NEC Neax 2000 Ivs Wcs System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs Wcs System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 111
ND-46248 (E) CHAPTER 3Page 91 Revision 2.0 INSTALLATION Figure 3-43 Battery Connection in BATTM for PW86 Card STEP 2: Plug the battery cable connector into the BATT1 connector on the PW86 card in PIM0 or PIM4 as sh ow n in Fi gure 3 -44 . Figure 3-44 Connection to PW86 Card TO PW86 CARD IN PIM0/PIM4 BATTERY CABLE BATTM Note:External batteries can be connected in the same manner as the batteries in the BATTM. Blue Black Red 24 V DC BATTERY CABLE PW86 CARDBATT1 CONNECTOR PIM0/PIM4
Page 112
CHAPTER 3 ND-46248 (E) Pag e 92 Revision 2.0 INSTALLATION STEP 3: When the system is a multiple-PIM configuration, connect the PW86 cards to each other using thePWR CA-A as s h ow n in Fig ure 3- 45 . Figure 3-45 Connection of PWR CA-A for a Multiple PIM Configuration BATT2 BATT1 PW86 PIM3 BATT2 BATT1 PW86 PIM2 BATT2 BATT1 PW86 PIM1 BATT2 BATT1 PW86PIM0 BATTERY CABLE BATT2 BATT1 PW86 PIM7 BATT2 BATT1 PW86 PIM6 BATT2 BATT1 PW86 PIM5 BATT2 BATT1 PW86PIM4 BATTERY CABLE Note:External batteries...
Page 113
ND-46248 (E) CHAPTER 3Page 93 Revision 2.0 INSTALLATION 2. For PW91 card (-48 V DC) STEP 1: Connect the battery cables to the batteries, and mount the battery units (4x12 VDC, 24AH per unit) in to t he Ba tt e ry M odule ( B ATTM) as sh ow n in Figure 3 -46 and 3 -47 . Figure 3-46 Battery Mounting into BATTM for PW91 Card BATTERY CABLE BATTM BATTERY UNIT (2x12 V DC, 24AH) BATTERY UNIT (2x12 V DC, 24AH) FRONT Recommended Batteries GS Portalac PE12V 24ABI Yuasa NP24-12B Specifications UL...
Page 114
CHAPTER 3 ND-46248 (E) Pag e 94 Revision 2.0 Figure 3-47 Battery Connection in BATTM for PW91 Card STEP 2: Plug the battery cable connector into the BATT2 connector on the PW91 card in the PWRM assh ow n in Fi gure 3 -48 . Figure 3-48 Connection to PW91 Card TO PW91 CARD IN PWRM BATTERY CABLE BATTM Note:External batteries can be connected in the same manner as the batteries in the BATTM. -48 V DC Red Blue BATTERY CABLE PW91 CARD BATT2 CONNECTOR PWRM
Page 115
ND-46248 (E) CHAPTER 3Page 95 Revision 2.0 INSTALLATION STEP 3: When the system is equipped with more than two PW91 cards, connect the PW91 cards to each other usin g t he P WR CA-A as s how n in Fig ure 3-49 . Figure 3-49 Connection of PWR CA-A/BATTERY CABLE PWRM PW91 BATT2 BATT1PW91 BATT2 BATT1PW91 BATT2 BATT1PW91 BATT2 BATT1 TO BATTERYTO BATTERYPWR CA-APWR CA-A
Page 116
CHAPTER 3 ND-46248 (E) Pag e 96 Revision 2.0 INSTALLATION 5. INSTALLATION FOR MULTI-SITE ROAMING 5.1 Installation Procedure for Multi-Site Roaming Perform th e in sta lla ti on pr oce dure sh ow n in Fi gure 3- 50 . Figure 3-50 Installation Procedure for Multi-Site Roaming END START MOUNTING DTI, DCH AND DBM CARD SELECTION OF PLO IN MP CARD CABLE CONNECTION VIA MDF SEE SECTION 5.2 SEE SECTION 5.3 SEE SECTION 5.5 MOUNTING PLO CARD SEE SECTION 5.4 Note Note:PLO card (PN-CK00) is required when...
Page 117
ND-46248 (E) CHAPTER 3Page 97 Revision 2.0 INSTALLATION 5.2 Mounting DTI, DCH and DBM Card STEP 1: On the DTI (PN-24DTA-A/30DTC/30DTC-A) card, DCH (PN-SC01) card and DBM (PN-AP00) car d, s et the sw itch es as sh ow n in Fig ure s 3 -51 th rough 3- 53. Figure 3-51 Switch Settings on DTI Card (1 of 2) SEE Note. JPSJPR1 JPR0 MB SW CRC PCM FRM AIS [RMT] RMT [AIS] BLOFF ON 8 7 6 5 4 3 2 1 JPS JPR0 SENS RUN SW MB SET THE KNOB TO MATCH THE AP NO. (04-15) TO BE SET BY CM05. : POSITION TO...
Page 118
CHAPTER 3 ND-46248 (E) Pag e 98 Revision 2.0 INSTALLATION Figure 3-51 Switch Settings on DTI Card (2 of 2) LINE IMPEDANCE: RIGHT : 75 OHMS (FOR COAXIAL CABLE) LEFT : 120 OHMS (FOR TWISTED-PAIR CABLE) JP MB UP SENS RUN MB SW PCM FRM FMRM RMT MRMT AIS SW ONOFF SET THE KNOB TO MATCH THE AP NO. (04-15) TO BE SET BY CM05.SENS : POSITION TO BE SET 8 7 6 5 1 2 3 4 SEE Note. : POSITION TO BE SET JPS BALANCED TRANSMISSION (FOR TWISTED-PAIR CABLE) TA GROUNDING ON THE TRANSMIT LINE IS PROVIDED (FOR COAXIAL...
Page 119
ND-46248 (E) CHAPTER 3 Page 99 Revision 2.0 INSTALLATION Note: When only one DTI is provided, the clock signals are supplied to the PLO through DTI 0. The DTI 0 card must be mounted in PIM 0 and the SW settings are: . When multiple number of DTIs are provided, the system can supply the clock signals from DTI 0 or DTI 1. The system is synchronized to the DTI 0 clock signals normally, and if the DTI 0 clock supply route is failed, the DTI 1 takes over. Both DTI 0 and DTI 1 cards must be mounted in PIM 0....
Page 120
CHAPTER 3 ND-46248 (E) Pag e 10 0 Revision 2.0 INSTALLATION Figure 3-52 Switch Settings on DCH Card MB UP SW0 ONOFF SET THE KNOB TO MATCH THE AP NO. (04-15) TO BE SET BY CM05.SENS : POSITION TO BE SET 4 : POSITION TO BE SET. 3 1 12345678 ON SW1 SENS RUN MB SW0 LC LPB ATTENTIONContents Static Sensitive Handling Precautions Required ON OFF: NORTHERN TELECOM INTERFACE : AT&T INTERFACE 2