Home > GE > Ultrasound System > GE Vivid E9 User Manual

GE Vivid E9 User Manual

Here you can view all the pages of manual GE Vivid E9 User Manual. The GE manuals for Ultrasound System are available online for free. You can easily download all the documents as PDF.

Page 81

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 74 
2.) Disconnect the Mains power cable from the wall outlet. 
3.) Disconnect all probes and external I/O cabling. 
4.) Remove the LCD monitor assembly. 
5.) Remove the Bulkhead cover and follow these steps to disconnect 
the cables from the Bulkhead board: 
 Disconnect the Power/USB PLUG from the Bulkhead board. 
 
 Bend the HDMI connector lock upwards, then disconnect the 
HDMI plug. 
To remove the LCD Arm assembly: 
 
 Slide the LCD...

Page 82

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 75 
upwards, until you can lift LCD arm assembly away. 
Install the LCD Arm Assembly 
To install the LCD arm assembly: 
 Carefully install the LCD arm assembly into position, first feeding 
the LCD Arm cables down through the console opening. 
 Push the LCD Mount Lock Handle into the locked position. 
LCD Mount Lock Handle 
 
 Connect the LCD cables to the connectors on the bulkhead. 
 Reinstall the bulkhead cover. 
 Reinstall the LCD...

Page 83

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 76 
 
 Remove the bumper cover from the end of the first arm. 
Remove the covers from all three arm sections of the arm assembly: 
 Remove the eight screws securing the first arm section cover. 
 Remove the eight screws securing the third arm section cover. 
 
 Remove the 16 screws securing the second arm section cover 
with Philips screwdriver. 
 
Third Arm Cover 
Removal 
Second Arm 
Section Cover 
Removal  

Page 84

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 77 
 Cut tie wraps securing cables and remove the cable(s) 
 Mark the cables: After removing the cable(s) to be replaced, 
stretch out both the existing and replacement cable side-by-side, 
and transfer any markings from existing cable to the replacement 
cable. 
Install the LCD Cables 
Warning: Do not over-stretch cables. Before putting the covers on the 
arms, be sure the arm has full pivot motion/rotation without stressing 
the cables....

Page 85

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 78 
 
 
 Feed cable through opening for second arm section making sure 
the markings line up with the midpoint placement location for 
the second arm. 
 Feed the cable through the opening of the third arm section. 
 
For the Video and Power cables, make sure the markings appear past 
the third arm LCD bracket and connect to the LCD bracket with clips 
shown below: 
First (left) Arm 
Section Midpoint 
Location 
Second Arm 
Section Midpoint...

Page 86

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 79 
 
Repeat steps for each cable replaced. 
 Secure the cables in the locations indicated in Figure 8-103. Band 
the tie wrap through the clamp. 
 Replace the second arm cover. 
 Replace the third arm cover. 
 Replace the first arm cover. 
 Replace the bumper cover 
 Reinstall the LCD arm. 
 Reinstall the LCD monitor. 
Rotate the arm to ensure that its movement is smooth and free from 
binding through a full 180° rotation with the arm...

Page 87

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 80 
Replacing Upper Operator Panel/Touch Panel 
Assembly 
 Power down the system. 
 Disconnect all probes and external I/O cabling. 
To remove the Upper OP Panel/Touch Panel assembly: 
 Remove all five OP Panel Knobs along the base of the upper OP 
Panel/Touch Panel assembly, 
 
 
 At the rear of the Vivid E9, release the console’s XY frogleg 
mechanism by inserting a screwdriver into the release point and 
pressing until it releases....

Page 88

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 81 
 Next disconnect the cables as shown below at the back of the 
Upper OP Panel/Touch Panel Assembly. 
 
 Lift out the Touch Screen Assembly and place it on an ESD safe 
surface. 
Re-Install Upper OP Panel/Touch Panel Assembly 
To re-install the Upper OP Panel/Touch Panel Assembly: 
 Place the Upper OP Panel/Touch Panel Assembly in the frame. 
 Ensure that all Ground cables are connected as shown below: 
 
 Connect the following cables...

Page 89

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 82 
7. Bulkhead Board USB Cable 1 (from bulkhead position closest 
to the OP) in position J24 
8. Bulkhead Board USB Cable 2 (from bulkhead position most far 
from the OP) in position J25 
 
 
 
 Install the Upper OP Panel/Touch Panel Assembly securing the 
five tabs and two hooks. 
 Install the four screws to the Back Cover from behind. 
 Install the five OP Panel Knobs. 
Use caution not to pinch 
or crimp the cables when 
replacing the...

Page 90

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 83 
Replace Lower Operator Panel 
Follow these steps to remove the Operator Panel: 
 Pull out the Alphanumeric keyboard to its extended position to 
get access to the screws in the next step. 
 Unscrew and remove the four screws used to mount the 
Operator Panel assembly to the Operator Panel tray. 
 
 Loosen the screws for the cables grounding on the Bulkhead 
Bracket and move the OP cables away from the bracket. 
 
 On the Bulkhead...