Home > NEC > Communications System > NEC Neax 2000 Ivs2 Remote Pim System Manual

NEC Neax 2000 Ivs2 Remote Pim System Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs2 Remote Pim System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 53
    Figure 2-26  Example of M10 MDF Cross Connection via 
    LTC Connector (Main Site) (2 of 2)
    1 
    2 
    3 
    4RA 
    TA26 
    27 
    28 
    29RB 
    TB
    LTC (J)26 
    27 
    28 
    29RB 
    TB1 
    2 
    3 
    4RA 
    TA
    (P) 1  LTC3 CONNECTOR
    9 
    10 
    11 
    12RA 
    TA34 
    35 
    36 
    37RB 
    TB
    LTC (J)34 
    35 
    36 
    37RB 
    TB9 
    10 
    11 
    12RA 
    TA
    (P) 2  LTC3 CONNECTOR
    17 
    18 
    19 
    20RA 
    TA42 
    43 
    44 
    45RB 
    TB
    LTC (J)42 
    43 
    44 
    45RB 
    TB17 
    18 
    19 
    20RA 
    TA
    (P) 3  LTC1 CONNECTOR 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 54  ND-70917 (E), Issue 1.0
    CHAPTER 2  INSTALLATION
    Connection Between Main Site and Remote Site
    Figure 2-27  Example of M10 MDF Cross Connection 
    via CN Connector (Remote Site) (1 of 2)
    REMOTE PIM
    MDF PN-DAIB/DAIE
    MP12
    TB TB
    TA TA
    RB RB
    RA4
    3
    2
    1RA
    RECEIVE
    SEND
    1
    PN-DAIC/DAIF
    AP10
    TB
    TA
    RB
    RA
    RECEIVE
    SEND
    1
    JP PN-M10
    No. 1
    LT05
    RA 19 19 RA
    RB 44 44 RB
    TA 20 20 TA
    TB 45 45 TB
    LTC1
    TO MAIN PIM PN-M10 CARD CN1RECEIVE
    SEND
    2
    RA 17 17 RA
    RB 42 42 RB
    TA 18 18 TA
    TB 43 43 TBRECEIVE
    SEND
    No. 0
    TB
    TA
    RB
    RA4 CN CN
    3
    2
    1 
    						
    							CHAPTER 2  INSTALLATION
    MP Reset
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 55
    Figure 2-27  Example of M10 MDF Cross Connection 
    via CN Connector (Remote Site) (2 of 2)
    MP RESET
    After mounting all DAI cards/M10 cards and establishing the connection between the Main Site
    and the Remote Site, press SW1 switch on the MP card.
    1  CN CONNECTOR
    17 
    18 
    19 
    20RA 
    TA42 
    43 
    44 
    45RB 
    TB
    LTC (J)42 
    43 
    44 
    45RB 
    TB17 
    18 
    19 
    20RA 
    TA
    (P) 2  LTC1 CONNECTOR
    TB 
    TA 
    RB 
    RA 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 56  ND-70917 (E), Issue 1.0
    This page is for your notes. 
    						
    							NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 57
    CHAPTER 3
    TROUBLESHOOTING
    This chapter explains the method for fault diagnosis and troubleshoot-
    ing when maintenance personnel detects fault occurrences by lamp
    indication on DAIA/DAIB/DAIC/DAID/DAIE/DAIF and M10 cards. For
    other system faults, refer to the Maintenance Manual. 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 58  ND-70917 (E), Issue 1.0
    CHAPTER 3  TROUBLESHOOTING
    Table 3-1 shows contents of the faults and the remedial action on each lamp status.
    Table 3-1  Remedial Action on Each Lamp Status
    CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION
    PN-DAIA 
    (DAIA)RUN lamp is not 
    flashing.Abnormal operation 
    of DAIA card1 Reset the MB switch.
    (Down→Up→Down)
    2 Check the setting of SW1.
    1: FP No. 1
    2: FP No. 2
    3: FP No. 3
    0, 4-F: Not used
    3 If the fault cannot be 
    cleared, replace the card.
    LINK lamp is not on. Layer 2 link connec-
    tion failure between 
    DAIA and DAIB1 Check to see if the cable 
    between DAIA and DAIB is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch.
    (Down→Up→Down)
    RED lamp is on. PCM signal loss or 
    Frame Alignment 
    signal lossCheck to see if the cable 
    between DAIA and DAIB is cor-
    rectly connected. Refer to 
    Connection Between Main 
    Site and Remote Site on Page 
    47.
    RMT lamp is on. Remote alarm Check to see if the cable 
    between DAIA and DAIB 
    (sending side) is correctly con-
    nected. Refer to Connection 
    Between Main Site and 
    Remote Site on Page 47. 
    						
