Aimco Brakes Freedom3 SPC Sqnet User Manual
Here you can view all the pages of manual Aimco Brakes Freedom3 SPC Sqnet User Manual. The Aimco Brakes manuals for Torque Measurement are available online for free. You can easily download all the documents as PDF.
Page 71
[email protected] 71 After clicking, Freedom³ will wait for SQ-Net communication: STEP -3- On PC, in the SQ-Net main page, click on Freedom³ SPC interface icon:
Page 72
72 Freedom³ interface window will appear: See below for the meaning of icons: ICON FUNCTION Edit New Freedom³ Modify Freedom³ Delete Freedom³ Receive data from Freedom³ Send route to Freedom³
Page 73
[email protected] 73 STEP -4- Click on =t will be appear “Add new Freedom³” window: User must write Freedom³ serial number (if user writes a wrong s/n, the communication will fail). “Notes” is not a obligatory field. Confirm to save and exit to “Freedom³ interface window” Select the Freedom³ added
Page 74
74 Select the route to send to Freedom³ from the combo box: Click on send On the right part of the window will appear the communication between SQ-Net and Freedom³. When the route is sent, at the end of log appear the message “Data sending complete” Note: =f the message “Data sending complete” don’t appear, please check USB cable connection, and verify the s/n of Freedom³
Page 75
[email protected] 75 STEP -5- After route is sending press “ESC” button on Freedom³: ESC Then Freedom³ will restart, after few seconds on the display will appear the message “route imported”: Press Ok button to continue.
Page 76
76 How to send a route to Freedom³ PRW STEP -1- Before to send a route to Freedom³ user has to connect USB cable STEP -2- Once USB cable is connected to computer and Freedom³, switch on Freedom³ and from the main page select “Synchronize” icon. STEP -3- USB CABLE
Page 77
[email protected] 77 A new window will appear, touch the button “USB/Radio” to start the synchronization: Subsequently user must confirm synchronization, pushing confirm button on Freedom³ keyboard:
Page 78
78 After selection, Freedom³ will start the synchronization modality: The wrench is waiting for communication with SQnet. STEP -4- On PC, in the SQ-Net main page, click on Freedom³ interface (PROD) icon:
Page 79
[email protected] 79 STEP -5- A new window appears: Using the combo box highlighted in the screenshot, select the route to send to Freedom³. STEP -6- Once selected the route, all the operation that belong to the route will appear in the window: Click on the “green arrow” to send the route to Freedom³ PRW Note: the “green arrow” is used to receive data-results also. Select Route
Page 80
80 STEP -7- On the right side of the window (Freedom³ interface PROD), user can see the status of data transfer. When Freedom³ finishes to receive the route on the last row of “Logs” window will appear the message “Data sending completed” (see above the picture ). STEP -8- After the message “Data sending completed” is appeared on “Logs” windows, it’s possible press “ESC” button on Freedom³. The wrench will restart automatically in synchronization menu:...