Page 51

CHAPTER 2  INSTALLATION
Installation for Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 43
 Install the PZ-8PFTB card to the PIM according to the following steps:
(1) Mount the PZ-8PFTB card into the PFT slot of the PIM.
(2) Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the 
PZ-8PFTB card as shown in Figure 2-27. 
Figure 2-17  Connection of 25-Pair Cable and PZ-8PFTB
(See (3) on Page 44.)
PFT1 CONNECTOR
CHAMP CONNECTOR ATTACHED...

Page 52

 NEAX2000 IVS2 Remote PIM System ManualPage 44  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Installation for Remote Site
(3) Connect the 25-pair cables on the MDF.
Figure 2-18 shows the PFT connector pin assignment for each PFT circuit number 
(No. 0-No. 7).
Figure 2-18  PFT Connector Pin Assignment
PFT0
1 Sta. R0 26 Sta. T0
2 8LC. R0 27 8LC. T0
3 C.O. R0 28 C.O. T0
4 8COT. R0 29 8COT. T0
5 Sta. R1 30 Sta. T1
6 8LC. R1 31 8LC. T1
7 C.O. R1 32 C.O. T1
8 8COT. R1 33 8COT. T1
9 Sta. R2 34 Sta. T2
10...

Page 53

CHAPTER 2  INSTALLATION
Installation for Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 45
Figure 2-19 shows an example of the MDF cross connection for the No. 0 circuit on the PFT 
(PZ-8PFTB).
Figure 2-19  MDF Cross Connection for PFT (8PFT) (1 of 2)
TO STATION
272
338
261
272 261
338 JP REMOTE PIM
LT00
35
41
349
35 349
41
T1LEN009
(No. 1)R1
T0LEN008
(No. 0)R0
T7LEN015
(No. 7)R7
PN-8COT
LT01
T1LEN001
(No. 1)R1
T0LEN000
(No. 0)R0
T7LEN007
(No. 7)R7
PN-8LC
PZ-PW121...

Page 54

 NEAX2000 IVS2 Remote PIM System ManualPage 46  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Installation for Remote Site
Figure 2-20  MDF Cross Connection for PFT (8PFT) (2 of 2)
3 LTC0 CONNECTOR
2 PFT1 CONNECTOR
48 23 MJ ALM
49 E 24
50 –27 V 2523 MJ ALM 48
24 49 E
25 50 –27 V
PFT1 (J)
1 Sta. R0 26 Sta. T0
2 8LC. R0 27 8LC. T0
3 C.O. R0 28 C.O. T0
4 8COT. R0 29 8COT. T0 26 Sta. T0 1 Sta. R0
27 8LC. T0 2 8LC. R0
28 C.O. T0 3 C.O. R0
29 8COT. T0 4 8COT. R0 
PFT0 (P)
TO STATION
TO PN-8LC
TO C.O. LINE
TO...

Page 55

CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 47
CONNECTION BETWEEN MAIN SITE 
AND REMOTE SITE
DAI Connection at Main Site
(1) When using the LTC connector on the BWB
Connect the cable to a CSU or directly to the Remote PIM via the MDF as shown in Figure 
2-21. Figure 2-22 shows an example of DAI MDF cross connection.
For the optical cable connection between the Main PIM and the Remote PIM, refer to 
Optical...

Page 56

 NEAX2000 IVS2 Remote PIM System ManualPage 48  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
Figure 2-22  Example of DAI MDF Cross Connection 
via LTC Connector (Main Site)
PIM 0
JP MDF PN-DAIA/DAID
AP09
RA 1 1 RA
RB 26 26 RB
TA 2 2 TA
TB 27 27 TB
LTC3
RECEIVE
SEND
TO CSU/ 
REMOTE PIM
1
JP PN-DAIC/DAIF
AP10
RA 9 9 RA
RB 34 34 RB
TA 10 10 TA
TB 35 35 TB
LTC3
RECEIVE
SEND
2
1 
2 
3 
4RA 
TA26 
27 
28 
29RB 
TB
LTC (J)26 
27 
28 
29RB 
TB1 
2 
3 
4RA 
TA
(P) 1...

Page 57

CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 49
(2) When using the CN connector on the DAI Card
Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the 
DAIA/DAIC/DAID/DAIF card as shown in Figure 2-23.
Figure 2-23  DAI Cable Connection via CN Connector (Main Site)
CSU MDF
TWISTED-PAIR
CABLE DA IA / BWBMAIN PIM
(SHIELD TYPE)
Max. 200 m (656 ft.) CN
DAIA/DAIC/DAID/DAIF MDF
CN
TB...

Page 58

 NEAX2000 IVS2 Remote PIM System ManualPage 50  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
DAI Connection at Remote Site
Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC/
DAIE/DAIF card as shown in Figure 2-24.
Figure 2-24  DAI Cable Connection via CN Connector (Remote Site)
REMOTE PIM
CSU MDF
TWISTED-PAIR
CABLE DAI B/ BWB
(SHIELD TYPE)
Max. 200 m (656 ft.) CN
DAIB/DAIC/DAIE/DAIF MDF
CN
TB
TA
RB
RA
TO CSU/MAIN...

Page 59

CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
NEAX2000 IVS2 Remote PIM System Manual    
ND-70917 (E), Issue 1.0   Page 51
Optical Cable Connection
When using an optical cable to establish the connection between the Main PIM and Remote PIM,
connect each end of the cable to the CN1 connector of the M10 cards on both sites. Two DAI
cards are connected to one M10 card, via MDF through LTC connector on the BWB or CN con-
nector on the DAI card.
Figure 2-25 through Figure 2-27 show an...

Page 60

 NEAX2000 IVS2 Remote PIM System ManualPage 52  ND-70917 (E), Issue 1.0
CHAPTER 2  INSTALLATION
Connection Between Main Site and Remote Site
Figure 2-26  Example of M10 MDF Cross Connection via 
LTC Connector (Main Site) (1 of 2)
PIM 0
JP MDF PN-DAIA/DAID
AP09
RA 1 1 RA
RB 26 26 RB
TA 2 2 TA
TB 27 27 TB
LTC3
RECEIVE
SEND
1
JP PN-DAIC/DAIF
AP10
RA 9 9 RA
RB 34 34 RB
TA 10 10 TA
TB 35 35 TB
LTC3
RECEIVE
SEND
2
JP PN-M10
No. 1
LT05
RA 19 19 RA
RB 44 44 RB
TA 20 20 TA
TB 45 45 TB
LTC1
TO REMOTE PIM PN-M10...