    							CHAPTER 3  TROUBLESHOOTING
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 59
    PN-DAIB 
    (DAIB)RUN lamp is not 
    flashing.Abnormal operation 
    of DAIB card1 Reset the MB switch.
    (Down→Up→Down)
    2 If the fault cannot be 
    cleared, replace the card.
    LINK lamp is not on. Layer 2 link connec-
    tion failure between 
    DAIA and DAIB1 Check to see if the cable 
    between DAIA and DAIB is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch.
    (Down→Up→Down)
    RED lamp is on. PCM signal loss or 
    Frame Alignment 
    signal loss1 Check to see if the cable 
    between DAIA and DAIB is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch of 
    DAIA card on the Main Site.
    (Down→Up→Down)
    RMT lamp is on. Remote alarm Check to see if the cable 
    between DAIA and DAIB 
    (sending side) is correctly con-
    nected. Refer to Connection 
    Between Main Site and 
    Remote Site on Page 47.
    Table 3-1  Remedial Action on Each Lamp Status (Continued)
    CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 60  ND-70917 (E), Issue 1.0
    CHAPTER 3  TROUBLESHOOTING
    PN-DAIC 
    (DAIC)RUN lamp is not 
    flashing.Abnormal operation 
    of DAIC card1 Reset the MB switch.
    (Down→Up→Down)
    2 If the fault cannot be 
    cleared, replace the card.
    LINK lamp is not on. Layer 2 link connec-
    tion failure between 
    DAIA and DAIB1 Check to see if the cable 
    between DAIA and DAIB is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch.
    (Down→Up→Down)
    3 Check whether cable 
    between DAIC cards is cor-
    rectly connected. Connec-
    tion Between Main Site and 
    Remote Site on Page 47.
    RED lamp is on. PCM signal loss or 
    Frame Alignment 
    signal lossCheck to see if the cable 
    between DAIC cards is cor-
    rectly connected. Refer to 
    Connection Between Main 
    Site and Remote Site on Page 
    47.
    RMT lamp is on. Remote alarm Check to see if the cable 
    between DAIC cards (sending 
    side) is correctly connected. 
    Refer to Connection Between 
    Main Site and Remote Site on 
    Page 47.
    Table 3-1  Remedial Action on Each Lamp Status (Continued)
    CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION 
    						
    							CHAPTER 3  TROUBLESHOOTING
    NEAX2000 IVS2 Remote PIM System Manual    
    ND-70917 (E), Issue 1.0   Page 61
    PN-DAID 
    (DAID)RUN lamp is not 
    flashing.Abnormal operation 
    of DAID card1 Reset the MB switch.
    (Down→Up→Down)
    2 Check the setting of SW1.
    1: FP No. 1
    2: FP No. 2
    3: FP No. 3
    0, 4-F: Not used
    3 If the fault cannot be 
    cleared, replace the card.
    LINK lamp is not on. Layer 2 link connec-
    tion failure between 
    DAID and DAIE1 Check to see if the cable 
    between DAID and DAIE is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch.
    (Down→Up→Down)
    RMT lamp is on. Remote alarm Check to see if the cable 
    between DAID and DAIE 
    (sending side) is correctly con-
    nected. Refer to Connection 
    Between Main Site and 
    Remote Site on Page 47.
    PWR lamp is on. PCM signal loss Check to see if the cable 
    between DAID and DAIE is cor-
    rectly connected. Refer to 
    Connection Between Main 
    Site and Remote Site on Page 
    47.
    Table 3-1  Remedial Action on Each Lamp Status (Continued)
    CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION 
    						
    							 NEAX2000 IVS2 Remote PIM System ManualPage 62  ND-70917 (E), Issue 1.0
    CHAPTER 3  TROUBLESHOOTING
    PN-DAIE 
    (DAIE)RUN lamp is not 
    flashing.Abnormal operation 
    of DAIE card1 Reset the MB switch.
    (Down→Up→Down)
    2 If the fault cannot be 
    cleared, replace the card.
    LINK lamp is not on. Layer 2 link connec-
    tion failure between 
    DAID and DAIE1 Check to see if the cable 
    between DAID and DAIE is 
    correctly connected. Refer 
    to Connection Between 
    Main Site and Remote Site 
    on Page 47.
    2 Reset the MB switch.
    (Down→Up→Down)
    RMT lamp is on. Remote alarm Check to see if the cable 
    between DAID and DAIE 
    (sending side) is correctly con-
    nected. Refer to Connection 
    Between Main Site and 
    Remote Site on Page 47.
    Table 3-1  Remedial Action on Each Lamp Status (Continued)
    CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs2 Remote Pim System Manual