Home > NEC > Communications System > NEC Neax 2400 Ipx Fusion Network System Manual

NEC Neax 2400 Ipx Fusion Network System Manual

Here you can view all the pages of manual NEC Neax 2400 Ipx Fusion Network System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 61

CHAPTER 4 NDA-24299
Page 46
Revision 1.0
INSTALLATION
Connecting Cables
4.2 Connecting 10 BASE-T Cables
Figure 4-11 shows sample cable connections, where HUB (PA-M96) cards are provided in a dual
configuration and the FCH (PA-FCHA) card is located in PIM 1 (1-IMG system/IMG0). When HUB cards
are provided in a dual configuration, the two HUB cards must be connected on each front edge connector
with a 10 BASE-T cross cable. However, when dual LANIs (LANI-A and LANI-B) are used for each CPU,
the cross cable...

Page 62

NDA-24299 CHAPTER 4
Page 47
Revision 1.0
INSTALLATION
Connecting Cables
4.3 10 BASE-T Connection Procedure
The pattern for 10 BASE-T cable connections may vary, depending on the system configuration (such as
the number of IMG stacks or the mounting location/number of the FCH/HUB cards, etc.). According to
your system configuration, connect necessary Ethernet cables:
4.3.1 Procedure for 1-IMG System
If your system is 1-IMG type, the 10 BASE-T connection should use either of the following cables:
1. Cable...

Page 63

CHAPTER 4 NDA-24299
Page 48
Revision 1.0
INSTALLATION
Connecting Cables
4.3.3 When not using the cable unit SR1201 ETIF CAU-n
When your system doesn’t use the cable unit classified as SR1201 ETIF CAU-n, perform the 10 BASE-
T connections as instructed below:
1. Depending on your system configuration, connect the 10 BASE-T straight cable(s) between the
HUB (PA-M96) and LANI (PZ-PC19) cards. Use the cable UTP CTG5 ST CA-O, which must be
provided by the user.
When a single LANI is used for each CPR (Slot 00...

Page 64

NDA-24299 CHAPTER 4
Page 49
Revision 1.0
INSTALLATION
Connecting Cables
When dual LANIs are used in both Slot 00 and 03 of CPR#0/CPR#1, be sure to use at least two
HUB cards as separate 10 BASE-T connection terminals. Use one HUB for the internal LANI
(LANI-A: in Slot 00 of each CPR), and use the other for the external LANI (LANI-B in Slot 03 of
each CPR).
2. When the HUB is in a dual configuration, connect the 10 BASE-T cross cable between the HUB
cards. Use the following cables, which are provided by...

Page 65

CHAPTER 4 NDA-24299
Page 50
Revision 1.0
INSTALLATION
Connecting Cables
When dual FCH is provided for the HUB dedicated to each internal LANI card (LANI-A: in Slot
00 of each CPR), connect FCH#0 to HUB#0 and FCH#1 to HUB#1.
When your system also uses the external LANI cards (LANI-B in Slot 03 of each CPR), prepare
another set of FCH cards for the HUB dedicated to the external LANI cards. Then, if the FCH is in
dual configuration, connect one FCH to the HUB for No. 0 system of the external LANI, and the...

Page 66

NDA-24299 CHAPTER 4
Page 51
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-13 shows some typical examples where 10 BASE-T cables are connected to the FCH card(s) mounted
in PIM0 of 1-IMG system, under the conditions in Table 4-6:
Table 4-6 Connection of 10 BASE-T Cables to FCH Card(s) in PIM0 of 1-IMG
Note 1:
Cables Contained in each cable unit are as follows:
SR1201 ETIF CAU-A: UTP CTG5 ST CA-D, UTP CTG5 ST CA-J
SR1201 ETIF CAU-DA: UTP CTG5 ST CA-D, UTP CTG5 ST CA-J, UTP CTG5 CRS CA-F
Note 2:The...

Page 67

CHAPTER 4 NDA-24299
Page 52
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-13   Examples of Ethernet Cable Connection-FCH in PIM0 (1-IMG System) (2/2)
ATTENTIONContents
Static S ensitive
Handling
Precautions Required
06 04 05 03 02 01 0006 04 05 03 02 01 00
CN
CN
CNCN
HUB
CN
CNHUB
BASEU
PIM 1
PIM 2
PIM 3
UTP CTG5 ST CA-J
PIM 0
LPMTOPU
FANU
BSCM
CN
FC H
CN
UTP CTG5 ST CA-J
FCH
CNCN
UTP CTG5 ST CA-D
< F C H  in P IM 0  (P attern 3)>   < F C H  in P IM 0 (P a ttern  4)>  
06 04 05 03 02 01 00
06 04 05...

Page 68

NDA-24299 CHAPTER 4
Page 53
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-14 shows some typical examples where 10 BASE-T cables are connected to the FCH card(s) mounted
in PIM1 of 1-IMG system, under the conditions in Table 4-7:
Table 4-7 Connection of 10 BASE-T Cables to FCH Card(s) in PIM1 of 1-IMG
Note 1:
Cables contained in each cable unit are as follows:
SR1201 ETIF CAU-B: UTP CTG5 ST CA-K, UTP CTG5 ST CA-J
SR1201 ETIF CAU-DB: UTP CTG5 ST CA-I, UTP CTG5 ST CA-J, UTP CTG5 CRS CA-F
Note 2:The...

Page 69

CHAPTER 4 NDA-24299
Page 54
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-15 shows some typical examples where 10 BASE-T cables are connected to the FCH card(s) mounted
in PIM2 of 1-IMG system, under the conditions in Table 4-8:
Table 4-8 Connection of 10 BASE-T Cables to FCH Card(s) in PIM2 of 1-IMG 
Note 1:
Cables contained in each cable unit are as follows:
SR1201 ETIF CAU-C: UTP CTG5 ST CA-M, UTP CTG5 ST CA-J
SR1201 ETIF CAU-DC: UTP CTG5 ST CA-K, UTP CTG5 ST CA-J, UTP CTG5 CRS CA-F
Note 2:The...

Page 70

NDA-24299 CHAPTER 4
Page 55
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-15   Examples of Ethernet Cable Connection-FCH in PIM2 (1-IMG System) (2/2)
ATTENTIO NContents
S ta tic S en s itive
Handling
Precautions Required
06 04 05 03 02 01 00
06 04 05 03 02 01 00
CN
CN
CN
CNCN
CNUTP CTG5 ST CA-J
CNFC H
HUB
CN
HUB
BASEU
PIM 1
PIM 2
PIM  3
LPM
CN
CN
FANU
PIM 0
CN
FCH
CN
UTP CTG5 ST CA-M
UTP CTG5 ST CA-K
UTP CTG5 ST CA-J
TO PU
06 04 05 03 02 01 0006 04 05 03 02 01 00
CN
CNCN
CN
HUB
CN
CNHUB
BASEU
PIM...
Start reading NEC Neax 2400 Ipx Fusion Network System Manual

Related Manuals for NEC Neax 2400 Ipx Fusion Network System Manual

All NEC manuals