NEC Neax 2000 Ivs Wcs System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs Wcs System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 41
ND-46248 (E) CHAPTER 2 Page 21 Revision 2.0 SYSTEM DESCRIPTION 2. Call Termination to Visitor PS a. The Home PBX receives the call to a Home PS from another PBX. b. The Home PBX refers the HLR information of the PS. c. From the Roaming Number contained in the HLR information, the Home PBX detects whether the Home PS is roaming. d. The Home PBX inquires of the Visitor PBX about the call termination to the Visitor PS. The inquiry contains the roaming data of the Visitor PS, such as Roaming Number and...
Page 42
CHAPTER 2 ND-46248 (E) Pag e 22 Revision 2.0 SYSTEM DESCRIPTION 4.4 Multi-Site Roaming System Condition 1. Trunk Multi-Site Roaming can be executed only on trunk connection between PBXs based on JT-Q931a pro- tocol. To each trunk route of JT-Q931a trunks, it can be specified whether Multi-Site Roaming is provided or not. The JT-Q931a trunks can be used by Single Line Telephone stations and Dterm stations for originating or receiving calls as same as common trunks. 2. Data Base Module An AP00 card for...
Page 43
ND-46248 (E) CHAPTER 3 Page 23 Revision 2.0 CHAPTER 3 INSTALLATION 1. GENERAL This chapter details the installation procedure to provide WCS functions to the PBX. 2. PRECAUTION IN HANDLING The installer must wear the grounded wrist strap to protect the circuit card from static electricity, when handling cards, and the installer must engage in the work on a grounded conductive work surface. Figure 3-1 Static Electricity Precautions (1 of 2) CARD FRONT PBX WRIST STRAP WHEN PLUGGING/UNPLUGGING A...
Page 44
CHAPTER 3 ND-46248 (E) Pag e 24 Revision 2.0 INSTALLATION Figure 3-1 Static Electricity Precautions (2 of 2) The mark shown below is attached to the sheet for the work in which circuit cards are handled. When engaging in such work, the installer must be careful not to cause damage by static electricity. WEAR A WRIST STRAP AND PERFORM THE WORK ON A GROUNDED CONDUCTIVE WORK SURFACE. WHEN CARRYING A CIRCUIT CARD AROUND, KEEP THE CARD IN THE CONDUCTIVE POLYETHYLENE BAG. CONDUCTIVE POLYETHYLENE BAG CIRCUIT...
Page 45
ND-46248 (E) CHAPTER 3 Page 25 Revision 2.0 INSTALLATION CARD FRONT PBX NEVER TOUCH THE COMPONENTS OR SOLDERED SURFACE WITH BARE HANDS. You must hold the card name label area, when plugging or unplugging the circuit card. If you touch another area, you may be exposed to hazardous voltages. CAUTION
Page 46
CHAPTER 3 ND-46248 (E) Pag e 26 Revision 2.0 INSTALLATION 3. EQUIPMENT AND CABLES Tab le 3 -1 belo w s how s t h e e qui pm en t re qui red when pro v idi ng the WCS i nte rface to the s y st em . Table 3-1 Required Equipment for WCS EQUIPMENT DESCRIPTION QUANTITY REMARKS (1) For Integrated Type/Adjunct Type ICS VS PIMN-UB - SN1273 PIMN-A - PZ-PW86 - PWR CNT (CA-A) - AC CORD-B-U - RACK PARTS Port Interface Module for WCS N N: 1-8 POWER MODULE-UB - SN1302 PWRMC-A - PWR CNT CA-B - RACK...
Page 47
ND-46248 (E) CHAPTER 3 Page 27 Revision 2.0 INSTALLATION (2) For Adjunct Type [1] The equipment above (1) except the PS are required with the following: PN-4COTB (COT) Central Office Trunk N N: Number of PS/4 PS Personal Station N N: 1-248 (3) For Adjunct Type [2] The equipment above (1) except the PS are required with the following: PN-24DTA-A/ 30DTC/30DTC- (DTI)24 channels DTI card N N: 1-5 PN-SC00 (CCH) Common Channel Handler card N N: 1-4 PS Personal Station N N: 1-162 Table 3-1 Required...
Page 48
CHAPTER 3 ND-46248 (E) Pag e 28 Revision 2.0 INSTALLATION 4. INSTALLATION PROCEDUREPerform th e in sta lla ti on of the eq uipme nt acc ord ing to th e pro ced ure shown in Fig ure 3-2. Figure 3-2 Installation Procedure (1 of 2) SEE SECTION 4.1. SEE SECTION 4.2. SEE SECTION 4.3. SEE SECTION 4.4. START SECURING OF BASE MOUNTING PWRM/PIM A AC POWER CABLE WIRING MOUNTING PWR CARD CONNECTION OF POWER MOUNTING FP CARD CABLES CONNECTION OF BUS CABLES SWITCH SETTINGS OFCIRCUIT CARDS SEE...
Page 49
ND-46248 (E) CHAPTER 3 Page 29 Revision 2.0 INSTALLATION Figure 3-2 Installation Procedure (2 of 2) SEE SECTION 4.8. SEE SECTION 4.9. END MOUNTING CSI CARD SEE SECTION 4.10. CONNECTION OF ZT A MOUNTING CSH CARD CONNECTION OF BATTERY SEE SECTION 4.11.
Page 50
CHAPTER 3 ND-46248 (E) Pag e 30 Revision 2.0 INSTALLATION 4.1 AC Power Cable Wiring STEP 1: Secure the BASE to the floor. For details, refer to the IVS Installation Procedure Manual. STEP 2: Secure the AC CORD-B-U/AC CORD-B-U1 cables to the FG, NEUTRAL and LINE terminals on the BASE as shown in Figure 3-3 and 3-4. Figure 3-3 Screwing AC CORD-B-U to Terminals Note: AC CORD - B - U ... to PW86 card in each PIM AC CORD - B - U1 ... to PW91 card in Power Module (PROVIDED WITH BASE)TO 120/240 V AC SOURCE...