Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-25 Fault isolation procedures 
    2
    TN2301 has d isc onnec ted  from the SREPN, and  the SRP is no 
    long er in c ontrol. Connec tions have b een re-estab lished  b etween 
    the EI in the SREPN and  its EI/SNI c ounterp art in the Release 7r. 
    Fault isolation procedures
    Use the following  p roc ed ure to isolate faults on a fib er link. This sec tion c ontains 
    information on:
    n‘‘Fib er fault isolation’’
    n‘‘Loopback tests’’
    Fiber fault isolation
    !CAUTION:
    On systems with d up lic ated  Port Network Connec tivity (PNC), first b usyout 
    the standby PNC (busyout pnc-standby
    ) b efore b usying out any of the 
    following standby components:
    nFiber-Link (FIBER-LK)
    nSt a n d b y  Ex p a n s io n  I n t e r f a c e  ( EXP- I N TF)
    nSwitc h Nod e Interfac e (SNI)
    nDS1 Converter (DS1-CONV)
    !WARNING:
    Calls are d rop p ed when b usying  out of any of these c omp onents on a 
    simp lex PNC.
    !CAUTION:
    Be sure to release all b usied  out c omp onents after c omp leting  the tests.
    To isolate fib er link faults use two p roc ed ures:
    n‘‘Gather information’’
    n‘‘Test the fib er link hard ware’’
    Gather information
    1. Know whic h fiber sp an to isolate b y using  the link information (status 
    health
    ) reports from b oth the Release 7r and  the SREPN and  the 
    information in Tab le 2-7
    .
    2. Enter display alarms
     and press 
    En t e r. 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-26 Fault isolation procedures 
    2
    3. Type pnc
     in the Category
     field , then c hoose En t e r.
    NOTE:
    Sinc e the system is in Survive mod e, the Release 7r thinks it has lost 
    its c onnec tions to the EPN. Therefore, alarms may b e p resent, even 
    thoug h the p rob lem has been diag nosed  and  fixed .
    4. Look for any 
    on-b oard alarms other than the EI c irc uit p ac k. If there are 
    any, rep lac e the c irc uit p ac k. Do not rep lac e the EI c irc uit p ac k unless 
    there are on-board alarms.
    If No,
    5. Enter display errors
     and press 
    En te r.
    6. Type pnc
     in the Category
     field , then c hoose 
    En t e r.
    7. Check for any of the following errors:
    8. If you find 
    one or more of the ab ove errors, g o to Step  10.
    9. If you find 
    none o f  t h e  e r ro r s in  St e p  7 ,  t h e n  re s o l v e  a n y SN I -PEER e r ro r s .
    a . I f  t h e re  is  o n e  SN I  c irc u i t  p a c k  w i t h  m a n y  d i ff e re n t  SN I - PEER e rro r  
    types, replace the indicated SNI circuit pack
    b . I f  t h e re  a re  m a n y SN I -PEER e r ro r s  o f  t h e  sa m e  e rro r  t y p e ,  re p la c e  
    the indic ted  SNI c irc uit pac k using Tab le 2-10
    .
    Maintenance 
    ObjectError 
    Ty p e
    FIBER-LK Any
    SN I- B D 51 3
    EXP-INTF 257 769 
    770 
    1281 
    1537 
    3073 
    3074 
    3075 
    3076 
    3585 
    3841 
    3842 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-27 Fault isolation procedures 
    2
    c . After rep lac ing  an SNI c irc uit p ac k, c lear alarms b y exec uting  test 
    board UUCSS long clear
     for all alarmed  EXP-INTF c irc uit p ac ks. 
    Wait 5 minutes for any SNI-BD or SNI-PEER alarms to c lear.
    NOTE:
    You c an sp eed  this p roc ess with clear firmware counters 
    [a-pnc
    |b-pnc
    ] for the repaired PNC.
    10. Enter list fiber-link
     to g et the p hysic al loc ation of the fib er-link end p oints.
    11.  If a DS1 CONV is ad ministered  to the fiber-link (DS1 CONV is y
    ), enter 
    display fiber-link
      to d etermine the p hysic al loc ation of the DS1 CONV 
    c irc uit p ac ks on the fiber-link.
    12. Busyout the fiber link (busyout fiber-link 
    number).
    13. Test the fib er link (test fiber-link 
    number long
    ).
