    							CHAPTER 2  INSTALLATION
    Installation for Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 43
     Install the PZ-8PFTB card to the PIM according to the following steps:
    (1) Mount the PZ-8PFTB card into the PFT slot of the PIM.
    (2) Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the 
    PZ-8PFTB card as shown in Figure 2-27. 
    Figure 2-17  Connection of 25-Pair Cable and PZ-8PFTB
    (See (3) on Page 44.)
    PFT1 CONNECTOR
    CHAMP CONNECTOR ATTACHED TO PZ-8PFTB 
    25-PAIR CABLE
    To MDF  PFT0 CONNECTOR PZ-8PFTB 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 44  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Installation for Remote Site
    (3) Connect the 25-pair cables on the MDF.
    Figure 2-18 shows the PFT connector pin assignment for each PFT circuit number 
    (No. 0-No. 7).
    Figure 2-18  PFT Connector Pin Assignment
    PFT0
    1 Sta. R0 26 Sta. T0
    2 8LC. R0 27 8LC. T0
    3 C.O. R0 28 C.O. T0
    4 8COT. R0 29 8COT. T0
    5 Sta. R1 30 Sta. T1
    6 8LC. R1 31 8LC. T1
    7 C.O. R1 32 C.O. T1
    8 8COT. R1 33 8COT. T1
    9 Sta. R2 34 Sta. T2
    10 8LC. R2 35 8LC. T2
    11 C.O. R2 36 C.O. T2
    12 8COT. R2 37 8COT. T2
    13 Sta. R3 38 Sta. T3
    14 8LC. R3 39 8LC. T3
    15 C.O. R3 40 C.O. T3
    16 8COT. R3 41 8COT. T3
    17 Sta. R4 42 Sta. T4
    18 8LC. R4 43 8LC. T4
    19 C.O. R4 44 C.O. T4
    20 8COT. R4 45 8COT. T4
    21 Sta. R5 46 Sta. T5
    22 8LC. R5 47 8LC. T5
    23 C.O. R5 48 C.O. T5
    24 8COT. R5 49 8COT. T5
    25 50
    No. 0
    No. 1
    No. 3
    No. 2
    No. 5
    No. 4
    PFT1
    1 Sta. R6 26 Sta. T6
    2 8LC. R6 27 8LC. T6
    3 C.O. R6 28 C.O. T6
    4 8COT. R6 29 8COT. T6
    5 Sta. R7 30 Sta. T7
    6 8LC. R7 31 8LC. T7
    7 C.O. R7 32 C.O. T7
    8 8COT. R7 33 8COT. T7
    934
    10 35
    11 36
    12 37
    13 38
    14 39
    15 40
    16 41
    17 42
    18 43
    19 44
    20 45
    21 46
    22 47
    23 48
    24 49 E
    25 50 –27 V
    No. 6
    No. 7 
    						
    							CHAPTER 2  INSTALLATION
    Installation for Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 45
    Figure 2-19 shows an example of the MDF cross connection for the No. 0 circuit on the PFT 
    (PZ-8PFTB).
