CHAPTER 2 INSTALLATION Installation for Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 43 Install the PZ-8PFTB card to the PIM according to the following steps: (1) Mount the PZ-8PFTB card into the PFT slot of the PIM. (2) Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the PZ-8PFTB card as shown in Figure 2-27. Figure 2-17 Connection of 25-Pair Cable and PZ-8PFTB (See (3) on Page 44.) PFT1 CONNECTOR CHAMP CONNECTOR ATTACHED TO PZ-8PFTB 25-PAIR CABLE To MDF PFT0 CONNECTOR PZ-8PFTB
NEAX2000 IVS2 Remote PIM System ManualPage 44 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation for Remote Site (3) Connect the 25-pair cables on the MDF. Figure 2-18 shows the PFT connector pin assignment for each PFT circuit number (No. 0-No. 7). Figure 2-18 PFT Connector Pin Assignment PFT0 1 Sta. R0 26 Sta. T0 2 8LC. R0 27 8LC. T0 3 C.O. R0 28 C.O. T0 4 8COT. R0 29 8COT. T0 5 Sta. R1 30 Sta. T1 6 8LC. R1 31 8LC. T1 7 C.O. R1 32 C.O. T1 8 8COT. R1 33 8COT. T1 9 Sta. R2 34 Sta. T2 10 8LC. R2 35 8LC. T2 11 C.O. R2 36 C.O. T2 12 8COT. R2 37 8COT. T2 13 Sta. R3 38 Sta. T3 14 8LC. R3 39 8LC. T3 15 C.O. R3 40 C.O. T3 16 8COT. R3 41 8COT. T3 17 Sta. R4 42 Sta. T4 18 8LC. R4 43 8LC. T4 19 C.O. R4 44 C.O. T4 20 8COT. R4 45 8COT. T4 21 Sta. R5 46 Sta. T5 22 8LC. R5 47 8LC. T5 23 C.O. R5 48 C.O. T5 24 8COT. R5 49 8COT. T5 25 50 No. 0 No. 1 No. 3 No. 2 No. 5 No. 4 PFT1 1 Sta. R6 26 Sta. T6 2 8LC. R6 27 8LC. T6 3 C.O. R6 28 C.O. T6 4 8COT. R6 29 8COT. T6 5 Sta. R7 30 Sta. T7 6 8LC. R7 31 8LC. T7 7 C.O. R7 32 C.O. T7 8 8COT. R7 33 8COT. T7 934 10 35 11 36 12 37 13 38 14 39 15 40 16 41 17 42 18 43 19 44 20 45 21 46 22 47 23 48 24 49 E 25 50 –27 V No. 6 No. 7
CHAPTER 2 INSTALLATION Installation for Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 45 Figure 2-19 shows an example of the MDF cross connection for the No. 0 circuit on the PFT (PZ-8PFTB). Figure 2-19 MDF Cross Connection for PFT (8PFT) (1 of 2) TO STATION 272 338 261 272 261 338 JP REMOTE PIM LT00 35 41 349 35 349 41 T1LEN009 (No. 1)R1 T0LEN008 (No. 0)R0 T7LEN015 (No. 7)R7 PN-8COT LT01 T1LEN001 (No. 1)R1 T0LEN000 (No. 0)R0 T7LEN007 (No. 7)R7 PN-8LC PZ-PW121 –27 V G261 Sta. R0 Sta. T0 283 C.O. R0 C.O. T0 294 8COT. R0 8COT. T0 272 8LC. R0 8LC. T0PFT0 TO C.O. LINE PZ-8PFTB No. 0 PJ PFT1 49 24 50 25 –27 V E PJ Tip Ring Tip Ring MDF INSTALLATION CABLE LTC0 10 10 16 16 PN-DAIB/DAIE 25 2512D MP23 MJ ALM
NEAX2000 IVS2 Remote PIM System ManualPage 46 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Installation for Remote Site Figure 2-20 MDF Cross Connection for PFT (8PFT) (2 of 2) 3 LTC0 CONNECTOR 2 PFT1 CONNECTOR 48 23 MJ ALM 49 E 24 50 –27 V 2523 MJ ALM 48 24 49 E 25 50 –27 V PFT1 (J) 1 Sta. R0 26 Sta. T0 2 8LC. R0 27 8LC. T0 3 C.O. R0 28 C.O. T0 4 8COT. R0 29 8COT. T0 26 Sta. T0 1 Sta. R0 27 8LC. T0 2 8LC. R0 28 C.O. T0 3 C.O. R0 29 8COT. T0 4 8COT. R0 PFT0 (P) TO STATION TO PN-8LC TO C.O. LINE TO PN-8COT PFT0 (J) PFT1 (P) 1 PFT0 CONNECTOR TO PZ-PW121 1R026T0 227 328 429 LTC0 (J) LEN000 LEN008 26 T0 1 R0 27 2 28 3 29 4 LTC0 (P) TO PZ-8PFTB TO PZ-8PFTB9R034T0 10 35 11 36 12 3734 T0 9 R0 35 10 36 11 37 12 TO PN-DAIB/DAIE
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 47 CONNECTION BETWEEN MAIN SITE AND REMOTE SITE DAI Connection at Main Site (1) When using the LTC connector on the BWB Connect the cable to a CSU or directly to the Remote PIM via the MDF as shown in Figure 2-21. Figure 2-22 shows an example of DAI MDF cross connection. For the optical cable connection between the Main PIM and the Remote PIM, refer to Optical Cable Connection on Page 51. Figure 2-21 DAI Cable Connection via LTC Connector (Main Site) CSU MDF LTC0/1/2/3 CONNECTORTWISTED-PAIR CABLE DA IA / BWBMAIN PIM (SHIELD TYPE) NOTE 1:When the Remote PIM is directly connected without CSU, maximum distance is 400 m (1312 ft.) between the Main PIM and the Remote PIM. NOTE 2:When the DAIA/DAID card is mounted in the AP11 slot, be sure to use the CN connector on the DAIA/DAID card. See (2) on Page 49. NOTE 1 CSU: CONNECTION SERVICE UNIT DA IC/ DA ID/ DA IF REMOTE PIMMax. 200 m (656 ft.) (0.65φ cable)
