Toshiba Estudio 230 Manual
Here you can view all the pages of manual Toshiba Estudio 230 Manual. The Toshiba manuals for Printer are available online for free. You can easily download all the documents as PDF.
Page 401
June 2004 © TOSHIBA TECe-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM) 4 - 1 4 4. PREVENTIVE MAINTENANCE (PM) 4.1 PM Support Mode 4.1.1 General description The timing for the parts replacement usually depend s on the number of output pages ever printed after they were replaced before. However, the life span o f them changes depending on the general use of users and the environment in which the equipment is placed. Therefore, it is necessary to consider not only the number of output...
Page 402
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)June 2004 © TOSHIBA TEC 4 - 2 [ 2 ] Operational screen 1) Main screen Fig. 4-2 Notes: “—” is always displayed at the drive counts sectio n for the reversing automatic document feeder (RADF) and feed unit. The paper source differs depending on the structur e of options, however, “0.0k” is displayed in “OUTPUT PAGES (k)” and its standard number of ou tput pages is displayed in “PM OUT- PUT PAGES (k)” even for the installed paper source....
Page 403
June 2004 © TOSHIBA TECe-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM) 4 - 3 4 2) Sub screen Fig. 4-3 Displaying of the sub unit (parts) name Back to the main screen Clearing of the chosen sub unit (parts) counters Displaying of the present number of output pages co unts (x 1,000) “*” is displayed next to the present number when th e number of output pages counts has exceeded its PM standard number. Displaying of the standard number of output pages c ounts (x 1,000) to replace the sub...
Page 404
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)June 2004 © TOSHIBA TEC 4 - 4 3) Clear screen Fig. 4-4 When the [INITIALIZE] button is pressed, “Present n umber of output pages counts” and “Present driving counts” are cleared and “Previous replacement date” is updated. 1 1
Page 405
June 2004 © TOSHIBA TECe-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM) 4 - 5 4 [ 3 ] LCD screen display list Note: Note: The name inside [ ] is displayed on the LCD screen. Main screen Sub-screen Drum/cleaner unit [CLEANER/DRUM] Drum [DRUM] Drum cleaning blade [DRUM BLADE] Main charger grid [GRID] Needle electrode [NEEDLE ELECTRODE] Separation finger for drum [SEPARATION FINGER (DRUM )] Recovery blade [RECOVERY BLADE] Developer unit [DEVELOPER] Developer [DEVELOPER] Transfer/separation...
Page 406
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)June 2004 © TOSHIBA TEC 4 - 6 4.1.3 Work flow of parts replacement The timing for the parts replacement usually depend s on the number of output pages ever made after they were replaced before. However, its drive count s time is also to be considered when replacing the parts. Even if the number of output pages has reach ed the level of replacement, for instance, the part may still be usable with its drive counts not reachi ng the specified...
Page 407
June 2004 © TOSHIBA TECe-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM) 4 - 7 4 4.2 General Descriptions for PM Procedure Perform the preventive maintenance in the following timing. e-STUDIO200L/202L: every 6,400 sheets e-STUDIO230/232: every 74,000 sheets e-STUDIO280/282: every 90,000 sheets (1) Preparation Ask the user about the current conditions of the e quipment and note them down. Before starting maintenance, make some sample copi es and store them. See the replacement record...
Page 408
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)June 2004 © TOSHIBA TEC 4 - 8 4.3 Operational Items in Overhauling Overhaul each equipment with the following timing. e-STUDIO200L/202L: When the number of output pages h as reached 193,000 or 2.5 years have passed from the start of use (Whichever is earlier) e-STUDIO230/232: When the number of output pages has reached 222,000 or 2.5 years have passed from the start of use (Whichever is earlier) e-STUDIO280/282: When the number of output...
Page 409
June 2004 © TOSHIBA TECe-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM) 4 - 9 4 4.4 Preventive Maintenance Checklist Symbols used in the checklist Cleaning Lubrication Replacement Operation check Date A Clean with alcohol Clean with soft pad, cloth or vacuum cleaner L Launa 40 The number of sheets consumed before replacement (Value x 1,000)Replace if deformed or damaged After cleaning or replacement, confirm there is no problem. User name Coating Serial No. SI Silicon...
Page 410
e-STUDIO200L/202L/230/232/280/282 PREVENTIVE MAINTENANCE (PM)June 2004 © TOSHIBA TEC 4 - 10 [Preventive Maintenance Checklist] Notes: Perform cleaning and lubricating in the following timing. Lubricate the replacement parts according to the replacement cycle. e-STUDIO200L/202L: every 64,000 sheets e-STUDIO230/232: every 74,000 sheets e-STUDIO280/282: every 90,000 sheets Values under “Replacement” indicate the replacement cycle for the e-STUDIO200L/ e-STUDIO230/e-STUDIO280 or...