GE Vivid E9 User Manual
Have a look at the manual GE Vivid E9 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 64 Module 8 Parts Replacement This section provides procedures and information for replacing spare parts on the E9 systems. Always follow the standard ESD and safety procedures when replacing parts or modules. Pay close attention to the part number when replacing parts: Most parts are labeled with the part number. Always replace like for like or check compatibility. Visually inspect all parts before installing. Some parts are different depending on BT level and/or SW. Some parts are only compatible with Logiq E9 or Vivid E9. System Power Down The system should be completely powered down before opening the chassis and beginning any parts replacement: Press the Power button on the Control Panel to power off the system. Select Shutdown from the touchscreen to shut down the system. The system is not fully shut down until the light on the operator panel turns off. After the system has fully shut down switch the MAINS circuit breaker on the back of the system to OFF. Unplug the AC power cord from wall socket. Chassis Cover Removal This section describes how to open up the chassis for repairs and maintanance. These should be removed in the following order: 1. Side Cover 2. Top Cover Check the model number and other vital information before ordering parts for the system. If the system is not fully shut-down when you switch off the mains breaker loss of data on the HD can occur. Wait 30 seconds or so for capacitors to discharge before opening system. If you need more detail refer to the company service manual.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 65 3. Foot Rest Bumper 4. Front Cover 5. Filter Cover 6. Rear Cover Replace the covers in reverse order. Side Covers The side covers are fastened with two “click” locks, located at the lower end of the cover. To remove the side covers: Insert a #1 phillips screwdriver into the rectangular hole in the side bumper until it reaches the lock mechanism. Push the handle on the screwdriver downwards to release the lock. Lift the cover backwards and up to remove it from the system. Top Cover To remove the top cover: First remove the side covers. Remove the two screws located near the handle and gently pull back and up. Foot Rest Bumper The foot rest bumper is fixed with snap locks. To remove the foot rest bumper: Pull the foot rest bumper upwards and over the pedals to release Side cover removal procedure is easier if you release the rear lock first. You may need to push down the pedals in order to remove the foot rest bumper.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 66 the snap locks, while freeing the side latches. Front Cover Follow these steps to remove the front cover: Remove the other panels and the foot rest bumper. Unscrew the two (2 pc) screws that fix the front cover assembly to the chassis. Pull the upper end of the front cover out and upwards to free it from the pedals and the frame. Back Filter Cover To remove the filter cover: Gently pull the filter cover out and away from the system. To replace the Filter Cover: Place into position and press the filter cover’s top corners until the filter cover locks engage. In the illustration the side cover is removed to show the Side Latch. It is not necessary to remove the side cover to remove the foot rest bumper. Inspect the Filter, and clean if necessary.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 67 Rear Cover There are four screws; two on each side of the cover. Remove the screws from both sides of the rear cover and lift it away from the chassis. When replacing the rear cover make sure the manual release handle of the Z Mechanism extends through the TOP air vent on the rear cover.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 68 Remove Bulkhead Cover At the rear of the system, release the console’s frogleg mechanism by inserting a screwdriver into the release point and pressing until release. Pull the console out to its extended position to gain access to the screws in the next step. Use thumbs to press upper lock tabs toward the front of the system to release the top of the Bulkhead Cover. Pull the Bulkhead Cover away from the system. Slots for Bulkhead Cover XY Release point
