Nortel Modular Ics 6.0 Installer Guide
Here you can view all the pages of manual Nortel Modular Ics 6.0 Installer Guide. The Nortel manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 531
Tests / 531 P0992638 03Modular ICS 6. 0 Installer Guide Operating a Continuity loopback testInstaller password required You start the Continuity loopback test by pressing the button on the front of the DTI. Calls on all lines on the cartridge are automatically dropped when a loopback test is invoked. The red LED above the button remains on until the test is canceled. Invoking a Continuity loopback test automatically cancels any other test in progress. To stop the continuity loopback test, press...
Page 532
532 / Tests Modular ICS 6.0 Installer GuideP0992638 03 Operating a payload loopback testInstaller password required Start with the display showing Loopback tests:. 15. Press ≠. Show Module: displays. 16. Enter a module number or press LIST to scroll through modules. Cards on KSU or Card on Mod X displays. 17. If you want to test cartridges on another module, press ‘ until the display shows the module. 18. Press ≠. Cd1-KSU or Cd1-ModX displays. If you want to test the second cartridge on the KSU, press...
Page 533
CSU stats / 533 P0992638 03Modular ICS 6. 0 Installer Guide CSU stats Each DTI is equipped with an internal channel service unit (CSU). When enabled, the internal CSU monitors the quality of the received T1 signal and provides performance statistics and diagnostic information. DTIs must be individually programmed to establish parameters for collecting and measuring transmission performance statistics by the CSU. Statistics Installer password required The CSU provides both performance and alarm...
Page 534
534 / CSU stats Modular ICS 6.0 Installer GuideP0992638 03 any defects that occurred in the last minute — loss of signal LOS, out of frame OOF, alarm indication signal AIS the number of milliseconds of short term alarms in the last minute — loss of signal LOS, out of frame OOF, alarm indication signal AIS, remote alarm indication RAI. A shortterm alarm is declared when the detected defects persist for tens of milliseconds. A carrier failure alarm (CFA) is a duration of carrier system outage. CFA...
Page 535
CSU stats / 535 P0992638 03Modular ICS 6. 0 Installer Guide 4. Press TIMER. The display shows the date and time that the system began collecting statistics. 5. Press ‘. Performnce stats displays. 6. Press ≠ to view the performance stats. Current interval displays. 7. Press ≠ to display the duration of the current interval. OR Press ‘ until the display shows the type of interval statistics you want to check. Options are: 15 min intervals for intervals in the last 24 hours, numbered from the most...
Page 536
536 / CSU stats Modular ICS 6.0 Installer GuideP0992638 03 Checking the CSU alarmsInstaller password required To check the CSU alarms, start with Performnce stats. 1. Press ‘. Alarm stats displays. 2. Press ≠. Active alarms displays. Checking active alarms Installer password required Start with the display showing Active alarms. 1. Press ≠. The display shows the first active alarm or no active alarms. 2. Press ‘ or “ to cycle through the complete list of active alarms. 3. Press – to return to Active...
Page 537
CSU stats / 537 P0992638 03Modular ICS 6. 0 Installer Guide Checking bipolar violationsInstaller password required Start with Active alarms. 1. Press ‘ until you find Bipolar violatn. 2. Press ≠. The display shows the number of bipolar violations that occurred in the last minute. Checking short term alarms Installer password required Start with Active alarms. 1. Press ‘ until you find ShortTerm alarms. 2. Press ≠. The display shows the first type of shortterm alarm and the number of milliseconds, not...
Page 538
538 / CSU stats Modular ICS 6.0 Installer GuideP0992638 03 Resetting all statisticsInstaller password required Start with the display showing Alarm stats: 1. Press ‘. Stats log displays. 2. Press ≠. Reset stats? displays. 3. Press YES to erase all the current statistics and begin collecting statistics again.
Page 539
Diagnostic tools / 539 P0992638 03Modular ICS 6. 0 Installer Guide Diagnostic tools The command under this heading allows you to perform a warm restart on your system. 1. At the Diagnostic prompt, press ≠. Restart system? displays. 2. If you are sure you want to perform a warm start on your system, press YES . Otherwise, press CANCEL.
Page 540
540 / Link Status Modular ICS 6.0 Installer GuideP0992638 03 Link Status Fractional PRI When you purchase PRI from your service provider, you can request the number of B-channels that are allocated for you to use. For example, you may want to use only 12 B-channels instead of 23 B-channels. If this is your situation, you should disable all the B-channels that you do not need. It is recommended that the number of lines that are deprovisioned on a DTI card (configured as PRI) be the same as the...