    Figure 2-19  MDF Cross Connection for PFT (8PFT) (1 of 2)
    TO STATION
    272
    338
    261
    272 261
    338 JP REMOTE PIM
    LT00
    35
    41
    349
    35 349
    41
    T1LEN009
    (No. 1)R1
    T0LEN008
    (No. 0)R0
    T7LEN015
    (No. 7)R7
    PN-8COT
    LT01
    T1LEN001
    (No. 1)R1
    T0LEN000
    (No. 0)R0
    T7LEN007
    (No. 7)R7
    PN-8LC
    PZ-PW121
    –27 V
    G261 Sta. R0
    Sta. T0
    283 C.O. R0
    C.O. T0
    294 8COT. R0
    8COT. T0
    272 8LC. R0
    8LC. T0PFT0
    TO C.O. LINE
    PZ-8PFTB
    No. 0
    PJ
    PFT1
    49
    24
    50 25
    –27 V E
    PJ
    Tip
    Ring
    Tip
    Ring MDF
    INSTALLATION CABLE LTC0
    10 10
    16
    16
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    
    PN-DAIB/DAIE
    25 2512D
    MP23
    MJ ALM 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 46  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Installation for Remote Site
    Figure 2-20  MDF Cross Connection for PFT (8PFT) (2 of 2)
    3 LTC0 CONNECTOR
    2 PFT1 CONNECTOR
    48 23 MJ ALM
    49 E 24
    50 –27 V 2523 MJ ALM 48
    24 49 E
    25 50 –27 V
    PFT1 (J)
    1 Sta. R0 26 Sta. T0
    2 8LC. R0 27 8LC. T0
    3 C.O. R0 28 C.O. T0
    4 8COT. R0 29 8COT. T0 26 Sta. T0 1 Sta. R0
    27 8LC. T0 2 8LC. R0
    28 C.O. T0 3 C.O. R0
    29 8COT. T0 4 8COT. R0 
    PFT0 (P)
    TO STATION
    TO PN-8LC
    TO C.O. LINE
    TO PN-8COT
    PFT0 (J)
    PFT1 (P)
    1 PFT0 CONNECTOR
    TO PZ-PW121
    1R026T0
    227
    328
    429
    LTC0 (J)
    LEN000
    LEN008
    26 T0 1 R0
    27 2
    28 3
    29 4
    LTC0 (P)
    TO PZ-8PFTB
    TO PZ-8PFTB9R034T0
    10 35
    11 36
    12 3734 T0 9 R0
    35 10
    36 11
    37 12
    TO PN-DAIB/DAIE 
    						
    							CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 47
    CONNECTION BETWEEN MAIN SITE 
    AND REMOTE SITE
    DAI Connection at Main Site
    (1) When using the LTC connector on the BWB
    Connect the cable to a CSU or directly to the Remote PIM via the MDF as shown in Figure 
    2-21. Figure 2-22 shows an example of DAI MDF cross connection.
    For the optical cable connection between the Main PIM and the Remote PIM, refer to 
    Optical Cable Connection on Page 51.
    Figure 2-21  DAI Cable Connection via LTC Connector (Main Site)
    CSU MDF
    LTC0/1/2/3 CONNECTORTWISTED-PAIR
    CABLE DA IA / BWBMAIN PIM
    (SHIELD TYPE)
    NOTE 1:When the Remote PIM is directly connected without CSU, maximum distance is
    400 m (1312 ft.) between the Main PIM and the Remote PIM.
    NOTE 2:When the DAIA/DAID card is mounted in the AP11 slot, be sure to use the CN
    connector on the DAIA/DAID card. See (2) on Page 49.
    NOTE 1
    CSU: CONNECTION 
    SERVICE UNIT DA IC/
    DA ID/
    DA IF
    REMOTE PIMMax. 200 m (656 ft.)
    (0.65φ cable) 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 48  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    Figure 2-22  Example of DAI MDF Cross Connection 
    via LTC Connector (Main Site)
    PIM 0
    JP MDF PN-DAIA/DAID
    AP09
    RA 1 1 RA
    RB 26 26 RB
    TA 2 2 TA
    TB 27 27 TB
    LTC3
    RECEIVE
    SEND
    TO CSU/ 
    REMOTE PIM
    1
    JP PN-DAIC/DAIF
    AP10
    RA 9 9 RA
    RB 34 34 RB
    TA 10 10 TA
    TB 35 35 TB
    LTC3
    RECEIVE
    SEND
    2
    1 
    2 
    3 
    4RA 
    TA26 
    27 
    28 
    29RB 
    TB
    LTC (J)26 
    27 
    28 
    29RB 
    TB1 
    2 
    3 
    4RA 
    TA
    (P) 1  LTC3 CONNECTOR9 
    10 
    11 
    12RA 
    TA34 
    35 
    36 
    37RB 
    TB
    LTC (J)34 
    35 
    36 
    37RB 
    TB9 
    10 
    11 
    12RA 
    TA
    (P) 2  LTC3 CONNECTOR 
    						
    							CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 49
    (2) When using the CN connector on the DAI Card
    Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the 
    DAIA/DAIC/DAID/DAIF card as shown in Figure 2-23.
