NEC Neax 2000 Ivs Wcs System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs Wcs System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 91
ND-46248 (E) CHAPTER 3 Page 71 Revision 2.0 INSTALLATION 4.9 Mounting CSH Card STEP 1: Mount the CSH card in the AP slots of PIM0 through PIM7. STEP 2: After mounting the card, set the SENSE switch to match an unequipped AP number in CM05. Set the MB switch to the down position to place the card in service. Figure 3-31 Mounting Location of CSH Card (1 of 3) Note: (1) When the system is equipped with only PIM0: The CSH card can be mounted in the AP0 through AP5, and AP8 slots. (2) When the system is...
Page 92
CHAPTER 3 ND-46248 (E) Pag e 72 Revision 2.0 INSTALLATION Figure 3-31 Mounting Location of CSH Card (2 of 3) CSH CARD BUILT-IN BATTERY Mount the CSH card in the AP slots (AP0-AP5). Set the SENSE switch on the CSH card to match an unassigned AP number in CM05 as shown below. SLOT NUMBER SWITCH SETTING VALUE 04 4 05 5 06 6 07 7 08 8 09 9 10 A 11 B 12 C 13 D 14 E 15 F PIM P W R LT00LT01LT02LT03LT04LT05LT06/AP0LT07/AP1LT08/AP2LT09/AP3LT10/AP4 AP5MP ATTENTIONContents Static Sensitive Handling Precautions...
Page 93
ND-46248 (E) CHAPTER 3 Page 73 Revision 2.0 INSTALLATION Figure 3-31 Mounting Location of CSH Card (3 of 3) CSH CARD BUILT-IN BATTERY Mount the CSH card in the AP slots (AP0-AP4). Set the SENSE switch on the CSH card to match an unassigned AP number in CM05 as shown below. SLOT NUMBER SWITCH SETTING VALUE 04 4 05 5 06 6 07 7 08 8 09 9 10 A 11 B 12 C 13 D 14 E 15 F PIM P W R LT00LT01LT02LT03LT04/AP0LT05/AP1LT06/AP2LT07/AP3 LT08/AP4MP ATTENTIONContents Static Sensitive Handling Precautions Required ...
Page 94
CHAPTER 3 ND-46248 (E) Pag e 74 Revision 2.0 INSTALLATION4.10 Connection of ZT Conne ct the ca b le to a ZT v ia the MDF as s h own in Fi gure 3 -32 . F igu re 3 -33 sh ow s LTC conn ec tor c orres spon ds wi th the LT slo ts, a nd CSI pin a ssig nm ent for e ach LT s lot, a nd F igu re 3-34 sh ow s an ex am ple of the c able c o nne ction w hen th e C SI card is moun ted in the LT00 s lot of PIM0. Figure 3-32 Cable Connection via MDF for ZT Modular MDF...
Page 95
ND-46248 (E) CHAPTER 3 Page 75 Revision 2.0 INSTALLATION Figure 3-33 Location of LT Slots and LTC Connectors for ZT (1 of 3) LT15/AP5FP/AP6MP/FP/AP7BUS/AP8 LT14/AP4 LT13/AP3 LT12/AP2 LT11/AP1 LT00 LT01 LT02 LT09 LT04 LT08 LT07 LT03 LT06 LT05 LT10/AP0 LTC0 LTC2LTC1 PIM 0, 2, 4, 6P W R LTC0 LTC1 LTC2 50 MN* 25 MJ* 50 25 50 25 49B5324A53 LT0549 BB3 24 AB3 LT1149 24 48 B52 23 A52 48 BB2 23 AB2 48 23 47 B51 22 A51 47 BB1 22 AB1 47 22 46 B50 21 A50 46 BB0 21 AB0 46 21 45B4320A43 LT0445 BA3 20 AA3 LT1045 20...
Page 96
CHAPTER 3 ND-46248 (E) Pag e 76 Revision 2.0 INSTALLATION Figure 3-33 Location of LT Slots and LTC Connectors for ZT (2 of 3) 50 MN* 25 MJ* 50 25 50 25 49 24 LT0249 24 LT0549 B93 24 A93 LT09 48 23 48 23 48 B92 23 A92 47 22 47 22 47 B91 22 A91 46 21 46 21 46 B90 21 A90 45 B23 20 A23 45 B53 20 A53 45 B83 20 A83 LT08 44 B22 19 A22 44 B52 19 A52 44 B82 19 A82 43 B21 18 A21 43 B51 18 A51 43 B81 18 A81 42 B20 17 A20 42 B50 17 A50 42 B80 17 A80 41 16 LT0141 16 LT0441 16 LT07 40 15 40 15 40 15 39 14 39 14 39...
Page 97
ND-46248 (E) CHAPTER 3 Page 77 Revision 2.0 INSTALLATION Figure 3-33 Location of LT Slots and LTC Connectors for ZT (3 of 3) MP LT08/AP4 LT07/AP3 LT06/AP2 LT05/AP1 LT00 LT01 LT02 LT03 LT04/AP0 LTC0LTC1P W R LTC0 LTC1 LTC2 50 MN 25 MJ 50 * 25 * 49 24 LT0349 24 LT08 48 23 48 23 47 22 47 22 46 21 46 21 45 B33 20 A33 45 B83 20 A83 44 B32 19 A32 44 B82 19 A82 43 B31 18 A31 43 B81 18 A81 42 B30 17 A30 42 B80 17 A80 41 16 LT0241 B73 16 A73 LT06/LT07 40 15 40 B72 15 A72 39 14 39 B71 14 A71 38 13 38 B70 13 A70...
Page 98
CHAPTER 3 ND-46248 (E) Pag e 78 Revision 2.0 INSTALLATION Figure 3-34 Example of Cable Connection via MDF for ZT (1 of 2) CAUTION: Incorrect wiring may cause severe damage to the equipment. PBX (PIM0, 2, 4, 6) BWB CSI TWISTED-PAIR CABLEMDF LTC0/LTC1/LTC2 CONNECTORMoldular Connector To ZT 26 RB0 1 RA0 27 TB0 2 TA0 28 RB1 3 RA1 29 TB1 4 TA1 30 RB2 5 RA2 31 TB2 6 TA2 32 RB3 7 RA3 33 TB3 8 TA3 34 9 35 10 36 11 37 12 38 13 39 14 40 15 41 16 42 17 43 18 44 19 45 20 46 21 47 22 48 23 49 24 50 25ZT No. 0 ZT...
Page 99
ND-46248 (E) CHAPTER 3 Page 79 Revision 2.0 INSTALLATION Figure 3-34 Example of Cable Connection via MDF for ZT (2 of 2) 12 3 4 5 6 7 8 Modular Connector (8)(1) Note:RJ-45 Modular Jack is highly recommended. Keep all wiring straight to the jack and perform all reverses at the cross connect for future chang- es. Assuming the PN-2CSI-A is in slot LTC0, please make the following connections. LTC0 RJ-45 White-Blue Yellow Blue-White Black White-Orange Green Orange-White Red TERMINAL NUMBERCOLORTERMINAL...
Page 100
CHAPTER 3 ND-46248 (E) Pag e 80 Revision 2.0 INSTALLATION 4.11 Connection of Battery CAUTION If battery terminals (+, –) contact with the module while connecting the battery cable to the PW86/PW91 card, the PW86/PW91 card or the BWB may be shorted. Therefore, the installer must perform work in accordance with the following steps when mounting or removing the batteries. (1) When mounting batteries: (a) Connect the battery cable to the batteries. (b) Mount the batteries into the appointed position of the...