NEAX2000 IVS2 Remote PIM System ManualPage 48 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site Figure 2-22 Example of DAI MDF Cross Connection via LTC Connector (Main Site) PIM 0 JP MDF PN-DAIA/DAID AP09 RA 1 1 RA RB 26 26 RB TA 2 2 TA TB 27 27 TB LTC3 RECEIVE SEND TO CSU/ REMOTE PIM 1 JP PN-DAIC/DAIF AP10 RA 9 9 RA RB 34 34 RB TA 10 10 TA TB 35 35 TB LTC3 RECEIVE SEND 2 1 2 3 4RA TA26 27 28 29RB TB LTC (J)26 27 28 29RB TB1 2 3 4RA TA (P) 1 LTC3 CONNECTOR9 10 11 12RA TA34 35 36 37RB TB LTC (J)34 35 36 37RB TB9 10 11 12RA TA (P) 2 LTC3 CONNECTOR
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 49 (2) When using the CN connector on the DAI Card Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the DAIA/DAIC/DAID/DAIF card as shown in Figure 2-23. Figure 2-23 DAI Cable Connection via CN Connector (Main Site) CSU MDF TWISTED-PAIR CABLE DA IA / BWBMAIN PIM (SHIELD TYPE) Max. 200 m (656 ft.) CN DAIA/DAIC/DAID/DAIF MDF CN TB TA RB RA TO CSU/REMOTE PIM SEND RECEIVE 4 3 2 1 TB TA RB RA TB TA RB RA CN CONNECTOR(0.65 φ cable) NOTE:When the Remote PIM is directly connected without CSU, maximum distance is 400 m (1312 ft.) between the Main PIM and the Remote PIM. NOTE DAI C/ DAI D/ DA IF REMOTE PIM
NEAX2000 IVS2 Remote PIM System ManualPage 50 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site DAI Connection at Remote Site Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC/ DAIE/DAIF card as shown in Figure 2-24. Figure 2-24 DAI Cable Connection via CN Connector (Remote Site) REMOTE PIM CSU MDF TWISTED-PAIR CABLE DAI B/ BWB (SHIELD TYPE) Max. 200 m (656 ft.) CN DAIB/DAIC/DAIE/DAIF MDF CN TB TA RB RA TO CSU/MAIN PIM SEND RECEIVE 4 3 2 1 TB TA RB RA TB TA RB RA CN CONNECTOR(0.65 φ cable) NOTE:When the Remote PIM is directly connected without CSU, maximum distance is 400 m (1312 ft.) between the Main PIM and the Remote PIM. NOTE DAI C/ DAI E/ DAI F MAIN PIM
CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site NEAX2000 IVS2 Remote PIM System Manual ND-70917 (E), Issue 1.0 Page 51 Optical Cable Connection When using an optical cable to establish the connection between the Main PIM and Remote PIM, connect each end of the cable to the CN1 connector of the M10 cards on both sites. Two DAI cards are connected to one M10 card, via MDF through LTC connector on the BWB or CN con- nector on the DAI card. Figure 2-25 through Figure 2-27 show an outline of the connection and an example of the M10 MDF cross connection. Figure 2-25 Outline of Optical Cable Connection MDF MAIN PIM OPTICAL CABLE Max. 10 km (6.25 miles) DAIA/ DAIC/ DAID/ DAIF DAIA/ DAIC/ DAID/ DAIF M10 MDF REMOTE PIM DAIB/ DAIC/ DAIE/ DAIF DAIB/ DAIC/ DAIE/ DAIF M10 CN1CN1
NEAX2000 IVS2 Remote PIM System ManualPage 52 ND-70917 (E), Issue 1.0 CHAPTER 2 INSTALLATION Connection Between Main Site and Remote Site Figure 2-26 Example of M10 MDF Cross Connection via LTC Connector (Main Site) (1 of 2) PIM 0 JP MDF PN-DAIA/DAID AP09 RA 1 1 RA RB 26 26 RB TA 2 2 TA TB 27 27 TB LTC3 RECEIVE SEND 1 JP PN-DAIC/DAIF AP10 RA 9 9 RA RB 34 34 RB TA 10 10 TA TB 35 35 TB LTC3 RECEIVE SEND 2 JP PN-M10 No. 1 LT05 RA 19 19 RA RB 44 44 RB TA 20 20 TA TB 45 45 TB LTC1 TO REMOTE PIM PN-M10 CARD CN1RECEIVE SEND 3 RA 17 17 RA RB 42 42 RB TA 18 18 TA TB 43 43 TBRECEIVE SEND No. 0