Home > Aimco Brakes > Torque Measurement > Aimco Brakes Freedom3 SPC Sqnet User Manual

Aimco Brakes Freedom3 SPC Sqnet User Manual

Here you can view all the pages of manual Aimco Brakes Freedom3 SPC Sqnet User Manual. The Aimco Brakes manuals for Torque Measurement are available online for free. You can easily download all the documents as PDF.

Page 61

 
 
   [email protected]     
61  
 
After the route is created, user has to add tests or tightening programs to the route: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
On the bottom part of route management window, it’s displayed the tree structure with all tests 
belong to location. 
After test is selected (left button of mouse), click on the green arrow to add test to the route or 
click on the red arrow to remove test from the route. When finished, close the window and the...

Page 62

62 
 
Note: it’s only possible to send more than one route to the wrench, if user need to divide test or 
programs for area or shift or just organize better the work is possible to create “group” inside the 
route, see below “how to create Group inside a route” 
 
How to create one or more “Groups” inside a route 
Once the route is created it’s possible to organize the job editing “Groups”. 
On the left side of the window “Route management”, click on “new group” icon ...

Page 63

 
 
   [email protected]     
63  
 
 
 
It will appear a new window: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In the field “Group name” insert the name of the group. 
Note: the “Group name” can be chosen considering how user wants to organize the work, for 
example using shift name (in case Freedom³ is used by different operators in different shifts), or 
area name where the wrench will be used (so it’s possible to create a group for every single work 
area where the wrench will be used), or operator...

Page 64

64 
 
type of group is used specially when for example in a car, there is only one typology of that specific 
screw and it’s not possible complete all the numbers of screws. 
Select right “strategy” 
By SQnet is also possible select which strategy Freedom³ has to apply during the execution of 
group considering customer needs. 
 
Count only ok results -> Selecting this strategy, Freedom³ will count to complete the test only “OK” 
results, that means if one test is composed of 3 screws, operator must get...

Page 65

 
 
   [email protected]     
65  
 
 
On the right part of the window “Route Management” will appear the Group created : 
 
 
 
 
 
 
 
 
Name of the group and group number [1]  

Page 66

66 
 
 
 
 
 
Under title bar “Group list” there are 3 icons: 
 
ICON FUNCTION 
 
Edit New Group 
 
Modify an existing Group 
 
Delete a Group 
 
  
 
Note: it’s possible to edit more groups inside a route,  
 
To add Control Quality test or Tightening operation in a Group (Job), select the test or the 
operation before added in the route (see paragraph hoe to create a route). 
 
 
 
 
 
 
Route created previously 
Click on “plus” button to 
open the group  

Page 67

 
 
   [email protected]     
67  
 
 
Select one by one, test or operation to add to the Group (job) and press “right arrow” button to 
add to the group 
 
 
 
 
In the lower-right corner of the window is possible to: 
 
 
 
Phase nr. field  will be activated only if the “strategy” selected for the test or operation is “=n case 
of error go to another phase”.   
 
Select test or operation to add to the group 
Click on right 
arrow to add the 
selected test to the 
group 
Test already added to 
the...

Page 68

68 
 
 
 
 
The phase is the number linked to a test or operation, see below: 
 
 
 
The red highlighted ring is the associate number for test or operation (phase). 
When operator start a group (job) on Freedom³, first test to have will be the test indicates with 
number “1”.  
 
 
 
 
By “Up” and “Down” arrows is possible modify the sequence of the test (changing the sequence 
will be modified the phase number in relation to the position user will assign).   
By “X” icon is possible to remove a test or...

Page 69

 
 
   [email protected]     
69  
Once route and job\s are created is possible to send it to Freedom³, close the window “route 
management” and automatically SQnet will save the route and groups. 
 
See next paragraph for sending route to Freedom³. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  

Page 70

70 
 
 
How to send a route to Freedom³ SPC 
 
 
STEP -1- 
Before to send a route to Freedom³ user has to 
connect USB cable  
 
 
             
        
          
        
       
        
  
 
 
 
 
 
 
 
STEP -2- 
Once USB cable is connected to computer and Freedom³, switch on Freedom³ and from the main 
page select “Synchronize” icon. 
 
 
 
             
             
             
           
  
 
 
 
 
 
USB CABLE  
Start reading Aimco Brakes Freedom3 SPC Sqnet User Manual

Related Manuals for Aimco Brakes Freedom3 SPC Sqnet User Manual

All Aimco Brakes manuals