    14. If any tests in the sequenc e fail, p roc eed  with ‘‘
    Test the fiber link hard ware’’ 
    below.
    Table 2-10. SNI-PEER errors 
    Error Type SNI slot
    12
    257 3
    513 4
    769 5
    1025 6
    1281 7
    1537 8
    1793 9
    2049 13
    2305 14
    2561 15
    2817 16
    3073 17
    3329 18
    3585 19
    3841 20
    Continued on next page 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-28 Fault isolation procedures 
    2
    NOTE:
    Test #759 may fail if SNI c irc uit pac ks are p resent.
    15. If 
    all of the tests p ass, c lear the alarms b y exec uting  test board UUCSS 
    long clear
     f o r  a l l a la r m e d  EXP- I N TF c i rc u i t  p a c ks .  Wa it  5  m i n u t e s f o r  a n y 
    SNI-BD, SNI-PEER, FIBER-LK, or DS1C-BD alarms to c lear.
    NOTE:
    Test attemp ted  on the EI c irc uit pac k in the SREPN d o not run.
    NOTE:
    Th e  clear firmware counters 
    [a-pnc | b-pnc] c ommand  for the PNC 
    that was rep aired  may b e q uic ker than c learing  the alarms with the 
    test board UUCSS long clear
     c ommand .
    Test the fiber link hardware
    For eac h end p oint of the fib er link:
    1. Busyout the c irc uit p ac k (busyout board UUCSS
    ).
    2. Test the c irc uit p ac k (test board UUCSS long
    ) and  rec ord  all test failures. 
    When looking  at test results, c onsult the exp lanations for Fig ure 2-17
     and 
    Fi g u re  2 - 1 8
     later in this c hap ter.
    3. Does Board Not Assigned
     d isp lay for an Exp ansion Interfac e in an 
    EPN ? 
    a. If 
    Ye s, use the test maintenance long
     c ommand  to release an 
    Exp ansion Interfac e that may b e held  reset b y an EPN Maintenanc e 
    circuit pack.
    NOTE:
    Tests attemp ted  on the EI c irc uit p ac k in the SREPN d o not run.
    4. If 
    No, Did  EXP-INTF Test #242 fail? 
    a. If Yes, rep lac e the EI c irc uit p ac k and  the lig htwave transc eiver (if 
    p resent) and  g o bac k to Step  12 in the ‘‘
    Gather information’’ 
    p roc ed ure ab ove. 
    NOTE:
    EXP- I N TF Te s t  # 2 4 2  r u n s a n  o n - b o a rd  l o o p a ro u n d  if  n o  l ig h t w a v e  
    transc eiver is c onnec ted  to the EI.
    5. If 
    No, Did  SNI Test #757 fail? 
    a. If 
    Ye s, rep lac e the SNI c irc uit pac k and  go b ac k to Step  12 in the 
    ‘‘
    Gather information’’ p roc ed ure ab ove. 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-29 Fault isolation procedures 
    2
    6. If No, Did  SNI Test #756 fail? 
    a. If 
    Ye s, rep lac e the SNI c irc uit pac k and  the lig htwave transc eiver (if 
    p resent) and  g o bac k to Step  12 in the ‘‘
    Gather information’’ 
    p roc ed ure ab ove.
    7. If 
    No, Did  EXP-INTF Test #240 fail?
    a. If 
    Ye s, rep lac e the EI c irc uit p ac k and  g o b ac k to Step  12 in the 
    ‘‘
    Gather information’’ p roc ed ure ab ove.
    8. If
     No,  D i d  Te s t  # 2 3 8  ( EXP- I N TF)  o r Te s t  # 9 8 9  ( SN I )  f a il ? 
    a. If 
    Ye s, replac e the lig htwave transc eivers and  fib er-op tic  c ab le and  
    g o b ac k to Step  12 in the ‘‘
    Gather information’’ p roc edure ab ove. 
    b . The faulted  c omp onent c an b e further isolated  by using  information 
    in the ‘‘
    Loop b ac k tests’’ sec tion later in this c hap ter.
    c . If a fib er out of frame c ond ition exists and  lig htwave transc eivers 
    are used , c hec k that b oth lig htwave transc eivers are of the same 
    type, (9823A or 9823B). If they are not b oth the same, rep lac e one 
    of the lig htwave transc eivers so that they matc h. 9823A is used  for 
    d istanc es up  to 4900 feet (1493 m) and  9823B is used  for distanc es 
    up  to 25,000 feet (7620 m).
