NEC Neax 2000 Ivs2 Remote Pim System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs2 Remote Pim System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 51
CHAPTER 2 INSTALLATION Installation for Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 43 Install the PZ-8PFTB card to the PIM according to the following steps: (1) Mount the PZ-8PFTB card into the PFT slot of the PIM. (2) Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the PZ-8PFTB card as shown in Figure 2-27. Figure 2-17 Connection of 25-Pair Cable and PZ-8PFTB (See (3) on Page 44.) PFT1 CONNECTOR CHAMP CONNECTOR ATTACHED...
Page 52
NEAX2000 IVS2 Remote PIM System ManualPage 44 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation for Remote Site (3) Connect the 25-pair cables on the MDF. Figure 2-18 shows the PFT connector pin assignment for each PFT circuit number (No. 0-No. 7). Figure 2-18 PFT Connector Pin Assignment PFT0 1 Sta. R0 26 Sta. T0 2 8LC. R0 27 8LC. T0 3 C.O. R0 28 C.O. T0 4 8COT. R0 29 8COT. T0 5 Sta. R1 30 Sta. T1 6 8LC. R1 31 8LC. T1 7 C.O. R1 32 C.O. T1 8 8COT. R1 33 8COT. T1 9 Sta. R2 34 Sta. T2 10...
Page 53
CHAPTER 2 INSTALLATION Installation for Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 45 Figure 2-19 shows an example of the MDF cross connection for the No. 0 circuit on the PFT (PZ-8PFTB). Figure 2-19 MDF Cross Connection for PFT (8PFT) (1 of 2) TO STATION 272 338 261 272 261 338 JP REMOTE PIM LT00 35 41 349 35 349 41 T1LEN009 (No. 1)R1 T0LEN008 (No. 0)R0 T7LEN015 (No. 7)R7 PN-8COT LT01 T1LEN001 (No. 1)R1 T0LEN000 (No. 0)R0 T7LEN007 (No. 7)R7 PN-8LC PZ-PW121...
Page 54
NEAX2000 IVS2 Remote PIM System ManualPage 46 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation for Remote Site Figure 2-20 MDF Cross Connection for PFT (8PFT) (2 of 2) 3 LTC0 CONNECTOR 2 PFT1 CONNECTOR 48 23 MJ ALM 49 E 24 50 –27 V 2523 MJ ALM 48 24 49 E 25 50 –27 V PFT1 (J) 1 Sta. R0 26 Sta. T0 2 8LC. R0 27 8LC. T0 3 C.O. R0 28 C.O. T0 4 8COT. R0 29 8COT. T0 26 Sta. T0 1 Sta. R0 27 8LC. T0 2 8LC. R0 28 C.O. T0 3 C.O. R0 29 8COT. T0 4 8COT. R0 PFT0 (P) TO STATION TO PN-8LC TO C.O. LINE TO...
Page 55
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 47 CONNECTION BETWEEN MAIN SITE AND REMOTE SITE DAI Connection at Main Site (1) When using the LTC connector on the BWB Connect the cable to a CSU or directly to the Remote PIM via the MDF as shown in Figure 2-21. Figure 2-22 shows an example of DAI MDF cross connection. For the optical cable connection between the Main PIM and the Remote PIM, refer to Optical...
Page 56
NEAX2000 IVS2 Remote PIM System ManualPage 48 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site Figure 2-22 Example of DAI MDF Cross Connection via LTC Connector (Main Site) PIM 0 JP MDF PN-DAIA/DAID AP09 RA 1 1 RA RB 26 26 RB TA 2 2 TA TB 27 27 TB LTC3 RECEIVE SEND TO CSU/ REMOTE PIM 1 JP PN-DAIC/DAIF AP10 RA 9 9 RA RB 34 34 RB TA 10 10 TA TB 35 35 TB LTC3 RECEIVE SEND 2 1 2 3 4RA TA26 27 28 29RB TB LTC (J)26 27 28 29RB TB1 2 3 4RA TA (P) 1...
Page 57
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 49 (2) When using the CN connector on the DAI Card Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the DAIA/DAIC/DAID/DAIF card as shown in Figure 2-23. Figure 2-23 DAI Cable Connection via CN Connector (Main Site) CSU MDF TWISTED-PAIR CABLE DA IA / BWBMAIN PIM (SHIELD TYPE) Max. 200 m (656 ft.) CN DAIA/DAIC/DAID/DAIF MDF CN TB...
Page 58
NEAX2000 IVS2 Remote PIM System ManualPage 50 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site DAI Connection at Remote Site Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC/ DAIE/DAIF card as shown in Figure 2-24. Figure 2-24 DAI Cable Connection via CN Connector (Remote Site) REMOTE PIM CSU MDF TWISTED-PAIR CABLE DAI B/ BWB (SHIELD TYPE) Max. 200 m (656 ft.) CN DAIB/DAIC/DAIE/DAIF MDF CN TB TA RB RA TO CSU/MAIN...
Page 59
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 51 Optical Cable Connection When using an optical cable to establish the connection between the Main PIM and Remote PIM, connect each end of the cable to the CN1 connector of the M10 cards on both sites. Two DAI cards are connected to one M10 card, via MDF through LTC connector on the BWB or CN con- nector on the DAI card. Figure 2-25 through Figure 2-27 show an...
Page 60
NEAX2000 IVS2 Remote PIM System ManualPage 52 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site Figure 2-26 Example of M10 MDF Cross Connection via LTC Connector (Main Site) (1 of 2) PIM 0 JP MDF PN-DAIA/DAID AP09 RA 1 1 RA RB 26 26 RB TA 2 2 TA TB 27 27 TB LTC3 RECEIVE SEND 1 JP PN-DAIC/DAIF AP10 RA 9 9 RA RB 34 34 RB TA 10 10 TA TB 35 35 TB LTC3 RECEIVE SEND 2 JP PN-M10 No. 1 LT05 RA 19 19 RA RB 44 44 RB TA 20 20 TA TB 45 45 TB LTC1 TO REMOTE PIM PN-M10...