Home > NEC > Communications System > NEC Neax 1000 Ivs Very Small Platform System Manual

NEC Neax 1000 Ivs Very Small Platform System Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 1000 Ivs Very Small Platform System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							 NDA-24219 CHAPTER 3
    Page 27
    Revision 2.0
    NAP-200-001
    Sheet 2/2
    Unpacking
    Figure 001-1  Unpacking Main Equipment
    ACCESSORIES
    PIM 
    						
    							CHAPTER 3 NDA-24219  
    Page 28
    Revision 2.0
    NAP-200-002
    Sheet 1/2
    Marking and Drilling
    1. CONFIRMING EQUIPMENT LAYOUT
    Install the equipment in an area that provides adequate ventilation and is easily accessible to service personnel.
    2. MARKING
    Locate and mark the wall mounting points as shown in Figure 002-1.
    Figure 002-1  Wall Mounting Points
    290 mm
    (11.6 inch)
    302 mm
    (11.9 inch)
    30 mm (1.2 inch)
    350 mm
    (13.8 inch)
    PBX BOTTOM POSITION ANCHOR (x4)
    354 mm
    (13.9 inch) PIM
    PIM
    PIM
    354 mm
    (13.9 inch)
    354 mm
    (13.9 inch)
    350 mm
    (13.8 inch) 302 mm
    (11.9 inch)302 mm
    (11.9 inch)
    30 mm (1.2 inch)30 mm (1.2 inch) 30 mm (1.2 inch) 30 mm (1.2 inch)209 mm
    (11.6 inch)ANCHOR (x4)
    ANCHOR (x4)
    30 mm (1.2 inch)
    ONE PIM CONFIGURATION TWO PIM CONFIGURATION 
    						
    							 NDA-24219 CHAPTER 3
    Page 29
    Revision 2.0
    NAP-200-002
    Sheet 2/2
    Marking and Drilling
    3. DRILLING 
    Install anchor bolts as shown in Figure 002-2.
    Figure 002-2  Installing Anchor Bolt
    (1) DRILL A HOLE IN THE CONCRETE WITH A 
    DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
    DEEPER THAN THE PLUG BOLT LENGTH.
    (2) INSERT THE ANCHOR BOLT INTO THE HOLE.
    (3) PUSH ANCHOR BOLT UNTIL THE BOLT 
    STAYS PERMANENTLY IN PLACE.
    (4) TURN BOLT COUNTERCLOCKWISE AND 
    REMOVE.(1) (2) (3) (4) 
    						
    							CHAPTER 3 NDA-24219  
    Pag e 3 0
    Revision 2.0
    NAP-200-003
    Sheet 1/12
    Installation of Main Equipment
    1. WALL-MOUNTING INSTALLATION 
    (1) When the system is two PIM configuration, connect PIMs with three bolts provided. 
    Figure 003-1  Connection of PIMs 
    						
    							 NDA-24219   CHAPTER 3
    NAP-2 00-003 
    						
    							CHAPTER 3 NDA-24219  
    Page 32
    Revision 2.0
    NAP-200-003
    Sheet 3/12
    Installation of Main Equipment
    (3) After hanging PIM onto the wall, tighten each M4 machine screw using a phillips screw driver. 
    Figure 003-2  Screwing PIM to Wall
    M4 MACHINE SCREW-B (X4)
    PIM 
    						
    							 NDA-24219 CHAPTER 3
    Pag e 33
    Revision 2.0
    NAP-200-003
    Sheet 4/12
    Installation of Main Equipment
    (4) Connect the TOP COVER to the upper PIM with four screws, and connect the BOTTOM COVER to the
    lower PIM with four screws.
    Figure 003-3  Connecting Covers
    TOP COVER
    BOTTOM COVER 
    						
    							CHAPTER 3 NDA-24219  
    Pag e 3 4
    Revision 2.0
    NAP-200-003
    Sheet 5/12
    Installation of Main Equipment
    (5) Connect the AC CORD-A-U to the AC INPUT connector on the PZ-PW86/PZ-PW112, and its FG cord
    to the FG terminal on the chassis.
    After connection of AC CORD-A-U to the AC INPUT connector, let the cord out of the PIM through the
    cable hole provided with bottom of the PIM.
    Figure 003-4  Connecting AC CORD to PIM
    PZ-PW86/
    PZ-PW112
    AC CORD-A-U
    FG CORD
    AC INPUT FG TERMINAL
    H5 (PROVIDED) FG CORDCABLE HOLE FOR 
    AC CORD-A-U 
    						
    							 NDA-24219   CHAPTER 3
    NAP-2 00-003
    B
    C
    A
    B
    C
    FRONT
    P IM 
    						
    							CHAPTER 3  NDA-24219    
    NAP-200-003
    R UB BER FOOT 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 1000 Ivs Very Small Platform System Manual