Home > GE > Ultrasound System > GE Logiq 9 Service Manual

GE Logiq 9 Service Manual

Here you can view all the pages of manual GE Logiq 9 Service Manual. The GE manuals for Ultrasound System are available online for free. You can easily download all the documents as PDF.

Page 381

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-83
8-16-4 Possible Behavior of the First Power Up After Application Load
After installing the new Application Software, if a new Front Panel code is needed:
The first time the Ultrasound application (echoloader) is run after the software upgrade, the application 
will detect that the Front Panel code is out of date. Because the Front Panel has to have power removed 
and...

Page 382

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-84 Section 8-16 - Optional Software Procedures
8-16-5 GE USB Control Panel Driver Loss (cont’d)
1.) Properly Power down the system.
2.) Ensure that your Service Dongle is installed on the USB port in the back of the system.
3.) Power up the system.
4.) Select MAINTENACE...
 to enter the maintenance mode.
5.) Leave the User name blank, enter the current service Password and select EXIT TO WINDOWS
.
6.)...

Page 383

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-85
8-16-5 GE USB Control Panel Driver Loss (cont’d)
11.) In the GENERAL
 Tab for the hardware device select REINSTALL DRIVER.
12.) Select NEXT
 in the Driver Upgrade Wizard.
13.) Ensure that the Search for a suitable driver for my device (recommended) button is highlighted and 
then click on NEXT
.
14.) From the Locate Driver Files window select Specify a location. Then...

Page 384

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-86 Section 8-16 - Optional Software Procedures
8-16-6 If the System is NOT on a Network
If the system is connected to a network, skip this section. 
If the system is NOT on a network, a static dummy IP-Address must be install in Windows for DICOM 
and Daignostics to function.
To install a Static IP-Address in windows:
1.) Boot up the system with the service dongle attached to the USB port.
2.) From the...

Page 385

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-87
7.) IF the local Area Connections Status Window is displayed, as shown in Figure 8-97, click on 
PROPERTIES
.
8.) Hightlight INTERNET PROTOCOL (TCPIP)
 and select PROPERTIES as shown in Figure 8-
98.
9.) Select Use this following IP address.  Fill in:
* IP-Address: 3.28.28.28
* Subnet Mask : 255.255.252.0Figure 8-97  Connection Status Window
Figure 8-98  TCPIP...

Page 386

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-88 Section 8-16 - Optional Software Procedures
Figure 8-99  Static Network Settings in Windows 

Page 387

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-89
Section 8-17
AC Transformer Replacement Procedure
8-17-1 Manpower
1 person, 1 hour + travel.
8-17-2 Tools
Phillips screwdriver
8-17-3 Preparations (click here to view the cover removal video)
1.) Power Down/Shutdown the system as described in Section 4-3-2 on page 4-3.
2.) Remove the left- and/or right-side covers as shown in Section 8-2-2 on page 8-5.
3.) Remove the...

Page 388

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-90 Section 8-17 - AC Transformer Replacement Procedure
8-17-4 AC Transformer Removal Procedure
1.) Loosen screw A, B and C (See Figure 8-100) a few turns. Unscrew screw D and E while you hold 
AC Transformer to prevent it from tilting forwards.
2.) Push AC Transformer to the left, tilt it forwards to free screw keyholes from screw heads (A,B and 
C) and lift the transformer off hooks along its the...

Page 389

GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL 
Chapter 8 Replacement Procedures 8-91
8-17-5 AC Transformer Installation Procedure (cont’d)
.
7.) Compare Rat Guard with illustration in Figure 8-101 above. If it is not already done, use a hack saw 
or metal shears and modify Rat Guard according to this illustration.
8.) Install Rat Guard.
9.) Secure Rat Guard with five (5) new plastic expansion plugs, P/N 080X3141.
10.) Install the Lower Rear Cover as...

Page 390

GE MEDICAL SYSTEMSPROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3  LOGIQ™ 9 PROPRIETARYMANUAL   
8-92 Section 8-18 - Monitor Assembly Replacement Procedure
Section 8-18
Monitor Assembly Replacement Procedure
8-18-1 Manpower
2 persons, 1 hour
8-18-2 Tools
#2 Phillips screwdriver
5 mm Hexagon key 
8-18-3 Preparations (click here to view the cover removal video)
1.) Power Off/Shutdown the system as described in Section 4-3-2 on page 4-3.
2.) .Remove the Monitor cover: Refer to Figure 8-102 and Figure...
Start reading GE Logiq 9 Service Manual

Related Manuals for GE Logiq 9 Service Manual

All GE manuals