CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 53
Figure 2-26  Example of M10 MDF Cross Connection via 
LTC Connector (Main Site) (2 of 2)
1 
2 
3 
4RA 
TA26 
27 
28 
29RB 
TB
LTC (J)26 
27 
28 
29RB 
TB1 
2 
3 
4RA 
TA
(P) 1  LTC3 CONNECTOR
9 
10 
11 
12RA 
TA34 
35 
36 
37RB 
TB
LTC (J)34 
35 
36 
37RB 
TB9 
10 
11 
12RA 
TA
(P) 2  LTC3 CONNECTOR
17 
18 
19 
20RA 
TA42 
43 
44 
45RB 
TB
LTC (J)42 
43 
44...

Page 62

 NEAX2000 IVS2 Remote PIM System ManualPage 54  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
Figure 2-27  Example of M10 MDF Cross Connection 
via CN Connector (Remote Site) (1 of 2)
REMOTE PIM
MDF PN-DAIB/DAIE
MP12
TB TB
TA TA
RB RB
RA4
3
2
1RA
RECEIVE
SEND
1
PN-DAIC/DAIF
AP10
TB
TA
RB
RA
RECEIVE
SEND
1
JP PN-M10
No. 1
LT05
RA 19 19 RA
RB 44 44 RB
TA 20 20 TA
TB 45 45 TB
LTC1
TO MAIN PIM PN-M10 CARD CN1RECEIVE
SEND
2
RA 17 17 RA
RB 42 42 RB
TA 18 18 TA
TB...

Page 63

CHAPTER 2  INSTALLATION
MP Reset
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 55
Figure 2-27  Example of M10 MDF Cross Connection 
via CN Connector (Remote Site) (2 of 2)
MP RESET
After mounting all DAI cards/M10 cards and establishing the connection between the Main Site
and the Remote Site, press SW1 switch on the MP card.
1  CN CONNECTOR
17 
18 
19 
20RA 
TA42 
43 
44 
45RB 
TB
LTC (J)42 
43 
44 
45RB 
TB17 
18 
19 
20RA 
TA
(P) 2  LTC1 CONNECTOR
TB 
TA 
RB 
RA 

Page 64

 NEAX2000 IVS2 Remote PIM System ManualPage 56  ND-70917 (E), Issue 1.0
This page is for your notes. 

Page 65

NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 57
CHAPTER 3
TROUBLESHOOTING
This chapter explains the method for fault diagnosis and troubleshoot-
ing when maintenance personnel detects fault occurrences by lamp
indication on DAIA/DAIB/DAIC/DAID/DAIE/DAIF and M10 cards. For
other system faults, refer to the Maintenance Manual. 

Page 66

 NEAX2000 IVS2 Remote PIM System ManualPage 58  ND-70917 (E), Issue 1.0
CHAPTER 3  TROUBLESHOOTING
Table 3-1 shows contents of the faults and the remedial action on each lamp status.
Table 3-1  Remedial Action on Each Lamp Status
CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION
PN-DAIA 
(DAIA)RUN lamp is not 
flashing.Abnormal operation 
of DAIA card1 Reset the MB switch.
(Down→Up→Down)
2 Check the setting of SW1.
1: FP No. 1
2: FP No. 2
3: FP No. 3
0, 4-F: Not used
3 If the fault cannot be 
cleared,...

Page 67

CHAPTER 3  TROUBLESHOOTING
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 59
PN-DAIB 
(DAIB)RUN lamp is not 
flashing.Abnormal operation 
of DAIB card1 Reset the MB switch.
(Down→Up→Down)
2 If the fault cannot be 
cleared, replace the card.
LINK lamp is not on. Layer 2 link connec-
tion failure between 
DAIA and DAIB1 Check to see if the cable 
between DAIA and DAIB is 
correctly connected. Refer 
to Connection Between 
Main Site and Remote Site 
on Page 47.
2 Reset the MB...

Page 68

 NEAX2000 IVS2 Remote PIM System ManualPage 60  ND-70917 (E), Issue 1.0
CHAPTER 3  TROUBLESHOOTING
PN-DAIC 
(DAIC)RUN lamp is not 
flashing.Abnormal operation 
of DAIC card1 Reset the MB switch.
(Down→Up→Down)
2 If the fault cannot be 
cleared, replace the card.
LINK lamp is not on. Layer 2 link connec-
tion failure between 
DAIA and DAIB1 Check to see if the cable 
between DAIA and DAIB is 
correctly connected. Refer 
to Connection Between 
Main Site and Remote Site 
on Page 47.
2 Reset the MB switch....

Page 69

CHAPTER 3  TROUBLESHOOTING
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 61
PN-DAID 
(DAID)RUN lamp is not 
flashing.Abnormal operation 
of DAID card1 Reset the MB switch.
(Down→Up→Down)
2 Check the setting of SW1.
1: FP No. 1
2: FP No. 2
3: FP No. 3
0, 4-F: Not used
3 If the fault cannot be 
cleared, replace the card.
LINK lamp is not on. Layer 2 link connec-
tion failure between 
DAID and DAIE1 Check to see if the cable 
between DAID and DAIE is 
correctly connected. Refer...

Page 70

 NEAX2000 IVS2 Remote PIM System ManualPage 62  ND-70917 (E), Issue 1.0
CHAPTER 3  TROUBLESHOOTING
PN-DAIE 
(DAIE)RUN lamp is not 
flashing.Abnormal operation 
of DAIE card1 Reset the MB switch.
(Down→Up→Down)
2 If the fault cannot be 
cleared, replace the card.
LINK lamp is not on. Layer 2 link connec-
tion failure between 
DAID and DAIE1 Check to see if the cable 
between DAID and DAIE is 
correctly connected. Refer 
to Connection Between 
Main Site and Remote Site 
on Page 47.
2 Reset the MB switch....