    9. If No, Is a DS1 CONV ad ministered on the fib er-link? 
    a. If 
    No and  the p rob lem is still p resent, follow normal esc alation 
    p roc ed ures.
    b . If 
    Ye s, is there an SNI-BD 513 alarmed  error (display errors
     for 
    category pnc
    )? If yes, replace cabling between the SNI circuit pack 
    and  the DS1C c irc uit p ac k. 
    c . If the alarm p ersists, first attempt the manual loop b ac k p roc ed ure 
    b elow, then rep lac e the DS1C and  the SNI c irc uit p ac ks and  g o 
    b ac k to Step  12 in the ‘‘
    Gather information’’ p roc ed ure ab ove.
    10. If 
    No,  if  t h e  c o n n e c t e d  c i rc u it  p a c k  is  a n  EXP-I N TF,  d i d  Te s t  # 2 3 8  f a i l? 
    a. If 
    Ye s,  re p l a c e  c a b l in g  b e t w e e n  t h e  EXP- I N TF c irc u i t  p a c k a n d  t h e  
    DS1C c irc uit p ac k. If Test #238 c ontinues to fail, rep lac e the DS1C 
    and  the EI c irc uit p ac ks and  g o b ac k to Step  12 in the ‘‘
    Gather 
    information’’ p roc ed ure ab ove.
    11. If 
    No, b usyout the c irc uit p ac k (busyout board UUCSS
    ).
    12. Test the c irc uit p ac k (test board UUCSS long) 
    for b oth DS1C c irc uit 
    p ac ks and  note all test failures and  aborts.
    NOTE:
    Test #790 fails with Error Cod e 1 when in Survive mod e. 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-30 Fault isolation procedures 
    2
    13. Did  the test return Board not inserted 
    for the near-end  c irc uit p ac k 
    (nearest the SPE),  o r  f o r  t h e  f a r- e n d  c irc u i t  p a c k i n  a  s im p l e x  PN C ?
    a.  If 
    Ye s, replac e the c abling  b etween the DS1C c irc uit p ac k and  the 
    SNI or EI c irc uit p ac k.
    b . Wait 1 minute and  retest.
    c . If the b oard  is still not inserted , rep lac e the DS1C c irc uit p ac k and  
    the EI or SNI c onnec ted  to it and  Go b ac k to Step  12 in the ‘‘
    Gather 
    information’’ p roc ed ure ab ove.
    14. If 
    No, visually c hec k to see if any CSU d evic es are loop ed  b ac k.
    a. Busyout the c irc uit p ac k (busyout board UUCSS
    ).
    b. Test for external loopback (test ds1-facility UUCSS external-loop
    ) 
    for eac h DS1 fac ility.
    NOTE:
    Many tests p ass if the system is in Survive mod e.
    15. Did  Test #788 p ass and  Test #789 fail? 
    a. If yes, rep lac e the DS1C and  lig htwave transc eiver (if p resent) at 
    the other end  of the DS1C c omplex. (See Figure 2-18
    )
    b . Go b ac k to Step  12 in the ‘‘
    Gather information’’ p roc ed ure ab ove.
    16. If 
    No, d id  Test #788 fail or ab ort and  Test #789 fail or abort? 
    a. If 
    Ye s, enter test ds1-facility UUCSS long
     for eac h ad ministered  
    and  eq uip p ed DS1 fac ility.
    NOTE:
    If the Switc h Nod e Interfac e (SNI) b oard ’s yellow LED is fast flashing  
    (0.1 sec  on/0.1 sec  off), it c an ind ic ate a p rob lem with the fib er from 
    the SNI b oard  to the SREPN. For more d etailed  information, refer to 
    the SNI-BD Maintenanc e Ob jec t in Chap ter 9 of 
    DEFINITY ECS 
    Release 7 Maintenanc e for R7r
    .
    Loopback tests
    The following section d escrib es loop b ack tests:
    n‘‘Fib er d irec t-c onnec t system’’
    n‘‘DS1 CONV system’’
    n‘‘Manual loop bac k p roc ed ure’’ 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-31 Fault isolation procedures 
    2
    Fiber direct-connect system
    Fi g u re  2 - 1 7 shows the loopbacks performed on the SNI and EI circ uit packs.
