................................................................... 5-34 Drive shaft removal ........................................................................... 5-34 Oil pump driven gear inspection........................................................ 5-34 Relief valve inspection ...................................................................... 5-34 Drive shaft installing .......................................................................... 5-35 Drive coupling installation ................................................................. 5-35 GENERATOR AND STARTER MOTOR ....................................................... 5-36 EXPLODED DIAGRAM ........................................................................... 5-36 REMOVAL AND INSTALLATION CHART ............................................. 5-36 SERVICE POINTS .................................................................................. 5-41 Flywheel magneto removal ............................................................... 5-41 Starter clutch inspection .................................................................... 5-41 Flywheel magneto installation ........................................................... 5-43 CAMSHAFTS................................................................................................. 5-44 EXPLODED DIAGRAM ........................................................................... 5-44 REMOVAL AND INSTALLATION CHART .............................................. 5-44 SERVICE POINTS .................................................................................. 5-49 Camshaft removal ............................................................................. 5-49 Camshaft inspection.......................................................................... 5-50 Camshaft sprockets inspection ......................................................... 5-52 Timing chain tensioner inspection ..................................................... 5-52 Camshaft installation ......................................................................... 5-53
EPOWR CYLINDER HEAD.......................................................................................... 5-57 EXPLODED DIAGRAM ........................................................................... 5-57 REMOVAL AND INSTALLATION CHART ............................................. 5-57 SERVICE POINTS .................................................................................. 5-59 Cylinder head removal ...................................................................... 5-59 Cylinder head inspection ................................................................... 5-59 Cylinder head installation .................................................................. 5-60 VALVES AND VALVE SPRINGS .................................................................. 5-62 EXPLODED DIAGRAM ........................................................................... 5-62 REMOVAL AND INSTALLATION CHART ............................................. 5-62 SERVICE POINTS .................................................................................. 5-64 Valve removal ................................................................................... 5-64 Valve spring inspection ..................................................................... 5-65 Valve inspection ................................................................................ 5-65 Valve guide inspection ...................................................................... 5-66 Valve guide replacement................................................................... 5-67 Valve seat inspection ........................................................................ 5-69 Valve seat reface .............................................................................. 5-70 Valve installation ............................................................................... 5-72 CRANKCASE ................................................................................................ 5-74 EXPLODED DIAGRAM ........................................................................... 5-74 REMOVAL AND INSTALLATION CHART .............................................. 5-74 SERVICE POINTS .................................................................................. 5-79 Crankcase disassembly .................................................................... 5-79 Crankcase inspection ........................................................................ 5-80 Timing chain inspection..................................................................... 5-80 Crankcase assembly ......................................................................... 5-80 CONNECTING RODS AND PISTONS .......................................................... 5-84 EXPLODED DIAGRAM ........................................................................... 5-84 REMOVAL AND INSTALLATION CHART .............................................. 5-84 SERVICE POINTS .................................................................................. 5-86 Connecting rod and piston removal .................................................. 5-86 Cylinder and piston inspection .......................................................... 5-87 Piston ring inspection ........................................................................ 5-88 Piston pin inspection ......................................................................... 5-89 Connecting rod inspection................................................................. 5-91 Connecting rod and piston installation .............................................. 5-93
EPOWR CRANKSHAFT .............................................................................................. 5-97 EXPLODED DIAGRAM ........................................................................... 5-97 REMOVAL AND INSTALLATION CHART .............................................. 5-97 SERVICE POINTS .................................................................................. 5-98 Crankshaft removal ........................................................................... 5-98 Crankshaft inspection........................................................................ 5-98 Crankshaft installation ..................................................................... 5-101 THERMOSTAT ............................................................................................ 5-102 EXPLODED DIAGRAM ......................................................................... 5-102 REMOVAL AND INSTALLATION CHART ............................................ 5-102 SERVICE POINTS ................................................................................ 5-104 Thermostat inspection ..................................................................... 5-104 Thermostat installation .................................................................... 5-104 PRESSURE CONTROL VALVE.................................................................. 5-105 EXPLODED DIAGRAM ......................................................................... 5-105 REMOVAL AND INSTALLATION CHART ............................................ 5-105 SERVICE POINTS ................................................................................ 5-109 Pressure control valve inspection ................................................... 5-109
5-1 EPOWRENGINE UNIT ENGINE UNIT EXPLODED DIAGRAM REMOVAL AND INSTALLATION CHART Step Procedure/Part name Q’ty Service points ENGINE UNIT REMOVAL Follow the left “Step” for removal. Engine oil Drain. Refer to “POWER UNIT” in Chapter 3. Service lid 1 Refer to “FRONT HOOD” in Chapter 8. Battery negative and positive lead Refer to “ELECTRICAL BOX AND IGNITION COIL BOX” in Chapter 7. Throttle cable and fuel hose Refer to “FUEL INJECTION SYSTEM” in Chapter 4. Water lock and exhaust joint Refer to “EXHAUST SYSTEM” in Chapter 8. 1 Oil filter 1 2Bolt 4 4 1011 12 6 3 7 2 8 1 9 5 9 14 91315 LT 271 LTLT 572 LT 7.8 N • m (0.78 kgf • m, 5.6 ft • Ib) 6 × 25 mm 8 × 28 mm 17 N • m (1.7 kgf • m, 12 ft • Ib) 17 N • m (1.7 kgf • m, 12 ft • Ib) 8 × 40 mm 17 N • m (1.7 kgf • m, 12 ft • Ib) LT 572 LT