Home > GE > Ultrasound System > GE Vivid E9 User Manual

GE Vivid E9 User Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Vivid E9 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 74 
    2.) Disconnect the Mains power cable from the wall outlet. 
    3.) Disconnect all probes and external I/O cabling. 
    4.) Remove the LCD monitor assembly. 
    5.) Remove the Bulkhead cover and follow these steps to disconnect 
    the cables from the Bulkhead board: 
     Disconnect the Power/USB PLUG from the Bulkhead board. 
     
     Bend the HDMI connector lock upwards, then disconnect the 
    HDMI plug. 
    To remove the LCD Arm assembly: 
     
     Slide the LCD Mount Lock Handle into unlocked position. 
     Move the LCD arm from side to side at the same time pulling 
    Cables at 
    Bulkhead 
    Note that in the photo the 
    LCD mount lock handle is 
    in the locked position. 
     
    Do not adjust the nut on 
    the LCD mount lock 
    handle!  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 75 
    upwards, until you can lift LCD arm assembly away. 
    Install the LCD Arm Assembly 
    To install the LCD arm assembly: 
     Carefully install the LCD arm assembly into position, first feeding 
    the LCD Arm cables down through the console opening. 
     Push the LCD Mount Lock Handle into the locked position. 
    LCD Mount Lock Handle 
     
     Connect the LCD cables to the connectors on the bulkhead. 
     Reinstall the bulkhead cover. 
     Reinstall the LCD monitor. 
    Replacing the LCD Cables 
    Preparations: 
    When preparing for the replacement, you must perform the following 
    steps: 
    Power down the system. 
    3.) Disconnect all probes and external I/O cabling. 
    4.) Remove the LCD Monitor. 
    5.) Remove the LCD Arm. 
    To remove the LCD Cables: 
     Remove the two M4 x 8 screws holding the bumper cover to the 
    arm. 
     
     LCD Arm installed onto 
    the UI Frame Upper 
    When handling the arm, 
    use the arm lock unless 
    the arm is being turned. 
    Locking will help stabilize 
    the arm.  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 76 
     
     Remove the bumper cover from the end of the first arm. 
    Remove the covers from all three arm sections of the arm assembly: 
     Remove the eight screws securing the first arm section cover. 
     Remove the eight screws securing the third arm section cover. 
     
     Remove the 16 screws securing the second arm section cover 
    with Philips screwdriver. 
     
    Third Arm Cover 
    Removal 
    Second Arm 
    Section Cover 
    Removal  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 77 
     Cut tie wraps securing cables and remove the cable(s) 
     Mark the cables: After removing the cable(s) to be replaced, 
    stretch out both the existing and replacement cable side-by-side, 
    and transfer any markings from existing cable to the replacement 
    cable. 
    Install the LCD Cables 
    Warning: Do not over-stretch cables. Before putting the covers on the 
    arms, be sure the arm has full pivot motion/rotation without stressing 
    the cables. If you are replacing more than one cable, begin with the 
    thickest cable first! 
    Follow these steps to install the LCD Cables: 
     Holding the monitor-end of the cable and starting at the console-
    end of the first arm section, thread the replacement cable(s) 
    through the arm sections toward the monitor-end. 
     
     
     Feed the cable through the opening opposite the arm lock 
    mechanism side of first arm section. 
     Make sure the cable markings line up with the midpoint 
    placement location for the first arm as shown below: 
    Feed Cable 
    Through First Arm  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 78 
     
     
     Feed cable through opening for second arm section making sure 
    the markings line up with the midpoint placement location for 
    the second arm. 
     Feed the cable through the opening of the third arm section. 
     
    For the Video and Power cables, make sure the markings appear past 
    the third arm LCD bracket and connect to the LCD bracket with clips 
    shown below: 
    First (left) Arm 
    Section Midpoint 
    Location 
    Second Arm 
    Section Midpoint 
    Location 
    Feed Cable 
    through Third Arm  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 79 
     
    Repeat steps for each cable replaced. 
     Secure the cables in the locations indicated in Figure 8-103. Band 
    the tie wrap through the clamp. 
     Replace the second arm cover. 
     Replace the third arm cover. 
     Replace the first arm cover. 
     Replace the bumper cover 
     Reinstall the LCD arm. 
     Reinstall the LCD monitor. 
    Rotate the arm to ensure that its movement is smooth and free from 
    binding through a full 180° rotation with the arm in the proper 
    upright position with the LCD end up. 
    LCD Mount Lock Replacement Procedure 
    Follow these steps to remove the LCD Mount Lock: 
     Remove the 2 screws securing the and remove the LCD Mount 
    Lock. 
     