    Figure 2-17. Fiber fault isolation tests for SNI and EI circuit packs
    Fi g u re  2 - 1 7
     shows that:
    nTest #756 rep orts the result of the off-b oard  loop b ac k
    nTest #757 rep orts the result of the on-board  loop b ac k
    nTest #756 and  Test #757 c an run ind ivid ually or as p art of the test board 
    UUCSS
     long
     c ommand  for an SNI c irc uit p ac k.
    nTest #242 c an b e run as p art of the test board UUCSS long
     c ommand  for 
    an Exp ansion Interfac e c irc uit p ac k. In ad d ition to testing  on-board  
    c omp onents, this test is helpful for isolating  p rob lems 
    between a c irc uit 
    p ac k and  the lig htwave transc eiver
    .
    The loop b ac k shown in this d iag ram shows only part what Test #242 d oes. 
    If no lig htwave transc eiver is c onnec ted  to the Exp ansion Interfac e c irc uit 
    p ac k, an on-b oard  loop b ac k is p erformed on the Exp ansion Interfac e 
    c irc uit p ac k. For more information about Test #242, see the EXP-INTF 
    Maintenanc e Ob jec t in Chap ter 9 of 
    DEFINITY ECS Release 7 
    Maintenanc e for R7r
    .
    cydf058 RPY 022499
    TN753
    switch
    node
    interfaceTN570C
    expansion
    interface Te s t  #
    757Te s t  #
    756Te s t  #
    242Tone
    clock
    Tone
    detector
    DEFINITY
    ECSSREPN
    TDM
    BUS
    Fiber optic
    cable Back of
    cabinetBack of
    cabinet
    Lightwave
    transceivers Test #989
    (framing)Test #989
    (framing) 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-32 Fault isolation procedures 
    2
    DS1 CONV system
    Ad d itional DS1-CONV loop b ac k tests c an further isolate the p rob lem as shown in 
    Fi g u re  2 - 1 8
    .
    Figure 2-18. DS1 CONV loopback tests
    Fi g u re  2 - 1 8
     shows that:
    nIf Test #799 fails at LB1, the p rob lem is with DS1C #1, CSU #1, or the 
    c onnec tions b etween them.
    nIf Test #799 p asses at LB1 and  fails at LB2, the p rob lem is with CSU #1.
    nIf Test #799 p asses at LB1 and  at LB2, the p rob lem is with the DS1 fac ility, 
    CSU #2, c onnec tions to CSU #2, or DS1C #2.
    nFor more information about loopb ac k Tests #788 and  #789 (isolates the 
    lig htwave transc eiver), see the DS1 CONV-BD sec tion in Chap ter 9 of 
    DEFINITY ECS Release 7 Maintenanc e for R7r.
    Manual loopback procedure
    Lightwave transc eivers are not isolated  as p art of Exp ansion Interfac e or 
    DS1-CONV c irc uit p ac k tests. For examp le, when the Exp ansion Interfac e 
    Lightwave Transc eiver Loop around  Test (#242) and  the Exp ansion Interfac e 
    Loc al Loop Around  Test #240 p ass, this ind ic ates that the Exp ansion Interfac e 
    c irc uit p ac k is func tioning  prop erly, b ut it d oes not verify that the op tic al p ortion of 
    the lig htwave transc eiver is func tioning  p rop erly.
    To b eing  the manual loop bac k p roc ed ure:
    1. If d up lic ate Exp ansion Interfac e Links are availab le, issue the test board 
    UUCSS
     c ommand  on the stand by Exp ansion Interfac e c irc uit p ac ks on 
    b oth end s of fib er. 
    cydf059 KLC 022499
    DS1C DS1CCSU CSU
    DEFINITY
    ECS SREPN
    Lightwave
    transceiverTest #797 loops at
    internal interface
    for DS1 facility
    Test #789
    loops here
    DS1 facilityTest #799
    LB2Test #799
    LB1Tests 780,
    788, 797
    799 start
    here 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-33 Fault isolation procedures 
    2
    2. If this test p asses from b oth sid es, b ut other tests fail, suc h as Test #241, 
    this c ond ition ind ic ates either a faulty lig htwave transc eiver or a faulty fib er 
    c ab le. To d etermine if either a lig htwave transc eiver or the fib er itself has 
    failed, exec ute the Exp ansion Interfac e ‘‘
    Manual loop b ac k proc ed ure’’ 
    described below.
