Home > GE > Ultrasound System > GE Vivid E9 User Manual

GE Vivid E9 User Manual

Here you can view all the pages of manual GE Vivid E9 User Manual. The GE manuals for Ultrasound System are available online for free. You can easily download all the documents as PDF.

Page 101

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 94 
Z-Mechanism replacement 
To prepare: 
 Power down the Vivid E9. 
 Disconnect all probes and external I/O cabling. 
 Remove the LCD Rear Cover. 
 Remove the LCD Monitor assembly. 
 Remove the LCD Arm assembly. 
 Remove the Operator Panel, Upper. 
 Remove the Operator Panel, Lower. 
 Remove the Bulkhead Board. 
 Remove the Bulkhead Plate. 
 Remove the Upper Frame Assembly. 
 Remove the Lower Frame Assembly. 
 Remove the XY...

Page 102

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 95 
 Lift Z Mechanism away. 
 
XYZ Control Assembly Replacement 
To prepare: 
 Power down the Vivid E9. 
 Disconnect the Mains Power Cable from the wall outlet. 
 Disconnect all probes and external I/O cabling. 
 Remove the Left Side Cover. 
 Remove the Rear Cover. 
 Remove the Top Cover. 
XYZ Control Assembly removal procedure: 
 Disconnect the cables to the XYZ Control Assembly. 
 Unscrew and remove two (2x) screws. 
 
  

Page 103

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 96 
 Pull the top of the XYZ Control Assembly forwards, up and away 
from the bracket. 
XYZ Control Assembly installation procedure: 
 Thread the XYZ Control Assembly into position. 
  Install the three screws at the top, rear. (M6x16 sunken. Torque: 
9.8 Nm.) 
 Install the two remaining screws on the top. (M4x8, sunken. 
Torque: 4.9 Nm.) 
 4.) Connect the cables to the XYZ Control Assembly. 
 5.) Install the Top Cover. 
 6.) Install...

Page 104

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 97 
 Disconnect the cables from the top of the power supply. 
 
 Remove the three screws that secure the MPS. 
 Ease the MPS away from the fang bracket. 
 Pull/slide the entire MPS backwards until the connectors to the 
FEP/Backplane are unseated and lift the MPS away. 
Logiq E9 Main Power Supply Replacement 
Follow these steps to remove the MPS: 
Disconnect the MPS cable and all cables from the top of the MPS: 
 AC output to...

Page 105

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 98 
Make sure the GFI PCIe cable is routed behind the MPS fang as shown 
on the left. This is for the GFI Configuration only. MRX systems do not 
have this cable. 
Slide the MPS forward to seat the connectors on the card cage. 
Engage the tab onto the Fang and install the three screws that secure 
the MPS with a 5 mm Allen wrench (Torque: 10 Nm {7.4 lb-ft}). 
Replace all cables and covers in reverse order of MPS removal 
procedure. 
Back End...

Page 106

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 99 
 
Logiq BEP replaceables: 
Hard Disk drive HDD 
BEP Power Supply 
EPS Battery Pack 
Vivid BEP replaceables: 
BEP5 power supply 
Hard Disk drive HDD 
Graphics adapter 
Fan 
If the old BEP is a BEP5 with 4D, and the replacement BEP is a BEP6, a 
new Graphics Adapter is needed. 
If the optional DVR Board is present it must be moved over from the 
old to the new BEP. 
To prepare for procedure: 
 Record the system’s TCP=P settings and...

Page 107

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 100 
If a new battery does not come installed in the replacement BEP FRU, 
transfer the battery into the new BEP. 
1. Disconnect all I/O cables and all cables from the top of the BEP. 
2. Loosen the thumb screws or screws at the top of the BEP cover, or 
the three screws that attach the cover to the BEP. Tilt the top of the 
BEP cover away from the BEP. 
3. All the connectors to the CB (ChargeBoard) must be “unlocked“ in 
order to remove...

Page 108

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 101 
 
 
Or, the Backplane cable, J3 (right) and J5 PCIe to the Card Rack on a 
GFI Configuration, using a BEP6 as shown below. Keep the cable to 
transfer to the replacement BEP. 
 
6. Slide the entire BEP away from the system approximately one inch, 
and finish removing the printer bracket then slide the entire BEP 
chassis out of the system. 
7. You will need to remove the following parts from the BEP, to 
reinstall in the replacement BEP:...

Page 109

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 102 
 Printer Bracket 
 BackPlane to BEP cable 
 Wireless Card and Antennas (if present) 
 Patient I/O (if present) 
 S Video Card (if present) 
Vivid E9 BEP Replacement 
This procedure is for Vivid E9 systems. Follow these steps to remove 
the BEP: 
1. Disconnect all I/O cables. 
2. Disconnect the cables from the top of the BEP. 
3. Unlatch the two latches that clamps the printer bracket to the top 
of the BEP. 
 
4. Tilt the front...

Page 110

 GE Logiq E9/Vivid E9 Training Manual 
© 2016 Conquest Imaging 103 
 
Loosen the BEP cover’s fixing screw(s): 
 BEP6 has two finger screws on the top of the BEP Cover. 
 Newer versions of the BEP5 have three Phillips screws, one on 
the top and one on each side of the BEP Cover. 
 Older BEP5 have one finger screw at the top of the BEP cover. 
Tilt the top of the BEP cover away from the BEP and set the cover 
aside. 
7. Remove the Printer Bracket from the BEP. 
8. Remove the two hex key screws at the...
Start reading GE Vivid E9 User Manual

Related Manuals for GE Vivid E9 User Manual

All GE manuals