    LCD Mount Lock reinstallation procedure: 
     Position the LCD Mount Lock and install the two screws securing 
    the LCD Mount Lock. 
     Reinstall the Bulkhead Cover. 
    Clip Location 
    Securing Power 
    and Video Cables 
    to Bracket 
    Note: Do not pull cables 
    too tight. Before putting 
    covers on arms, test arm 
    motion and cable stress. 
    NoteE: Rotate arm 
    adapter assembly on arm 
    to ensure movement is 
    smooth and free from 
    binding through full 180°. 
    Note: It is not necessary to 
    remove the LCD Monitor 
    or the LCD Arm.  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 80 
    Replacing Upper Operator Panel/Touch Panel 
    Assembly 
     Power down the system. 
     Disconnect all probes and external I/O cabling. 
    To remove the Upper OP Panel/Touch Panel assembly: 
     Remove all five OP Panel Knobs along the base of the upper OP 
    Panel/Touch Panel assembly, 
     
     
     At the rear of the Vivid E9, release the console’s XY frogleg 
    mechanism by inserting a screwdriver into the release point and 
    pressing until it releases. Pull the console out to its extended 
    position to gain access to the screws in the next step. 
     
     
     Remove the four screws with washers from the Operator Panel’s 
    back cover. 
     Lift the Upper OP Panel/Touch Panel assembly slightly from the 
    bottom, and then tilt the top toward the front of the Vivid E9. 
    There are tabs at the bottom of the Touch Panel Assembly. Pull 
    straight up on these tabs. 
     
    Use ESD precautions! 
    Ensure that the OP Panel 
    is in its uppermost 
    position with the top LCD 
    out of the way: 
     
     
    Two Screws on each side   
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 81 
     Next disconnect the cables as shown below at the back of the 
    Upper OP Panel/Touch Panel Assembly. 
     
     Lift out the Touch Screen Assembly and place it on an ESD safe 
    surface. 
    Re-Install Upper OP Panel/Touch Panel Assembly 
    To re-install the Upper OP Panel/Touch Panel Assembly: 
     Place the Upper OP Panel/Touch Panel Assembly in the frame. 
     Ensure that all Ground cables are connected as shown below: 
     
     Connect the following cables to the Operator Panel: 
    1. Ribbon Cable from the Operator Panel, Lower 
    2. Trackball Cable from the Operator Panel, Lower 
    3. A/N Cable from the A/N Keyboard 
    4. Power/On-Off switch (part of Main Cable) in position J23 
    5. USB Cable 1 (part of Main Cable) in position J21 
    6. USB Cable 2 (part of Main Cable) in position J22 
    OP Grounding 
    Do not apply stress on the 
    Ribbon Cable. If it is 
    stretched the connector 
    on Operator Panel may be 
    damaged.  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 82 
    7. Bulkhead Board USB Cable 1 (from bulkhead position closest 
    to the OP) in position J24 
    8. Bulkhead Board USB Cable 2 (from bulkhead position most far 
    from the OP) in position J25 
     
     
     
     Install the Upper OP Panel/Touch Panel Assembly securing the 
    five tabs and two hooks. 
     Install the four screws to the Back Cover from behind. 
     Install the five OP Panel Knobs. 
    Use caution not to pinch 
    or crimp the cables when 
    replacing the panel!  
    						
    							 GE Logiq E9/Vivid E9 Training Manual 
    © 2016 Conquest Imaging 83 
    Replace Lower Operator Panel 
    Follow these steps to remove the Operator Panel: 
     Pull out the Alphanumeric keyboard to its extended position to 
    get access to the screws in the next step. 
     Unscrew and remove the four screws used to mount the 
    Operator Panel assembly to the Operator Panel tray. 
     
     Loosen the screws for the cables grounding on the Bulkhead 
    Bracket and move the OP cables away from the bracket. 
     
     On the Bulkhead Bracket, loosen the ESD wire from the Lower 
    Panel. 
    View from Below 
    with Drawer 
    Extended  
    						
    All GE manuals Comments (0)

    Related Manuals for GE Vivid E9 User Manual