    NOTE:
    This test c an only b e run from b oth Exp ansion Interfac e c irc uit p ac ks 
    if they are the Stand by pair, and  if the Ac tive p air is working  p rop erly.
    Use this p roc ed ure when
    nUsing  DS1 CONV fac ilities and  a 9823A lig htwave transc eiver.
    nAn EI/SNI c irc uit p ac k c annot b e tested  b y software. For examp le, an EI 
    c irc uit p ac k loc ated  in an EPN that is d own c annot b e tested . This c an 
    oc c ur when c ommunic ation b etween the switc h nod e c arrier and  the SPE 
    is d own.
    !WARNING:
    This procedure is destructive; all calls are broken down.
    To b eg in the manual loop bac k p roc ed ure:
    1. Run  the c onfig uration aud it test (#759) on SNI c irc uit pac ks where 
    possible with test board UUCSS s
    . 
    2. Run the Proc essor Route Aud it Test (#760) with the test board UUCSS 
    long
     c ommand  for the ac tive SNC in the switc h nod e c arrier. If the ac tive 
    SNC is not inserted , Test #760 c an b e run with test hardware-group pnc 
    a-pnc
     or b-pnc
    .
    3. Determine whether more than one SNI is unab le to c ommunic ate with 
    software. Verify SNI and  SNC c irc uit p ac k insertion with the list 
    configuration carrier UUC
     c ommand  and  c hec k for SNI and  SNC 
    insertion for every ad ministered  switc h nod e c arrier.
    4. If all of the SNIs and  SNCs are not inserted  (No Board
     d isp lays for eac h 
    b oard) in the entire PNC (either the a-p nc  or the b -p nc ), then the link 
    b etween the PPN EI (on the PNC where SNI and  SNC c irc uit p ac ks did  not 
    insert) and  the c onnec ted  SNI is not func tioning  prop erly.
    a. Run the test board UUCSS
     c ommand on the PPN EI and  fix any 
    p rob lems found .
    b . Perform the manual loop b ac k p roc ed ure for the PPN EI.
    c . Perform the manual loop b ac k p roc ed ure for the SNI c onnec ted  to 
    t h e  PPN  EI .
    d . Rep lac e the ac tive SNC. 
    						
    							DEFINITY® Enterprise Communications Server Release 7 Installation and 
    Maintenance for Survivable Remote EPN  555-233-102  Issue 2
    June 1999
    SREPN Maintenance 
    2-34 Fault isolation procedures 
    2
    5. If the system has a two-level switc h node c arrier c onfig uration, that is (all 
    must ap p ly)
    nSNI-SNI fib er links exist
    nThe SNIs and  SNCs in the sec ond  switc h nod e c arrier only (the 
    switc h nod e c arrier that has no SNI c onnec ted  to the PPN EI) are 
    not inserted
    nAt least two SNI-SNI fib er links exist
    Then perform the following steps:
    a. Run the test board UUCSS long
     c ommand  on the SNIs in the first 
    switc h nod e c arrier that are c onnec ted to SNIs in the sec ond  switc h 
    nod e c arrier and  fix any p roblems found .
    b . Rep lac e the ac tive SNC.
    c . Perform the manual loop b ac k p roc ed ure for the SNIs in the sec ond  
    switc h nod e c arrier that are c onnec ted  to SNIs in the first switc h 
    nod e c arrier.
    6. If software is unab le to c ommunic ate with an EPN EI, but c an 
    c ommunic ate with the c onnec ted  SNI:
    a. Run the test board UUCSS long
     c ommand  on the c onnec ted SNI 
    and  fix any p rob lems found .
    b . Busyout the EI or SNI c irc uit p ac k (busyout board UUCSS
    ).
    7. Disc onnec t the transmit and  rec eive fib er p air from the fib er c onnec tors on 
    the b ac k of the c ab inet.
    NOTE:
    Note whic h is the transmit and  whic h is the rec eive sid e for 
    p roper re-c onnec tion at the end  of this p roc ed ure. 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual