Page 171
DK424 Installation Cabinet Floor Mounting Strata DK I&M 5/995-21 DK424 Installation Cabinet Floor Mounting One or Two Cabinets 1. Remove front, side, and top covers from cabinet(s) (Figure 5-2). Remove plastic locating parts from all cabinet back covers using a Phillips screwdriver (Figure 5-6). 2. Make sure that cabinet power supplies (RPSU280) are installed per “Power Supply Installation” on Page 5-8. 3. If installing just one cabinet, install the RFMF fixtures on each side of the bottom of the...
Page 172
DK424 Installation Cabinet Floor Mounting 5-22Strata DK I&M 5/99 7. For systems with just three cabinets, secure the floor fixtures (already attached to the bottom cabinet) to the floor with the customer-provided floor bolts. 8. Refer to the following sub-sections and anchor the system to concrete, wood, or computer room floor. After completing those steps, proceed to Step 12. For systems with four or more cabinets, skip this step and proceed to Step 9. 9. Add remaining cabinets, making sure that...
Page 173
DK424 Installation Cabinet Floor Mounting Strata DK I&M 5/995-23 DK424 Installation Important! lRFMF1A (two-each) and RWBF1A (six-each) are supplied with the floor installation kit RFIF lUpper and third cabinets must be fixed to the wall with RWBFS on each side (use #12 x 1.25 wood screws and wall anchors, as required) lFloor fixture (RFMF) must be fixed to floor by either anchor bolts, or wall by RWBF wall brackets (see Figures 5-14 and 5-15). A BFront (2) Mouting Screws Provided with RFIF Kit Top...
Page 174
DK424 Installation Cabinet Floor Mounting 5-24Strata DK I&M 5/99 Note RWBF1A (3-pairs) and RFMF1A (1-pair) are supplied with floor installation kit RFIF. Customer- supplied anchor bolts (each side)RWBF RFMFRFMF RFMF RFMF AB ABAB A AAB AB AB ABAB AB AB AB AB RWBF RWBF RWBF RWBF RWBF “A” Front two screws left and right sides “B” Back two screws left and right sides RWBFs are used on left and right sides, wherever indicated RFMFs are used on left and right sides,...
Page 175
DK424 Installation Cabinet Floor Mounting Strata DK I&M 5/995-25 DK424 Installation Bolt Cabinets to a Concrete Floor 1. Mount the DK424 Base Cabinet on Floor Mount Fixtures (see Figures 5-13 and 5-16). 2. Position the Base Cabinet at the selected installation location. 3. Mark the floor where holes will be drilled. Move the Base Cabinet prior to drilling. NoteCover the Base Cabinet with a drop cloth to protect the power equipment from dust created during drilling. 4. Use a hammer drill to make holes...
Page 176
DK424 Installation Cabinet Floor Mounting 5-26Strata DK I&M 5/99 Bolt Cabinets to a Computer Room Floor 1. Mount the DK424 Base Cabinet on Floor Mount Fixtures (RFMF). See Figures 5-13 and 5-18. 2. Position the Base Cabinet at the selected installation location. 3. Mark the floor where holes will be drilled. Move the Base Cabinet prior to drilling. NoteCover the Base Cabinet with a drop cloth to protect the power equipment from dust created during drilling. 4. Drill holes through tile for 3/8-inch...
Page 177
DK424 Installation Cabinet Floor Mounting Strata DK I&M 5/995-27 DK424 Installation Mount Cabinets to Computer Room Floor (Unbolted) 1. Make sure that cabinet power supplies (RPSU280) are installed per “Power Supply Installation” on Page 5-8. 2. Remove front, side, and top covers from all cabinets (Figure 5-2). NoteAs shown in Figure 5-18, the two screws on each side cover and the three screws on the front cover (the bottom left screw must be completely removed) should only be loosened and the...
Page 178
DK424 Installation AC Power and Grounding Requirements 5-28Strata DK I&M 5/99 10. Install ground wiring, AC and reserve power cabling, and PCB cabling per the “Recommended Installation Sequence” on Page 5-7. 11. Fill out cabinet/slot identification labels on each cabinet (see Figure 5-11), then reinstall covers on the cabinets. (The top cover should be installed on the top cabinet.) Cabinet Removal – Floor-Mounted Systems This procedure is written on the presumption that the Base Cabinet is the...
Page 179
DK424 Installation AC Power and Grounding Requirements Strata DK I&M 5/995-29 DK424 Installation AC Power and Third Wire Ground Test Test each “third wire ground” separately for continuity by either measuring the resistance between the third prong terminal (earth ground) and a metal cold water pipe (maximum: 1 ohm) or by using a commercially available earth ground indicator. If neither procedure is possible, perform the following procedure. ä To test each “third wire ground” for continuity 1. Obtain...
Page 180
DK424 Installation AC Power Cabling Installation 5-30Strata DK I&M 5/99 A to B: 1 volt maximum then A to B: 1 ohm maximum Intercabinet Ground Connect intercabinet ground wires (supplied with each cabinet) between cabinets in systems with two or more cabinets (Figures 5-21 and 5-22). AC Power Cabling Installation The system requires an input power source of 50/60 cycles, 115VAC ± 10 VAC, and up to 17.5 amps AC to operate. AC power cabling requirements vary, depending on the method of cabinet...