GE Vivid E9 User Manual
Have a look at the manual GE Vivid E9 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 74 2.) Disconnect the Mains power cable from the wall outlet. 3.) Disconnect all probes and external I/O cabling. 4.) Remove the LCD monitor assembly. 5.) Remove the Bulkhead cover and follow these steps to disconnect the cables from the Bulkhead board: Disconnect the Power/USB PLUG from the Bulkhead board. Bend the HDMI connector lock upwards, then disconnect the HDMI plug. To remove the LCD Arm assembly: Slide the LCD Mount Lock Handle into unlocked position. Move the LCD arm from side to side at the same time pulling Cables at Bulkhead Note that in the photo the LCD mount lock handle is in the locked position. Do not adjust the nut on the LCD mount lock handle!
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 75 upwards, until you can lift LCD arm assembly away. Install the LCD Arm Assembly To install the LCD arm assembly: Carefully install the LCD arm assembly into position, first feeding the LCD Arm cables down through the console opening. Push the LCD Mount Lock Handle into the locked position. LCD Mount Lock Handle Connect the LCD cables to the connectors on the bulkhead. Reinstall the bulkhead cover. Reinstall the LCD monitor. Replacing the LCD Cables Preparations: When preparing for the replacement, you must perform the following steps: Power down the system. 3.) Disconnect all probes and external I/O cabling. 4.) Remove the LCD Monitor. 5.) Remove the LCD Arm. To remove the LCD Cables: Remove the two M4 x 8 screws holding the bumper cover to the arm. LCD Arm installed onto the UI Frame Upper When handling the arm, use the arm lock unless the arm is being turned. Locking will help stabilize the arm.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 76 Remove the bumper cover from the end of the first arm. Remove the covers from all three arm sections of the arm assembly: Remove the eight screws securing the first arm section cover. Remove the eight screws securing the third arm section cover. Remove the 16 screws securing the second arm section cover with Philips screwdriver. Third Arm Cover Removal Second Arm Section Cover Removal
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 77 Cut tie wraps securing cables and remove the cable(s) Mark the cables: After removing the cable(s) to be replaced, stretch out both the existing and replacement cable side-by-side, and transfer any markings from existing cable to the replacement cable. Install the LCD Cables Warning: Do not over-stretch cables. Before putting the covers on the arms, be sure the arm has full pivot motion/rotation without stressing the cables. If you are replacing more than one cable, begin with the thickest cable first! Follow these steps to install the LCD Cables: Holding the monitor-end of the cable and starting at the console- end of the first arm section, thread the replacement cable(s) through the arm sections toward the monitor-end. Feed the cable through the opening opposite the arm lock mechanism side of first arm section. Make sure the cable markings line up with the midpoint placement location for the first arm as shown below: Feed Cable Through First Arm
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 78 Feed cable through opening for second arm section making sure the markings line up with the midpoint placement location for the second arm. Feed the cable through the opening of the third arm section. For the Video and Power cables, make sure the markings appear past the third arm LCD bracket and connect to the LCD bracket with clips shown below: First (left) Arm Section Midpoint Location Second Arm Section Midpoint Location Feed Cable through Third Arm
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 79 Repeat steps for each cable replaced. Secure the cables in the locations indicated in Figure 8-103. Band the tie wrap through the clamp. Replace the second arm cover. Replace the third arm cover. Replace the first arm cover. Replace the bumper cover Reinstall the LCD arm. Reinstall the LCD monitor. Rotate the arm to ensure that its movement is smooth and free from binding through a full 180° rotation with the arm in the proper upright position with the LCD end up. LCD Mount Lock Replacement Procedure Follow these steps to remove the LCD Mount Lock: Remove the 2 screws securing the and remove the LCD Mount Lock. LCD Mount Lock reinstallation procedure: Position the LCD Mount Lock and install the two screws securing the LCD Mount Lock. Reinstall the Bulkhead Cover. Clip Location Securing Power and Video Cables to Bracket Note: Do not pull cables too tight. Before putting covers on arms, test arm motion and cable stress. NoteE: Rotate arm adapter assembly on arm to ensure movement is smooth and free from binding through full 180°. Note: It is not necessary to remove the LCD Monitor or the LCD Arm.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 80 Replacing Upper Operator Panel/Touch Panel Assembly Power down the system. Disconnect all probes and external I/O cabling. To remove the Upper OP Panel/Touch Panel assembly: Remove all five OP Panel Knobs along the base of the upper OP Panel/Touch Panel assembly, At the rear of the Vivid E9, release the console’s XY frogleg mechanism by inserting a screwdriver into the release point and pressing until it releases. Pull the console out to its extended position to gain access to the screws in the next step. Remove the four screws with washers from the Operator Panel’s back cover. Lift the Upper OP Panel/Touch Panel assembly slightly from the bottom, and then tilt the top toward the front of the Vivid E9. There are tabs at the bottom of the Touch Panel Assembly. Pull straight up on these tabs. Use ESD precautions! Ensure that the OP Panel is in its uppermost position with the top LCD out of the way: Two Screws on each side
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 81 Next disconnect the cables as shown below at the back of the Upper OP Panel/Touch Panel Assembly. Lift out the Touch Screen Assembly and place it on an ESD safe surface. Re-Install Upper OP Panel/Touch Panel Assembly To re-install the Upper OP Panel/Touch Panel Assembly: Place the Upper OP Panel/Touch Panel Assembly in the frame. Ensure that all Ground cables are connected as shown below: Connect the following cables to the Operator Panel: 1. Ribbon Cable from the Operator Panel, Lower 2. Trackball Cable from the Operator Panel, Lower 3. A/N Cable from the A/N Keyboard 4. Power/On-Off switch (part of Main Cable) in position J23 5. USB Cable 1 (part of Main Cable) in position J21 6. USB Cable 2 (part of Main Cable) in position J22 OP Grounding Do not apply stress on the Ribbon Cable. If it is stretched the connector on Operator Panel may be damaged.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 82 7. Bulkhead Board USB Cable 1 (from bulkhead position closest to the OP) in position J24 8. Bulkhead Board USB Cable 2 (from bulkhead position most far from the OP) in position J25 Install the Upper OP Panel/Touch Panel Assembly securing the five tabs and two hooks. Install the four screws to the Back Cover from behind. Install the five OP Panel Knobs. Use caution not to pinch or crimp the cables when replacing the panel!
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 83 Replace Lower Operator Panel Follow these steps to remove the Operator Panel: Pull out the Alphanumeric keyboard to its extended position to get access to the screws in the next step. Unscrew and remove the four screws used to mount the Operator Panel assembly to the Operator Panel tray. Loosen the screws for the cables grounding on the Bulkhead Bracket and move the OP cables away from the bracket. On the Bulkhead Bracket, loosen the ESD wire from the Lower Panel. View from Below with Drawer Extended