Yamaha Waverunner 3 Manual
Have a look at the manual Yamaha Waverunner 3 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
5-42 EPOWRGENERATOR AND STARTER MOTOR 2. Check: Starter clutch 1 Starter gear 2 Burrs/chips/roughness/wear → Replace the defective part(s). 3. Check: Starter clutch gear’s contacting surfaces a Damage/pitting/wear → Replace the starter clutch gear. 12 a 4. Check: Starter clutch operation Checking steps: Install the starter gear 1 onto the starter clutch 2 and hold the starter clutch. When turning the starter gear clockwise È, it should turn freely, otherwise the starter clutch is faulty and must be replaced. When turning the starter gear counter- clockwise É, the starter clutch and the starter gear should engage, otherwise the starter clutch is faulty and must be replaced.
5-43 EPOWRGENERATOR AND STARTER MOTOR Flywheel magneto installation 1. Install: Woodruff key Flywheel magneto Washer Flywheel magneto bolt NOTE: Clean the tapered portion of the crankshaft and the flywheel magneto hub. When installing the flywheel magneto, make sure the woodruff key is properly seated in the keyway of the crankshaft. Lubricate the flywheel magneto bolt and washer with engine oil. 2. Tighten: Flywheel magneto bolt 1 NOTE: While holding the flywheel magneto 2 with the sheave holder 3, tighten the flywheel mag- neto bolt. CAUTION: Do not reuse the flywheel magnet bolt and washer, always replace them with new ones. T R.. Flywheel magneto bolt: 75 N m (7.5 kgf m, 54 ft lb) Sheave holder: YS-01880-A/90890-01701
5-44 EPOWRCAMSHAFTS CAMSHAFTS EXPLODED DIAGRAM REMOVAL AND INSTALLATION CHART Step Procedure/Part name Q’ty Service points CYLINDER HEAD COVER REMOVALFollow the left “Step” for removal. Air filter case Refer to “FUEL INJECTION SYSTEM” in Chapter 4. 1 Spark plug 4 2 Clamp/breather hose 1/1È To oil tank White mark a 3Bolt 1 4 Camshaft position sensor 1 5 Clamp/cooling water hose 1/1É To thermostat 6 Rubber seal 1 E 2 4 3 5 6 8 9 10 117 LT 572 LT LT 572 LT 12 14 13 1 13 N m (1.3 kgf m, 9.4 ft Ib) 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 16 mm 6 × 16 mm 2nd 7.6 N m (0.76 kgf m, 5.5 ft Ib) 1st 3.7 N m (0.37 kgf m, 2.7 ft Ib) 12 N m (1.2 kgf m, 8.7 ft Ib) 6 × 22 mm aÈ É
5-45 EPOWRCAMSHAFTS EXPLODED DIAGRAM Step Procedure/Part name Q’ty Service points 7Bolt 1 8 Cooling water pipe 1 9 O-ring 1 10 Bolt 6 11 Rubber mount 6 12 Cylinder head cover 1 13 Cylinder head cover gasket 1 14 Timing chain guide (top side) 1 Reverse the removal steps for installation. E 2 4 3 5 6 8 9 10 117 LT 572 LT LT 572 LT 12 14 13 1 13 N m (1.3 kgf m, 9.4 ft Ib) 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 16 mm 6 × 16 mm 2nd 7.6 N m (0.76 kgf m, 5.5 ft Ib) 1st 3.7 N m (0.37 kgf m, 2.7 ft Ib) 12 N m (1.2 kgf m, 8.7 ft Ib) 6 × 22 mm aÈ É Not reusable Not reusable
5-46 EPOWRCAMSHAFTS EXPLODED DIAGRAM REMOVAL AND INSTALLATION CHART Step Procedure/Part name Q’ty Service points CAMSHAFT REMOVALFollow the left “Step” for removal. Cylinder head cover Reduction drive gear case Refer to “REDUCTION DRIVE GEAR”. NOTE: When removing camshafts it is not neces- sary to remove the reduction drive gear case. 1 Cap bolt 1 2Gasket 1 3Bolt 2 4 Timing chain tensioner 1 E EE E E E M M 10 11 10 11 10 11 121617 8 18 8 8 13 9 14 7 15 620 19 1 2 3 4 5 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 25 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 8 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm Not reusable