    Figure 2-23  DAI Cable Connection via CN Connector (Main Site)
    CSU MDF
    TWISTED-PAIR
    CABLE DA IA / BWBMAIN PIM
    (SHIELD TYPE)
    Max. 200 m (656 ft.) CN
    DAIA/DAIC/DAID/DAIF MDF
    CN
    TB
    TA
    RB
    RA
    TO CSU/REMOTE PIM SEND
    RECEIVE
    4
    3
    2
    1 TB
    TA
    RB
    RA
    TB
    TA
    RB
    RA
    CN CONNECTOR(0.65
    φ cable)
    NOTE:When the Remote PIM is directly connected without CSU, maximum distance is
    400 m (1312 ft.) between the Main PIM and the Remote PIM.
    NOTE DAI C/
    DAI D/
    DA IF  
    REMOTE PIM 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 50  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    DAI Connection at Remote Site
    Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC/
    DAIE/DAIF card as shown in Figure 2-24.
    Figure 2-24  DAI Cable Connection via CN Connector (Remote Site)
    REMOTE PIM
    CSU MDF
    TWISTED-PAIR
    CABLE DAI B/ BWB
    (SHIELD TYPE)
    Max. 200 m (656 ft.) CN
    DAIB/DAIC/DAIE/DAIF MDF
    CN
    TB
    TA
    RB
    RA
    TO CSU/MAIN PIM SEND
    RECEIVE
    4
    3
    2
    1 TB
    TA
    RB
    RA
    TB
    TA
    RB
    RA
    CN CONNECTOR(0.65
    φ cable)
    NOTE:When the Remote PIM is directly connected without CSU, maximum distance is
    400 m (1312 ft.) between the Main PIM and the Remote PIM.
    NOTE DAI C/
    DAI E/
    DAI F 
    MAIN PIM 
    						
    							CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 51
    Optical Cable Connection
    When using an optical cable to establish the connection between the Main PIM and Remote PIM,
    connect each end of the cable to the CN1 connector of the M10 cards on both sites. Two DAI
    cards are connected to one M10 card, via MDF through LTC connector on the BWB or CN con-
    nector on the DAI card.
    Figure 2-25 through Figure 2-27 show an outline of the connection and an example of the M10
    MDF cross connection.
    Figure 2-25  Outline of Optical Cable Connection
    MDF MAIN PIM
    OPTICAL 
    CABLE
    Max. 10 km (6.25 miles) DAIA/ 
    DAIC/ 
    DAID/ 
    DAIF
    DAIA/ 
    DAIC/ 
    DAID/ 
    DAIF
    M10
    MDF REMOTE PIM
    DAIB/ 
    DAIC/ 
    DAIE/ 
    DAIF
    DAIB/ 
    DAIC/ 
    DAIE/ 
    DAIF
    M10
    CN1CN1 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 52  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    Figure 2-26  Example of M10 MDF Cross Connection via 
    LTC Connector (Main Site) (1 of 2)
    PIM 0
    JP MDF PN-DAIA/DAID
    AP09
    RA 1 1 RA
    RB 26 26 RB
    TA 2 2 TA
    TB 27 27 TB
    LTC3
    RECEIVE
    SEND
    1
    JP PN-DAIC/DAIF
    AP10
    RA 9 9 RA
    RB 34 34 RB
    TA 10 10 TA
    TB 35 35 TB
    LTC3
    RECEIVE
    SEND
    2
    JP PN-M10
    No. 1
    LT05
    RA 19 19 RA
    RB 44 44 RB
    TA 20 20 TA
    TB 45 45 TB
    LTC1
    TO REMOTE PIM PN-M10 CARD CN1RECEIVE
    SEND
    3
    RA 17 17 RA
    RB 42 42 RB
    TA 18 18 TA
    TB 43 43 TBRECEIVE
    SEND
    No. 0 
    						