GE Vivid E9 User Manual
Here you can view all the pages of manual GE Vivid E9 User Manual. The GE manuals for Ultrasound System are available online for free. You can easily download all the documents as PDF.
Page 91
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 84 Pull and lift the Operator Panel assembly up and away. Be careful to not damage the fingers on either side of the Lower Operator Panel and place it on an ESD safe surface. Replacing the Vivid E9 Trackball When preparing for the replacement, you must perform the following steps: Power down the Vivid E9. Disconnect the Mains Power Cable from the wall outlet. Disconnect all probes and external I/O cabling. Remove the Upper...
Page 92
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 85 Install the two fixing screws with washers so it locks the Trackball and Fixing Ring in the correct position. Connect the signal cable connectors to the Trackball. Re-Install the both the Upper and Lower Operator Panel. Remove the Lower Operator Panel Frame Follow these steps to remove the Lower Operator Panel Frame: Remove the two screws securing the main cable. Remove the five remaining screws from the bulkhead...
Page 93
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 86 From underneath the Frame, pull the Main cables through the frame opening to free the upper frame and remove it. Remove two plastic plate washers on either side of the bulkhead bracket. Remove the Lower Operator Panel Frame. Lower Frame Assembly Installation Follow these steps to install the Lower Operator Panel (LOP) Frame: Position the Lower Operator Panel Frame. Install the Upper Frame. Install the plastic plate...
Page 94
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 87 Remove Bulkhead Board To remove the bulkhead board: Disconnect the following cables from the bulkhead board: 1. The cable from main cable 2. The cables to both the left and right speakers 3. Two short USB cables (Bulkhead Board to OP) Unscrew and remove the two screws and remove the Bulkhead Board. Re-Install the Bulkhead Board To reinstall the Bulkhead Board: Slide the Bulkhead Board into the correct position. ...
Page 95
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 88 Power down the Vivid E9. Disconnect all probes and external I/O cabling. Remove five OP panel knobs. Remove the upper Operator Panel. Remove the two speaker assemblies. Remove the bulkhead board. Remove the lower Operator Panel. The bulkhead plate is used to secure the Upper UI Frame to the Lower UI Frame. To remove it: Remove the seven fixing screws shown below. 2.) Remove the bulkhead plate and the cable...
Page 96
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 89 3. The lower left-most screw is M6 x 30, Torque: 8.5 Nm. 4. The three other lower screws are M6 x 25, Torque: 8.5 Nm. Two of the screws are also fixing the Cable Clamp. XYZ Buttons and Button Board Replacement These buttons are also called the XYZ Buttons. The XYZ Buttons are located on the palm rest and control the XY and Z movement. Push one of the buttons marked “1”, and then reposition the XY (horizontal) location of the upper...
Page 97
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 90 Buttons Removal Procedure To remove the XYZ Buttons: Disconnect the cable to the XYZ Buttons. Gently pop the XYZ Buttons Frame out of the Palm Rest section of the Lower Op Panel frame handle. Buttons installation procedure: Insert the XYZ Buttons Frame into the Palm Rest section of the Lower Op Panel frame handle. Connect the cable to the XYZ Buttons Frame. Ensure the XYZ Buttons Frame cable runs along the Lower Op...
Page 98
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 91 Button IF Board removal procedure: Disconnect all the five (5x) connectors from the board. Push the TABs away to release the board. Remove the board. Button IF Board installation procedure: Install the Button IF Board into the UI Frame, Lower by pressing it under the small hooks. Ensure that the XYZ Buttons Frame cable runs along the Lower Op Panel cable channel so that the cable is not pinched when the Palm Rest is...
Page 99
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 92 Remove the four screws for the XY (Frogleg) mechanism and remove the XY mechanism. XY Mechanism Installation Procedure Position the XY mechanism so it aligns with the holes for the four fixing screws and install the four fixing screws. Install the Lower Frame Assembly. Install the Upper Frame Assembly. Install the Bulkhead Plate. Install the Bulkhead Board. Install the Operator Panel, Lower. Install the...
Page 100
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 93 XY Park Lock Replacement To Prepare: Unlock the XY Park Lock, either by using the release knobs or by manually releasing the lock: At the rear of the Vivid E9, release the console’s XY mechanism by inserting a screwdriver into the release point and pressing until release. XY Park Lock Removal Remove the four screws and carefully pull out the XY Park Lock assembly. Disconnect the cable at the connector and remove the XY...