NEC Neax 2000 Ivs2 Remote Pim System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs2 Remote Pim System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 53 Figure 2-26 Example of M10 MDF Cross Connection via LTC Connector (Main Site) (2 of 2) 1 2 3 4RA TA26 27 28 29RB TB LTC (J)26 27 28 29RB TB1 2 3 4RA TA (P) 1 LTC3 CONNECTOR 9 10 11 12RA TA34 35 36 37RB TB LTC (J)34 35 36 37RB TB9 10 11 12RA TA (P) 2 LTC3 CONNECTOR 17 18 19 20RA TA42 43 44 45RB TB LTC (J)42 43 44...
Page 62
NEAX2000 IVS2 Remote PIM System ManualPage 54 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site Figure 2-27 Example of M10 MDF Cross Connection via CN Connector (Remote Site) (1 of 2) REMOTE PIM MDF PN-DAIB/DAIE MP12 TB TB TA TA RB RB RA4 3 2 1RA RECEIVE SEND 1 PN-DAIC/DAIF AP10 TB TA RB RA RECEIVE SEND 1 JP PN-M10 No. 1 LT05 RA 19 19 RA RB 44 44 RB TA 20 20 TA TB 45 45 TB LTC1 TO MAIN PIM PN-M10 CARD CN1RECEIVE SEND 2 RA 17 17 RA RB 42 42 RB TA 18 18 TA TB...
Page 63
CHAPTER 2 INSTALLATION MP Reset NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 55 Figure 2-27 Example of M10 MDF Cross Connection via CN Connector (Remote Site) (2 of 2) MP RESET After mounting all DAI cards/M10 cards and establishing the connection between the Main Site and the Remote Site, press SW1 switch on the MP card. 1 CN CONNECTOR 17 18 19 20RA TA42 43 44 45RB TB LTC (J)42 43 44 45RB TB17 18 19 20RA TA (P) 2 LTC1 CONNECTOR TB TA RB RA
Page 64
NEAX2000 IVS2 Remote PIM System ManualPage 56 ND-70917 (E), Issue 1.0 This page is for your notes.
Page 65
NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 57 CHAPTER 3 TROUBLESHOOTING This chapter explains the method for fault diagnosis and troubleshoot- ing when maintenance personnel detects fault occurrences by lamp indication on DAIA/DAIB/DAIC/DAID/DAIE/DAIF and M10 cards. For other system faults, refer to the Maintenance Manual.
Page 66
NEAX2000 IVS2 Remote PIM System ManualPage 58 ND-70917 (E), Issue 1.0 CHAPTER 3 TROUBLESHOOTING Table 3-1 shows contents of the faults and the remedial action on each lamp status. Table 3-1 Remedial Action on Each Lamp Status CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION PN-DAIA (DAIA)RUN lamp is not flashing.Abnormal operation of DAIA card1 Reset the MB switch. (Down→Up→Down) 2 Check the setting of SW1. 1: FP No. 1 2: FP No. 2 3: FP No. 3 0, 4-F: Not used 3 If the fault cannot be cleared,...
Page 67
CHAPTER 3 TROUBLESHOOTING NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 59 PN-DAIB (DAIB)RUN lamp is not flashing.Abnormal operation of DAIB card1 Reset the MB switch. (Down→Up→Down) 2 If the fault cannot be cleared, replace the card. LINK lamp is not on. Layer 2 link connec- tion failure between DAIA and DAIB1 Check to see if the cable between DAIA and DAIB is correctly connected. Refer to Connection Between Main Site and Remote Site on Page 47. 2 Reset the MB...
Page 68
NEAX2000 IVS2 Remote PIM System ManualPage 60 ND-70917 (E), Issue 1.0 CHAPTER 3 TROUBLESHOOTING PN-DAIC (DAIC)RUN lamp is not flashing.Abnormal operation of DAIC card1 Reset the MB switch. (Down→Up→Down) 2 If the fault cannot be cleared, replace the card. LINK lamp is not on. Layer 2 link connec- tion failure between DAIA and DAIB1 Check to see if the cable between DAIA and DAIB is correctly connected. Refer to Connection Between Main Site and Remote Site on Page 47. 2 Reset the MB switch....
Page 69
CHAPTER 3 TROUBLESHOOTING NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 61 PN-DAID (DAID)RUN lamp is not flashing.Abnormal operation of DAID card1 Reset the MB switch. (Down→Up→Down) 2 Check the setting of SW1. 1: FP No. 1 2: FP No. 2 3: FP No. 3 0, 4-F: Not used 3 If the fault cannot be cleared, replace the card. LINK lamp is not on. Layer 2 link connec- tion failure between DAID and DAIE1 Check to see if the cable between DAID and DAIE is correctly connected. Refer...
Page 70
NEAX2000 IVS2 Remote PIM System ManualPage 62 ND-70917 (E), Issue 1.0 CHAPTER 3 TROUBLESHOOTING PN-DAIE (DAIE)RUN lamp is not flashing.Abnormal operation of DAIE card1 Reset the MB switch. (Down→Up→Down) 2 If the fault cannot be cleared, replace the card. LINK lamp is not on. Layer 2 link connec- tion failure between DAID and DAIE1 Check to see if the cable between DAID and DAIE is correctly connected. Refer to Connection Between Main Site and Remote Site on Page 47. 2 Reset the MB switch....