5-47 EPOWRCAMSHAFTS EXPLODED DIAGRAM Step Procedure/Part name Q’ty Service points 5 Timing chain tensioner gasket 1 6 Timing chain guide (exhaust side) 1 7Bolt 18 8 Intake camshaft cap 3 9 Dowel pin 6 NOTE: During removal, the dowel pins may still be connected to the camshaft caps. 10 Bolt 10 11 Exhaust camshaft cap 3 12 Dowel pin 6 13 Intake camshaft 1 14 Bolt 2 15 Intake camshaft sprocket 1 E EE E E E M M 10 11 10 11 10 11 121617 8 18 8 8 13 9 14 7 15 620 19 1 2 3 4 5 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 25 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 8 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm Not reusable
5-48 EPOWRCAMSHAFTS EXPLODED DIAGRAM Step Procedure/Part name Q’ty Service points 16 Exhaust camshaft 1 17 Bolt 2 18 Exhaust camshaft sprocket 1 19 Pin 1 20 Timing chain guide (intake side) 1 Reverse the removal steps for installation. E EE E E E M M 10 11 10 11 10 11 121617 8 18 8 8 13 9 14 7 15 620 19 1 2 3 4 5 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 35 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 25 mm 10 N m (1.0 kgf m, 7.2 ft Ib) 6 × 8 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm 24 N m (2.4 kgf m, 17 ft Ib) 7 × 11 mm
5-49 EPOWRCAMSHAFTS SERVICE POINTS Camshaft removal 1. Install: Dial gauge needle Dial gauge stand 1 (into spark plug hole #1) Dial gauge 2 Dial gauge stand: 90890-06583 Dial gauge needle: 90890-06584 Dial gauge stand set: YW-06585/90890-06585 Dial gauge: YU-03097/90890-01252 2 1 2. Turn the drive coupling counterclockwise, and then check if cylinder #1 is at TDC of the compression stroke with a dial gauge. NOTE: TDC on the compression stroke can be found when the camshaft lobes are turned away from each other. INEX 3. Make an alignment mark a on the timing chain and camshaft sprockets. a
5-50 EPOWRCAMSHAFTS 4. Remove: Timing chain tensioner 1 Gasket 1 5. Remove: Camshaft caps Dowel pins NOTE: Loosen the intake and exhaust camshaft cap bolts in the sequence shown. 1 10 7 6 3 2 14 18 15 11 4 10 7 52 8 9 4 5 1 12 16 17 13 6 8 9 3 6. Remove: Intake camshaft 1 Exhaust camshaft 2 NOTE: To prevent the timing chain from falling into the crankcase, fasten it with a wire 3. Camshaft inspection 1. Check: Camshaft lobes Blue discoloration/pitting/scratches → Replace the camshaft. 2. Measure: Camshaft lobe dimensions a and b Out of specification → Replace the cam- shaft. Minimum cam lobe dimensions: Intake camshaft: a 32.25 mm (1.270 in) b 25.00 mm (0.984 in) Exhaust camshaft: a 32.65 mm (1.285 in) b 25.00 mm (0.984 in)
5-51 EPOWRCAMSHAFTS 3. Measure: Camshaft runout Out of specification → Replace. Maximum camshaft runout: 0.03 mm (0.0012 in) 4. Measure: Camshaft-journal-to-camshaft-cap clearance Out of specification → Measure the camshaft journal diameter. Camshaft-journal-to-camshaft- cap clearance: 0.05–0.08 mm (0.0020–0.0031 in) Measurement steps: Install the camshaft into the cylinder head (without the dowel pins and camshaft caps). Position a strip of Plastigauge ® 1 onto the camshaft journal as shown. Install the dowel pins and camshaft caps. NOTE: Tighten the intake and exhaust camshaft cap bolts in the sequence shown. Do not turn the camshaft when measuring the camshaft journal-to-camshaft cap clearance with the Plastigauge®. T R.. Camshaft cap bolt: 10 N m (1.0 kgf m, 7.2 ft lb) Remove the camshaft caps and then measure the width of the Plastigauge ® 1. 10 1 4 5 8 17 5 1 4 8 15 9 12 149 3 2 7 6 18 7 3 2 6 13 11 10 16