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 69 Remove Handle, Left/Right Top Handle Preparations: 1.) Power down the Vivid E9 and disconnect the Mains Power Cable. 2.) Remove the buttons below the Touch Panel. 3.) Remove the Upper Operator Panel. 4.) Remove the Lower Operator Panel. Hatches are used to attach the top handles to the lower User Interface. Be careful when doing this procedure. It is easy to break the plastic hatches The screwdriver positions shown below Release Hatches indicate where the hatches are located. Release Hatches Use a thin screwdriver to release the hatches, one by one as illustrated, until you can remove the handle. Handle Left Top / Handle Right Top reinstallation Remove the Gel Cups (if present). Install the Handle, Left Top / Handle, Right Top by pressing them into the lower UI Frame and replace the Gel Cups.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 70 Palm Rest Assembly Prepare: power down the Vivid E9 2.) Disconnect the Mains Power Cable from the wall outlet. 3.) Disconnect all probes and external I/O cabling. 4.) Remove the Upper Operator Panel. 5.) Remove the Lower Operator Panel. 6.) Remove Handle Left Top and Handle Right Top. Palm Rest Assembly Removal To remove the palm rest: Release the hatch lock mechanisms securing the palm rest assembly using the same method and cautions as with the handles and remove the palm rest assembly. To reinstall the palm rest assembly: Ensure the XYZ Buttons cable runs along the lower tray cable channel so that the cable is not pinched when the palm rest is replaced. Reinstall the other components in the opposite order from above.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 71 LCD Monitor Replacement Prepare for replacement: Move the top console to its lower locked position. Power down the system. Disconnect all probes and external I/O cabling. Logiq E9 LCD Monitor Replacement Logiq E9 systems come with two types of monitors: Original LCD Monitor (P/N 5167953) LCD Monitors used in R4 original consoles, LCD Monitor V2 (5392293-21, used in R4.x and later production) LCD Monitor (P/N 5167953) Replacement Tilt the LCD monitor forward to horizontal position. Unscrew the fixing screw on the rear side of the LCD monitor assembly ad remove the monitor cables cover. Disconnect the cables to the monitor. Remove the two clamps. If the device is equipped with the WLAN option, remove the WLAN dongle and transfer it to the new monitor. Lift the dongle, slightly to disengage the Velcro, and pull the dongle out of the USB port. Tilt the monitor back to vertical position. Lock the monitor back into it’s vertical position. Loosen the four screws by turning each screw between one half and one turn counter-clockwise. Lift the LCD Monitor assembly upwards until you can lift it away from the Monitor Bracket. Installing the new monitor: To be sure the system is level check that: The system is on a level surface. The wheels are in-line. Note: For Logiq monitor replacement check if the system uses WLAN. You may need to remove the dongle from beneath the cover of the monitor and replace it in the new monitor. If you are replacing any of the cables, you will also need to remove two additional tie-wraps at the bracket. It is not necessary to completely remove the screws. Ensure the LCD Monitor is installed level with the system before tightening the four screws:
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 72 The LCD monitor arm lock is LOCKED. Install the LCD monitor assembly on the monitor bracket. Verify that all four fixing screws have engaged in their slots. Use a level if available on the monitor while you tighten the four screws. Tilt the monitor to horizontal position and connect the cables. If the cables were replaced replace the tiewraps and cable clamps, if present. Reinstall WLAN dongle, if the system is equipped with the WLAN option and replace the back cover. LCD Monitor V2 (5392293-21) Replacement Remove the two LCD cable cover fixing screws. The LCD Cable is secured to the LCD with a retaining screw, an EMC shielded retainer and two phillips screws. Remove the screws and retainer. Disconnect the cable from the LCD. Keep the LCD monitor supported and remove the two M5x20 screws and spring “lock” washers which mount the LCD to the arm assembly. When installing the new monitor simply reverse the steps above and keep the system level by ensuring that: The system is on a level surface. The wheels are in-line. The LCD monitor arm lock is LOCKED. Vivid E9 LCD Monitor Replacement The backside cover of the LCD monitor assembly covers the two cables to the monitor. To gain access to the cable connectors, first remove the LCD rear cover: Tilt the LCD monitor forward to it is in the horizontal position. WARNING: When removing the LCD from the arm make sure the arm assembly is in the locked position! The assembly can spring open and cause damage and potential injury.
GE Logiq E9/Vivid E9 Training Manual © 2016 Conquest Imaging 73 Remove the two fixing screws from the back side of the LCD Monitor assembly and lift the cover. Disconnect the two cables shown below: Tilt the monitor back to its vertical position before removing the screws. Lift the LCD monitor assembly upwards away from the LCD arm bracket. Replace with the new LCD monitor. Replacing the LCD Arm assembly Vivid Preparations To prepare for replacement: 1.) Power down the Vivid E9 Screws